A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability

Display Omitted This paper deals with a production-inventory model where shortages are partially backlogged.The papers investigates the effects of partially integrated production and marketing policy.A soft computing algorithm based on Particle Swarm Optimization-Constriction factor is developed.To illustrate and validate the production-inventory model a numerical example is solved.A sensitivity analysis is done to study the effect of changes in parameters on optimal policies. This paper formulates a production-inventory model to investigate the effects of partially integrated production and marketing policy of a manufacturing firm. Demand is assumed to be variable and dependent on the selling price and marketing cost. Also, different inventory costs are considered as interval valued. Shortages are permitted and partially backlogged with a rate dependent on the waiting time. Considering that manufacturing process generates defective units four possible cases have been identified and studied. Basically, the optimization problems (maximization problem for Marketing department and minimization problems for Production and Research & Development departments) have been formulated and solved. For solving these optimization problems, an efficient soft computing algorithm based on Particle Swarm Optimization-Constriction factor (PSO-CO) is proposed. In order to illustrate and validate the production-inventory model a numerical example is solved. Finally, a sensitivity analysis is done to study the effect of changes of different system parameters on optimal policies.

[1]  Dilip Roy,et al.  Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm , 2010, Appl. Math. Comput..

[2]  M.-F. Wu,et al.  Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues , 2011 .

[3]  R. N. Mukherjee,et al.  A marketing-oriented inventory model with three-component demand rate dependent on displayed stock level (DSL) , 2005, J. Oper. Res. Soc..

[4]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..

[5]  Singa Wang Chiu,et al.  Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..

[6]  Hui-Ming Wee,et al.  Revisiting revenue management for remanufactured products , 2013, Int. J. Syst. Sci..

[7]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products , 2015, Int. J. Syst. Sci..

[8]  Ali Akbar Shaikh,et al.  A deterministic model for deteriorating items with displayed inventory level dependent demand rate incorporating marketing decisions with transportation cost , 2011 .

[9]  DaeSoo Kim,et al.  OPTIMAL AND HEURISTIC DECISION STRATEGIES FOR INTEGRATED PRODUCTION AND MARKETING PLANNING , 1993 .

[10]  S. Sana,et al.  ON A VOLUME FLEXIBLE PRODUCTION POLICY FOR A DETERIORATING ITEM WITH TIME-DEPENDENT DEMAND AND SHORTAGES , 2004 .

[11]  Hui-Ming Wee,et al.  An economic production quantity model with non-synchronized screening and rework , 2014, Appl. Math. Comput..

[12]  Leopoldo Eduardo Cárdenas-Barrón,et al.  An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .

[13]  K. S. Chaudhuri,et al.  Three-layer supply chain - A production-inventory model for reworkable items , 2012, Appl. Math. Comput..

[14]  Angappa Gunasekaran,et al.  An integrated production-inventory-marketing model for deteriorating items , 1995 .

[15]  Singa Wang Chiu,et al.  Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..

[16]  K. S. Chaudhuri,et al.  An optimal shipment strategy for imperfect items in a stock-out situation , 2011, Math. Comput. Model..

[17]  S. Ladany,et al.  The Interaction of Economic Ordering Quantities and Marketing Policies , 1974 .

[18]  Russell C. Eberhart,et al.  A new optimizer using particle swarm theory , 1995, MHS'95. Proceedings of the Sixth International Symposium on Micro Machine and Human Science.

[19]  Maurice Clerc,et al.  The particle swarm - explosion, stability, and convergence in a multidimensional complex space , 2002, IEEE Trans. Evol. Comput..

[20]  Kun-Jen Chung The economic production quantity with rework process in supply chain management , 2011, Comput. Math. Appl..

[21]  Deng-Maw Tsai,et al.  ECONOMIC PRODUCTION QUANTITY CONCERNING LEARNING AND THE REWORKING OF IMPERFECT ITEMS , 2012 .

[22]  Jinn-Tsair Teng,et al.  An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..

[23]  Monami Das Roy,et al.  An economic production lot size model for defective items with stochastic demand, backlogging and rework , 2014 .

[24]  K. S. Chaudhuri,et al.  Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..

[25]  Samiran Chattopadhyay,et al.  An inventory model of two-warehouse system with variable demand dependent on instantaneous displayed stock and marketing decisions via hybrid RCGA , 2011 .

[26]  Manoranjan Maiti,et al.  Deterministic inventory model for deteriorating items with finite rate of replenishment dependent on inventory level , 1998, Comput. Oper. Res..

[27]  M. Clerc,et al.  The swarm and the queen: towards a deterministic and adaptive particle swarm optimization , 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406).

[28]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..

[29]  Timothy L. Urban Deterministic inventory models incorporating marketing decisions , 1992 .

[30]  B. Mandal,et al.  An Inventory Model for Deteriorating Items and Stock-dependent Consumption Rate , 1989 .

[31]  Chung-Ho Chen,et al.  Optimum process mean and manufacturing quantity settings for serial production system under the quality loss and rectifying inspection plan , 2009, Comput. Ind. Eng..

[32]  Singa Wang Chiu,et al.  Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments , 2012, Appl. Math. Lett..

[33]  James Kennedy,et al.  Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.

[34]  R. Bhandari,et al.  The Economic Production Lot-Size Model with Variable Cost Function , 1999 .

[35]  S Shadrokh,et al.  ECONOMIC PRODUCTION QUANTITY IN REWORKABLE PRODUCTION SYSTEMS WITH INSPECTION ERRORS, SCRAPS AND BACKLOGGING , 2009 .

[36]  I Gede Agus Widyadana,et al.  A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule , 2013 .

[37]  R. N. Mukherjee,et al.  Optimal lot size model for deteriorating items with demand rate dependent on displayed stock level (DSL) and partial backordering , 2006, Eur. J. Oper. Res..

[38]  Asoke Kumar Bhunia,et al.  Genetic algorithm based multi-objective reliability optimization in interval environment , 2012, Comput. Ind. Eng..

[39]  G. William Walster,et al.  Global Optimization Using Interval Analysis: Revised and Expanded , 2007 .

[40]  Wenhong Luo,et al.  An integrated inventory system for perishable goods with backordering , 1998 .

[41]  Leopoldo Eduardo Cárdenas-Barrón On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..

[42]  Yu-Chung Tsao Two-phase pricing and inventory management for deteriorating and fashion goods under trade credit , 2010, Math. Methods Oper. Res..

[43]  P. Kotler Marketing Decision Making: A Model-building Approach , 1971 .

[44]  W. Ritha,et al.  Replenishment Policy for EMQ Model with Rework, Multiple Shipments, Switching and Packaging , 2013 .

[45]  Singa Wang Chiu,et al.  Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[46]  Ata Allah Taleizadeh,et al.  An imperfect multi-product production system with rework , 2013 .

[47]  K. Skouri,et al.  Order Level Inventory Models for Deteriorating Seasonable/Fashionable Products with Time Dependent Demand and Shortages , 2009 .

[48]  Moutaz Khouja,et al.  The economic production lot size model under volume flexibility , 1995, Comput. Oper. Res..

[49]  L. Cárdenas-Barrón,et al.  Multi products single machine EPQ model with immediate rework process , 2012 .

[50]  K. S. Chaudhuri,et al.  A production-inventory model for a deteriorating item with trended demand and shortages , 2004, Eur. J. Oper. Res..

[51]  Shib Sankar Sana,et al.  A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .

[52]  Jui‐Jung Liao An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit , 2008 .

[53]  Prakash L. Abad,et al.  Optimal lot size for a perishable good under conditions of finite production and partial backordering and lost sale , 2000 .

[54]  Kun-Jen Chung,et al.  The optimal retailer's ordering policies for deteriorating items with limited storage capacity under trade credit financing , 2007 .

[55]  S. Mitra Revenue management for remanufactured products , 2007 .

[56]  S. Kumaraswamy,et al.  EOQ Formula under Varying Marketing Policies and Conditions , 1981 .

[57]  S. Sana,et al.  A stochastic inventory model with product recovery , 2013 .

[58]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[59]  C. Krishnamoorthi,et al.  An EPQ Model with Imperfect Production Systems with Rework of Regular Production and Sales Return , 2012 .

[60]  S. K. Goyal,et al.  On optimal partially integrated production and marketing policy with variable demand under flexibility and reliability considerations via Genetic Algorithm , 2007, Appl. Math. Comput..

[61]  Hui-Ming Wee,et al.  An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders , 2013, Comput. Ind. Eng..

[62]  Hong-Dar Lin,et al.  A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..

[63]  K. S. Chaudhuri,et al.  Economic Order Quantity model with Weibull deterioration distribution, shortage and ramp-type demand , 2003, Int. J. Syst. Sci..

[64]  P. Abad Optimal pricing and lot-sizing under conditions of perishability and partial backordering , 1996 .