Part grouping in ELSP
暂无分享,去创建一个
Julio Juan García Sabater | Pilar Isabel Vidal Carreras | José Pedro García Sabater | Juan A. Marin-Garcia | Julio Juan García Sabater | J. P. G. Sabater | Pilar Isabel Vidal Carreras
[1] Peter L. Jackson,et al. A review of the stochastic lot scheduling problem 1 This paper is based upon work supported in part , 1999 .
[2] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[3] Gregory Dobson. The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..
[4] Vincent A. Mabert,et al. Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .
[5] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[6] Amit Eynan,et al. The Benefits of Flexible Production Rates in the Economic Lot Scheduling Problem , 2003 .
[7] Suresh P. Sethi,et al. Flexibility in manufacturing: A survey , 1990 .
[8] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .