A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability
暂无分享,去创建一个
Ali Akbar Shaikh | Leopoldo Eduardo Cárdenas-Barrón | Asoke Kumar Bhunia | A. K. Bhunia | L. Cárdenas-Barrón | A. Shaikh | A. Bhunia
[1] Dilip Roy,et al. Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm , 2010, Appl. Math. Comput..
[2] M.-F. Wu,et al. Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues , 2011 .
[3] R. N. Mukherjee,et al. A marketing-oriented inventory model with three-component demand rate dependent on displayed stock level (DSL) , 2005, J. Oper. Res. Soc..
[4] Yuan-Shyi Peter Chiu,et al. Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..
[5] Singa Wang Chiu,et al. Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..
[6] Hui-Ming Wee,et al. Revisiting revenue management for remanufactured products , 2013, Int. J. Syst. Sci..
[7] Leopoldo Eduardo Cárdenas-Barrón,et al. Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products , 2015, Int. J. Syst. Sci..
[8] Ali Akbar Shaikh,et al. A deterministic model for deteriorating items with displayed inventory level dependent demand rate incorporating marketing decisions with transportation cost , 2011 .
[9] DaeSoo Kim,et al. OPTIMAL AND HEURISTIC DECISION STRATEGIES FOR INTEGRATED PRODUCTION AND MARKETING PLANNING , 1993 .
[10] S. Sana,et al. ON A VOLUME FLEXIBLE PRODUCTION POLICY FOR A DETERIORATING ITEM WITH TIME-DEPENDENT DEMAND AND SHORTAGES , 2004 .
[11] Hui-Ming Wee,et al. An economic production quantity model with non-synchronized screening and rework , 2014, Appl. Math. Comput..
[12] Leopoldo Eduardo Cárdenas-Barrón,et al. An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .
[13] K. S. Chaudhuri,et al. Three-layer supply chain - A production-inventory model for reworkable items , 2012, Appl. Math. Comput..
[14] Angappa Gunasekaran,et al. An integrated production-inventory-marketing model for deteriorating items , 1995 .
[15] Singa Wang Chiu,et al. Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..
[16] K. S. Chaudhuri,et al. An optimal shipment strategy for imperfect items in a stock-out situation , 2011, Math. Comput. Model..
[17] S. Ladany,et al. The Interaction of Economic Ordering Quantities and Marketing Policies , 1974 .
[18] Russell C. Eberhart,et al. A new optimizer using particle swarm theory , 1995, MHS'95. Proceedings of the Sixth International Symposium on Micro Machine and Human Science.
[19] Maurice Clerc,et al. The particle swarm - explosion, stability, and convergence in a multidimensional complex space , 2002, IEEE Trans. Evol. Comput..
[20] Kun-Jen Chung. The economic production quantity with rework process in supply chain management , 2011, Comput. Math. Appl..
[21] Deng-Maw Tsai,et al. ECONOMIC PRODUCTION QUANTITY CONCERNING LEARNING AND THE REWORKING OF IMPERFECT ITEMS , 2012 .
[22] Jinn-Tsair Teng,et al. An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..
[23] Monami Das Roy,et al. An economic production lot size model for defective items with stochastic demand, backlogging and rework , 2014 .
[24] K. S. Chaudhuri,et al. Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..
[25] Samiran Chattopadhyay,et al. An inventory model of two-warehouse system with variable demand dependent on instantaneous displayed stock and marketing decisions via hybrid RCGA , 2011 .
[26] Manoranjan Maiti,et al. Deterministic inventory model for deteriorating items with finite rate of replenishment dependent on inventory level , 1998, Comput. Oper. Res..
[27] M. Clerc,et al. The swarm and the queen: towards a deterministic and adaptive particle swarm optimization , 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406).
[28] Leopoldo Eduardo Cárdenas-Barrón,et al. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..
[29] Timothy L. Urban. Deterministic inventory models incorporating marketing decisions , 1992 .
[30] B. Mandal,et al. An Inventory Model for Deteriorating Items and Stock-dependent Consumption Rate , 1989 .
[31] Chung-Ho Chen,et al. Optimum process mean and manufacturing quantity settings for serial production system under the quality loss and rectifying inspection plan , 2009, Comput. Ind. Eng..
[32] Singa Wang Chiu,et al. Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments , 2012, Appl. Math. Lett..
[33] James Kennedy,et al. Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.
[34] R. Bhandari,et al. The Economic Production Lot-Size Model with Variable Cost Function , 1999 .
[35] S Shadrokh,et al. ECONOMIC PRODUCTION QUANTITY IN REWORKABLE PRODUCTION SYSTEMS WITH INSPECTION ERRORS, SCRAPS AND BACKLOGGING , 2009 .
[36] I Gede Agus Widyadana,et al. A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule , 2013 .
[37] R. N. Mukherjee,et al. Optimal lot size model for deteriorating items with demand rate dependent on displayed stock level (DSL) and partial backordering , 2006, Eur. J. Oper. Res..
[38] Asoke Kumar Bhunia,et al. Genetic algorithm based multi-objective reliability optimization in interval environment , 2012, Comput. Ind. Eng..
[39] G. William Walster,et al. Global Optimization Using Interval Analysis: Revised and Expanded , 2007 .
[40] Wenhong Luo,et al. An integrated inventory system for perishable goods with backordering , 1998 .
[41] Leopoldo Eduardo Cárdenas-Barrón. On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..
[42] Yu-Chung Tsao. Two-phase pricing and inventory management for deteriorating and fashion goods under trade credit , 2010, Math. Methods Oper. Res..
[43] P. Kotler. Marketing Decision Making: A Model-building Approach , 1971 .
[44] W. Ritha,et al. Replenishment Policy for EMQ Model with Rework, Multiple Shipments, Switching and Packaging , 2013 .
[45] Singa Wang Chiu,et al. Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[46] Ata Allah Taleizadeh,et al. An imperfect multi-product production system with rework , 2013 .
[47] K. Skouri,et al. Order Level Inventory Models for Deteriorating Seasonable/Fashionable Products with Time Dependent Demand and Shortages , 2009 .
[48] Moutaz Khouja,et al. The economic production lot size model under volume flexibility , 1995, Comput. Oper. Res..
[49] L. Cárdenas-Barrón,et al. Multi products single machine EPQ model with immediate rework process , 2012 .
[50] K. S. Chaudhuri,et al. A production-inventory model for a deteriorating item with trended demand and shortages , 2004, Eur. J. Oper. Res..
[51] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[52] Jui‐Jung Liao. An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit , 2008 .
[53] Prakash L. Abad,et al. Optimal lot size for a perishable good under conditions of finite production and partial backordering and lost sale , 2000 .
[54] Kun-Jen Chung,et al. The optimal retailer's ordering policies for deteriorating items with limited storage capacity under trade credit financing , 2007 .
[55] S. Mitra. Revenue management for remanufactured products , 2007 .
[56] S. Kumaraswamy,et al. EOQ Formula under Varying Marketing Policies and Conditions , 1981 .
[57] S. Sana,et al. A stochastic inventory model with product recovery , 2013 .
[58] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[59] C. Krishnamoorthi,et al. An EPQ Model with Imperfect Production Systems with Rework of Regular Production and Sales Return , 2012 .
[60] S. K. Goyal,et al. On optimal partially integrated production and marketing policy with variable demand under flexibility and reliability considerations via Genetic Algorithm , 2007, Appl. Math. Comput..
[61] Hui-Ming Wee,et al. An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders , 2013, Comput. Ind. Eng..
[62] Hong-Dar Lin,et al. A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..
[63] K. S. Chaudhuri,et al. Economic Order Quantity model with Weibull deterioration distribution, shortage and ramp-type demand , 2003, Int. J. Syst. Sci..
[64] P. Abad. Optimal pricing and lot-sizing under conditions of perishability and partial backordering , 1996 .