Production planning and Order Acceptance: an Integrated Model with Flexible Due Dates

We study a tactical problem integrating production planning with order acceptance decisions. We explicitly consider the dependency between the workload (and work-in-process inventory) and lead times. In the new model, orders are accepted/rejected and their processing period is determined. This problem is formulated as a mixed integer linear program for which two relax-and-fix heuristic solution methods are proposed. The first one decomposes the problem based on time periods while the second decomposes it based on orders. The performances of these heuristics are compared with the performance of a commercial solver. The numerical results show that the time-based relax-and-fix heuristic outperforms the order-based relax-and-fix heuristic and the solver solution as it yields better integrality gaps for much less CPU time.

[1]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[2]  El-Houssaine Aghezzaf,et al.  Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times , 2015 .

[3]  N. Brahimi A Relax-and-Fix Heuristic for a Production Planning Problem with Order Acceptance and Flexible Due Dates , 2013 .

[4]  Joseph Geunes,et al.  Requirements Planning with Pricing and Order Selection Flexibility , 2006, Oper. Res..

[5]  Kerem Akartunali,et al.  A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..

[6]  V. Cristina Ivanescu,et al.  Makespan estimation and order acceptance in batch process industries when processing times are uncertain , 2002, OR Spectr..

[7]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[8]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[9]  Tarik Aouam,et al.  Integrated production planning and order acceptance under uncertainty: A robust optimization approach , 2013, Eur. J. Oper. Res..

[10]  Joseph Geunes,et al.  Models for Integrated Production Planning and Order Selection , 2002 .

[11]  Hamdy A. Taha,et al.  Operations research: an introduction / Hamdy A. Taha , 1982 .

[12]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[13]  A. Srinivasan,et al.  Resource Pricing And Aggregate Scheduling In Manufacturing Systems , 1988 .

[14]  Hartmut Stadtler,et al.  Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..

[15]  Patrizia Beraldi,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..

[16]  Reha Uzsoy,et al.  Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .

[17]  Steven T. Hackman,et al.  Production Economics: Integrating the Microeconomic and Engineering Perspectives , 2007 .

[18]  J. Geunes,et al.  Uncapacitated production and location planning models with demand fulfillment flexibility , 2006 .

[19]  Paul M. Griffin,et al.  Order selection and scheduling with leadtime flexibility , 2004 .

[20]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[21]  David L. Woodruff,et al.  Production planning with load dependent lead times: an update of research , 2007, Ann. Oper. Res..

[22]  Egon Balas,et al.  Integer Programming , 2021, Encyclopedia of Optimization.

[23]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[24]  R. Uzsoy,et al.  Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times , 2012 .

[25]  Albert P. M. Wagelmans,et al.  A Dynamic Lot-Sizing Model with Demand Time Windows , 1999, Manag. Sci..

[26]  Awi Federgruen,et al.  Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems , 1999 .

[27]  Susan A. Slotnick,et al.  Order acceptance and scheduling: A taxonomy and review , 2011, Eur. J. Oper. Res..