Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions
暂无分享,去创建一个
Peter Knights | Micah Nehring | Amin Mousavi | Mehmet S. Kizil | Farzad Sotoudeh | Amin Mousavi | P. Knights | M. Kizil | F. Sotoudeh | M. Nehring
[1] Mustafa Kumral,et al. Heuristic stope layout optimisation accounting for variable stope dimensions and dilution management , 2017 .
[2] Doreen A. Thomas,et al. Network optimization for the design of underground mines , 2007 .
[3] Xiaoyu Bai,et al. Underground stope optimization with network flow method , 2013, Comput. Geosci..
[4] Hamdy A. Taha,et al. Operations research: an introduction / Hamdy A. Taha , 1982 .
[5] Erkan Topal,et al. Integrated short and medium term underground mine production scheduling , 2012 .
[6] Gavin M. Mudd. One Australian perspective on sustainable mining: declining ore grades and increasing waste volumes , 2004 .
[7] Kourosh Shahriar,et al. A 3D approximate hybrid algorithm for stope boundary optimization , 2020, Comput. Oper. Res..
[8] Kourosh Shahriar,et al. Stope boundary optimization: A mathematical model and efficient heuristics , 2019 .
[9] Erkan Topal,et al. A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining , 2008 .
[10] Erkan Topal,et al. A heuristic approach to optimal design of an underground mine stope layout , 2015, Appl. Soft Comput..
[11] Erkan Topal,et al. Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming , 2011 .
[12] Erkan Topal,et al. A new algorithm for stope boundary optimization , 2010 .
[13] Erkan Topal,et al. Production schedule optimisation in underground hard rock mining using mixed integer programming , 2007 .
[14] R Hauta,et al. Mine schedule optimisation with ventilation constraints: a case study , 2017 .
[15] R. V. Ramani,et al. Generalized multiperiod MIP model for production scheduling and processing facilities selection and location , 1986 .
[16] Vijay Sharma,et al. LONGTERM SCHEDULE OPTIMIZATION OF AN UNDERGROUND MINE UNDER GEOTECHNICAL AND VENTILATION CONSTRAINTS USING SOT , 2015 .
[17] Alexandra M. Newman,et al. A solution approach for optimizing long- and short-term production scheduling at LKAB's Kiruna mine , 2011, Eur. J. Oper. Res..
[18] Nicholas C. Wormald,et al. Network optimisation of underground mine design , 2001 .
[19] J. M. Pinto,et al. Mixed-Integer Linear Programming Model for Refinery Short-Term Scheduling of Crude Oil Unloading with Inventory Management , 1996 .
[20] J. Hyam Rubinstein,et al. Cost Optimisation for Underground Mining Networks , 2005 .
[21] Peter J. Stuckey,et al. Short-term planning for open pit mines: a review , 2019 .
[22] Erkan Topal,et al. Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling , 2008 .
[23] Andrea J. Brickey. Underground production scheduling optimization with ventilation constraints , 2015 .
[24] Nicholas C. Wormald,et al. Decline design in underground mines using constrained path optimisation , 2008 .
[25] Celal Karpuz,et al. Shortest path optimization of haul road design in underground mines using an evolutionary algorithm , 2019, Appl. Soft Comput..
[26] Micah Nehring. Stope sequencing and optimisation in underground hardrock mining , 2006 .
[27] Masoud Monjezi,et al. The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II) , 2019, Resources Policy.
[28] Mohammad Ataei,et al. Application of Sequential Gaussian Conditional Simulation to Underground Mine Design Under Grade Uncertainty , 2020 .
[29] Guoqing Li,et al. Integrated optimisation of stope boundary and access layout for underground mining operations , 2019 .
[30] Torgny Almgren,et al. An approach to long range production and development planning with application to the Kiruna Mine, Sweden , 1994 .
[31] Hani S. Mitri,et al. State-of-the-art review of backfill practices for sublevel stoping system , 2015 .
[32] E. Chanda,et al. An application of integer programming and simulation to production planning for a stratiform ore body , 1990 .
[33] R. Dimitrakopoulos,et al. Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping , 2007 .
[34] Melvyn W. Jeter. Mathematical Programming: An Introduction to Optimization , 1986 .
[35] Mohammad Ataei,et al. Development of a computer program for underground mine stope optimisation using a heuristic algorithm , 2017 .
[36] Suzana Lutovac,et al. Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty , 2019, Mathematical Problems in Engineering.
[37] Micah Nehring,et al. Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations , 2016 .
[38] Mustafa Kumral,et al. Sublevel stope layout planning through a greedy heuristic approach based on dynamic programming , 2020 .
[39] Yashar Pourrahimian,et al. Mathematical programming applications in block-caving scheduling: a review of models and algorithms , 2015 .
[40] W. A. Hustrulid,et al. Underground mining methods handbook , 1982 .
[41] Nicholas C. Wormald,et al. Optimisation in the design of underground mine access , 2004 .
[42] Mohammad Ataei,et al. Introducing a User-friendly Computer Program for Determining the Location of Underground Stopes , 2020 .
[43] Mustafa Kumral,et al. A planning approach for polymetallic mines using a sublevel stoping technique with pillars and ultimate stope limits , 2020 .
[44] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[45] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[46] Jin Song Dong,et al. Non-dominated Sorting Genetic Algorithm , 2019, Multi-Objective Optimization using Artificial Intelligence Techniques.
[47] Amin Mousavi,et al. Optimisation of production planning for an innovative hybrid underground mining method , 2019 .
[48] A. S. Nhleko,et al. Application of Particle Swarm Optimization Algorithm to Optimize Stope Layout for Underground Mines , 2019 .
[49] Mehmet S. Kizil,et al. Economic and Environmental Impacts of Utilising a Pre-concentration Process in Underground Metal Mining , 2019 .
[50] Erkan Topal,et al. Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.
[51] J. West,et al. Decreasing Metal Ore Grades , 2011 .
[52] Erkan Topal,et al. A new mathematical programming model for production schedule optimization in underground mining operations , 2010 .
[53] Majid Ataee-Pour. A heuristic algorithm to optimise stope boundaries , 2000 .
[54] Nailian Hu,et al. A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling , 2020 .
[55] Rade Tokalić,et al. Optimisation of underground mine decline development system using genetic algorithm , 2014 .
[56] Zeinab Basiri. Stopes Layout and Production Scheduling Optimization in Sublevel Stoping Mining , 2018 .
[57] J. M. Pinto,et al. A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .
[58] M. Ataee-pour. A Critical Survey of the Existing Stope Layout Optimization Techniques , 2005 .
[59] Martin L. Smith. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX , 1998 .
[60] D. A. Thomas,et al. Optimising declines in underground mines , 2003 .
[61] Erkan Topal,et al. Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming , 2010 .
[62] Chao-Hsien Pan,et al. A study of integer programming formulations for scheduling problems , 1997, Int. J. Syst. Sci..
[63] Erkan Topal,et al. Simultaneous optimisation of stope layouts and long term production schedules , 2011 .
[64] Mustafa Kumral,et al. Underground mine planning: stope layout optimisation under grade uncertainty using genetic algorithms , 2018, International Journal of Mining, Reclamation and Environment.
[65] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[66] Erkan Topal,et al. Integrated optimization of underground mine design and scheduling , 2013 .
[67] Milos Gligoric,et al. Model of room and pillar production planning in small scale underground mines with metal price and operating cost uncertainty , 2020 .