Cost and Service-Level-Based Model for a Seru Production System Formation Problem with Uncertain Demand
暂无分享,去创建一个
Ye Wang | Jiafu Tang | Jiafu Tang | Ye Wang
[1] Sandjai Bhulai,et al. Simple Methods for Shift Scheduling in Multiskill Call Centers , 2008, Manuf. Serv. Oper. Manag..
[2] Yong Yin,et al. The Evolution of Seru Production Systems Throughout Canon , 2008 .
[3] Wei Sun,et al. Line-hybrid seru system conversion: Models, complexities, properties, solutions and insights , 2017, Comput. Ind. Eng..
[4] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[5] Alexandre Dolgui,et al. Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint , 2013 .
[6] Danny J. Johnson,et al. Converting assembly lines to assembly cells at sheet metal products: insights on performance improvements , 2005 .
[7] Yong Yin,et al. Production planning of multi-stage multi-option seru production systems with sustainable measures , 2015 .
[8] Loo Hay Lee,et al. The sample average approximation method for empty container repositioning with uncertainties , 2012, Eur. J. Oper. Res..
[9] Jiafu Tang,et al. Multi-objective optimization model for seru production system formation under uncertain condition , 2017, 2017 International Conference on Service Systems and Service Management.
[10] Ikou Kaku,et al. Modeling and numerical analysis of line-cell conversion problems , 2009 .
[11] Ikou Kaku,et al. Mathematical analysis and solutions for multi-objective line-cell conversion problem , 2014, Eur. J. Oper. Res..
[12] Kristine M. Kuhn,et al. Variable pay as a risky choice: Determinants of the relative attractiveness of incentive plans , 2003 .
[13] Yong Yin,et al. Reconfiguration of assembly systems: From conveyor assembly line to serus , 2012 .
[14] Jie Zhang,et al. A sample average approximation regularization method for a stochastic mathematical program with general vertical complementarity constraints , 2015, J. Comput. Appl. Math..
[15] Yong Yin,et al. Training and assignment of multi-skilled workers for implementing seru production systems , 2013 .
[16] Shabbir Ahmed,et al. Supply chain design under uncertainty using sample average approximation and dual decomposition , 2009, Eur. J. Oper. Res..
[17] Ikou Kaku,et al. Seru: The Organizational Extension of JIT for a Super-Talent Factory , 2012, Int. J. Strateg. Decis. Sci..
[18] Roberto Rossi,et al. An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints , 2011, Eur. J. Oper. Res..
[19] Wei Sun,et al. Combining local search into non-dominated sorting for multi-objective line-cell conversion problem , 2013, Int. J. Comput. Integr. Manuf..
[20] Hamed Rafiei,et al. Multi-objective dynamic cell formation problem: A stochastic programming approach , 2016, Comput. Ind. Eng..
[21] Thierry Moyaux,et al. A new multi-objective mathematical model for dynamic cell formation under demand and cost uncertainty considering social criteria , 2016 .
[22] Ikou Kaku,et al. How to carry out assembly line–cell conversion? A discussion based on factor analysis of system performance improvements , 2012 .
[23] Pierre L'Ecuyer,et al. Staffing Multiskill Call Centers via Linear Programming and Simulation , 2008, Manag. Sci..