The Emergency Scheduling Engineering in Single Resource Center
暂无分享,去创建一个
[1] Henri Pierreval,et al. Analysis of robustness in proactive scheduling: A graphical approach , 2010, Comput. Ind. Eng..
[2] Liu Chun,et al. Two-Objective Optimization Model for Discrete Emergent Supply System , 2003 .
[3] Yan Wang,et al. An Optimized Emergency Resources Allocation Algorithm for Large-Scale Public Emergency , 2007, 2007 International Conference on Machine Learning and Cybernetics.
[4] Suh-Jenq Yang,et al. Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities , 2010 .
[5] Leon J. Osterweil,et al. Disruption-Driven Resource Rescheduling in Software Development Processes , 2010, ICSP.
[6] Fritz Gehbauer,et al. Optimized resource allocation for emergency response after earthquake disasters , 2000 .
[7] Marianthi G. Ierapetritou,et al. Robust optimization for process scheduling under uncertainty , 2008 .
[8] R. Ocampo-Pérez,et al. Adsorption of Fluoride from Water Solution on Bone Char , 2007 .
[9] Li Jin,et al. Multi-resource emergency scheduling model and algorithm in disaster chain , 2011 .
[10] Botond Kádár,et al. Stability-oriented evaluation of rescheduling strategies, by using simulation , 2007, Comput. Ind..
[11] Chuanli Zhao,et al. Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan , 2010 .
[12] Leon J. Osterweil,et al. Dynamic scheduling of emergency department resources , 2010, IHI.