Strategies for enhancing agility of make‐to‐order manufacturing systems
暂无分享,去创建一个
[1] K. R. Baker,et al. An investigation of due-date assignment rules with constrained tightness , 1981 .
[2] Rakesh Nagi,et al. 'Just-in-time' production of large assemblies , 1996 .
[3] Gary L. Ragatz,et al. A framework for the study of due date management in job shops , 1984 .
[4] G. Harhalakis. THE USE OF PROJECT SCHEDULING FOR THE MANUFACTURE OF CUSTOM MADE PRODUCTS , 1989 .
[5] B. J. Davies,et al. The Phased Release of Batches into a Job Shop , 1984 .
[6] Ju-Hyung Park,et al. A Collaborative Scheduling System for Make-to-Order Manufacturing , 1996 .
[7] Ilias P. Tatsiopoulos,et al. Lead time management , 1983 .
[8] N. S. Adshead,et al. Adaptive scheduling: the use of dynamic due dates to accommodate demand variance in a make-for-stock shop , 1988 .
[9] Luk N. Van Wassenhove,et al. Hierarchical integration in production planning: Theory and practice , 1982 .
[10] Hiroshi Awane,et al. Input scheduling and load balance control for a job shop , 1984 .
[11] Brian G. Kingsman,et al. A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .
[12] B. Kingsman,et al. Production planning systems and their applicability to make-to-order companies , 1989 .
[13] Joseph C. Montgomery,et al. The transition to agile manufacturing : staying flexible for competitive advantage , 1996 .
[14] Angappa Gunasekaran,et al. AGILE MANUFACTURING: ENABLERS AND AN IMPLEMENTATION FRAMEWORK , 1998 .
[15] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .