Probabilistic Assessment of Deteriorating Prestressed Concrete Box-Girder Bridges under Increased Vehicle Loads and Aggressive Environment

A probabilistic procedure for the assessment of the time-dependent reliability of existing prestressed concrete (PSC) box-girder bridges is presented. These bridges are subject to increased traffic loads and an aggressive environment, which result in structural deterioration such as cracking and corrosion. In this paper, a multiple-peak vehicle load model is proposed based on acquired traffic load data, which cannot be properly described by previous single-peak probability distributions. With the proposed vehicle load model, the maximal vehicle loads during the remaining life of bridges are obtained for evaluating the influence of the increase in traffic loads on bridge reliability. Time-dependent corrosion models are adopted to account for pitting corrosion because of chloride attack as well as uniform corrosion because of concrete carbonation. A degenerated shell element is used for accurate and efficient modeling of the PSC box-girder. Postcracking behaviors of reinforced concrete box-girders, simulated by using different crack models and elements, are compared with laboratory test results. To increase the efficiency of probabilistic analyses, an adaptive importance sampling method in conjunction with the truncated Latin hypercube sampling is used. Application of the proposed methodologies is demonstrated by a case study, in which the time-dependent reliabilities of a deteriorating PSC box-girder bridge are obtained.

[1]  Robert E. Melchers,et al.  RELIABILITY OF DETERIORATING RC SLAB BRIDGES , 1997 .

[2]  Cruz Alonso,et al.  Comparison of rates of general corrosion and maximum pitting penetration on concrete embedded steel reinforcement , 1995 .

[3]  T. Zimmerman,et al.  Numerical evaluation of the rotating crack model , 1998 .

[4]  Dirk P. Kroese,et al.  Simulation and the Monte Carlo method , 1981, Wiley series in probability and mathematical statistics.

[5]  Guo Tong,et al.  Fatigue Life Prediction of Welded Joints in Orthotropic Steel Decks Considering Temperature Effect and Increasing Traffic Flow , 2008 .

[6]  D. Hordijk Local approach to fatigue of concrete , 1991 .

[7]  Andrew Chan,et al.  Residual capacity of corroded reinforcing bars , 2005 .

[8]  Qiusheng Li,et al.  Experimental studies on shear lag of box girders , 2002 .

[9]  Dimitri V. Val,et al.  Probabilistic evaluation of initiation time of chloride-induced corrosion , 2008, Reliab. Eng. Syst. Saf..

[10]  Wang Jian-xiu ANALYSIS OF TIME-DEPENDENT RELIABILITY OF RC HIGHWAY BRIDGES CONSIDERING CHLORIDE ATTACK AND CONCRETE CARBONATION , 2007 .

[11]  Reuven Y. Rubinstein,et al.  Simulation and the Monte Carlo Method , 1981 .

[12]  Arnaud Castel,et al.  Effect of stress corrosion cracking on stress–strain response of steel wires used in prestressed concrete beams , 2009 .

[13]  Yang Liu,et al.  Experimental study on strain and deformation monitoring of reinforced concrete structures using PPP-BOTDA , 2009 .

[14]  Juan R. Casas,et al.  A comprehensive traffic load model for bridge safety checking , 1997 .

[15]  Dan M. Frangopol,et al.  Redundancy and robustness of highway bridge superstructures and substructures , 2010, Structures and Infrastructure Systems.

[16]  M. Stein Large sample properties of simulations using latin hypercube sampling , 1987 .

[17]  Tommy H.T. Chan,et al.  Bridge live load models from WIM data , 2002 .

[18]  Alfred Strauss,et al.  Advanced Life-Cycle Analysis of Existing Concrete Bridges , 2008 .

[19]  C. Bucher Adaptive sampling — an iterative fast Monte Carlo procedure , 1988 .

[20]  Malcolm R Leadbetter,et al.  Stationary and Related Stochastic Processes: Sample Function Properties and Their Applications , 1967 .

[21]  Mark G. Stewart,et al.  Mechanical behaviour of pitting corrosion of flexural and shear reinforcement and its effect on structural reliability of corroding RC beams , 2009 .

[22]  Mark G. Stewart,et al.  Time-dependent reliability of deteriorating reinforced concrete bridge decks , 1998 .

[23]  Michael P. Enright,et al.  Probabilistic analysis of resistance degradation of reinforced concrete bridge beams under corrosion , 1998 .

[24]  R. G. Selby,et al.  Three-dimensional Constitutive Relations for Reinforced Concrete , 1993 .

[25]  J. Beck,et al.  A new adaptive importance sampling scheme for reliability calculations , 1999 .

[26]  Byung Hwan Oh,et al.  Advanced automatic generation scheme of prestressing tendons for efficient FE analysis of PSC shell structures , 2004 .