Use of new ranging tool to position a vertical well adjacent to a horizontal well

This paper reports that as part of a heavy-oil pilot project, three vertical wells had to be drilled in close proximity to the horizontal section of a horizontal well. Because the separation distances specified were smaller than the position uncertainty associated with conventional directional surveying, a special electromagnetic ranging technique had to be developed. The technique proved reliable and was used to complete the project successfully.