The Procedure Used in the Probabilistic Transfer Capability Analysis of the Mapp Region Bulk Transmission System
暂无分享,去创建一个
M. Lauby | J. Doudna | R. Polesky | P. Lehman | D. Klempel
[1] M. G. Lauby,et al. Effects of Pooling Weather Associated MAPP Bulk Transmission Outage Data on Calculated Forced Outage Rates , 1984, IEEE Power Engineering Review.
[2] M. G. Lauby,et al. Mapp Bulk Transmission Outage Data Collection and Analysis , 1984, IEEE Transactions on Power Apparatus and Systems.
[3] Transmission Reliability Task Force. Bulk Power Area Reliability Evaluation Considering Propabilistic Transfer Capability , 1982 .
[4] Allen J. Wood,et al. Determination or Reserve Requirements or Two Interconnected Systems , 1963 .
[5] T. A. Mikolinnas,et al. Application of Adequacy Assessment Techniques for Bulk Power Systems , 1982, IEEE Transactions on Power Apparatus and Systems.
[6] G. Ejebe,et al. Automatic Contingency Selection , 1979, IEEE Transactions on Power Apparatus and Systems.
[7] K. A. Clements,et al. LINEAR PROGRAMMING VS. NETWORK FLOW METHODS APPLIED TO BULK POWER SUPPLY ADEQUACY ASSESSMENT. , 1800 .
[8] G.L. Landgren,et al. A reliability approach to interconnection planning , 1975, IEEE Transactions on Power Apparatus and Systems.
[9] B. Wollenberg,et al. An Advanced Contingency Selection Algorithm , 1981, IEEE Transactions on Power Apparatus and Systems.
[10] G. Landgren,et al. Analysis and Prediction of Tranmissiion Unit Performance Using Advanced Regression Models , 1985, IEEE Transactions on Power Apparatus and Systems.