Strategies for enhancing agility of make‐to‐order manufacturing systems

This paper relates to make‐to‐order (MTO) manufacturing environment. Initially, the various issues of concern and problems encountered in relation to typical MTO systems are presented to emphasize why agility is required in such systems. The need to have better performance measures is discussed. How some of the problems related to typical MTO systems were dealt with in the past is discussed, by highlighting the salient features of some selected contributions made towards enhancing agility in MTO systems. An outline of the system presently being developed by the author for concurrent and integrated management of MTO manufacturing organisations, which is conceived mainly as an agile management system for MTO environment, is also presented.

[1]  K. R. Baker,et al.  An investigation of due-date assignment rules with constrained tightness , 1981 .

[2]  Rakesh Nagi,et al.  'Just-in-time' production of large assemblies , 1996 .

[3]  Gary L. Ragatz,et al.  A framework for the study of due date management in job shops , 1984 .

[4]  G. Harhalakis THE USE OF PROJECT SCHEDULING FOR THE MANUFACTURE OF CUSTOM MADE PRODUCTS , 1989 .

[5]  B. J. Davies,et al.  The Phased Release of Batches into a Job Shop , 1984 .

[6]  Ju-Hyung Park,et al.  A Collaborative Scheduling System for Make-to-Order Manufacturing , 1996 .

[7]  Ilias P. Tatsiopoulos,et al.  Lead time management , 1983 .

[8]  N. S. Adshead,et al.  Adaptive scheduling: the use of dynamic due dates to accommodate demand variance in a make-for-stock shop , 1988 .

[9]  Luk N. Van Wassenhove,et al.  Hierarchical integration in production planning: Theory and practice , 1982 .

[10]  Hiroshi Awane,et al.  Input scheduling and load balance control for a job shop , 1984 .

[11]  Brian G. Kingsman,et al.  A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .

[12]  B. Kingsman,et al.  Production planning systems and their applicability to make-to-order companies , 1989 .

[13]  Joseph C. Montgomery,et al.  The transition to agile manufacturing : staying flexible for competitive advantage , 1996 .

[14]  Angappa Gunasekaran,et al.  AGILE MANUFACTURING: ENABLERS AND AN IMPLEMENTATION FRAMEWORK , 1998 .

[15]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .