Managing warehousing in an agile supply chain environment: an F-AIS algorithm based approach
暂无分享,去创建一个
Felix T.S. Chan | Anoop Verma | Vikas Kumar | Nishikant Mishra | F. Chan | N. Mishra | Prof Vikas Kumar | Anoop Verma
[1] Richard L. Daniels,et al. A model for warehouse order picking , 1998, Eur. J. Oper. Res..
[2] Manoj Kumar Tiwari,et al. Stochastic make-to-stock inventory deployment problem: an endosymbiotic psychoclonal algorithm based approach , 2006 .
[3] Remko I. van Hoek,et al. RECONFIGURING THE SUPPLY CHAIN TO IMPLEMENT POSTPONED MANUFACTURING , 1998 .
[4] Byung-In Kim,et al. A Hybrid Scheduling and Control System Architecture for Warehouse Management , 2022 .
[5] Marshall L. Fisher,et al. Supply Chain Inventory Management and the Value of Shared Information , 2000 .
[6] H. Abbass,et al. aiNet : An Artificial Immune Network for Data Analysis , 2022 .
[7] Mitsuo Gen,et al. Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling , 2003, Appl. Soft Comput..
[8] Paul T. Kidd,et al. Agile Manufacturing: Forging New Frontiers , 1994 .
[9] A. Gunasekaran,et al. Agile manufacturing: The drivers, concepts and attributes , 1999 .
[10] Jean-Paul Watson,et al. The impact of approximate evaluation on the performance of search algorithms for warehouse scheduling , 1999 .
[11] Manoj Kumar Tiwari,et al. The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model , 2009 .
[12] Nada R. Sanders,et al. Quantifying costs of forecast errors: A case study of the warehouse environment☆ , 2009 .
[13] Jun Ota,et al. Metaheuristic scheduling of multiple picking agents for warehouse management , 2008, Ind. Robot.
[14] Joseph G. Macro,et al. Warehousing and inventory management: a simulation tool to determine warehouse efficiencies and stor , 2002 .
[15] Mark S. Daskin,et al. A warehouse location-routing problem , 1985 .
[16] Sun Hur,et al. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain , 2002 .
[17] Peter McCullen,et al. The Impact of Agile Manufacturing on Supply Chain Dynamics , 1999 .
[18] M. B. M. de Koster,et al. Efficient orderbatching methods in warehouses , 1999 .
[19] Noud Gademann,et al. Optimal routing in an automated storage/retrieval system with dedicated storage , 1995 .
[20] H. D. Ratliff,et al. Order-Picking in a Rectangular Warehouse: A Solvable Case of the Traveling Salesman Problem , 1983, Oper. Res..
[21] Manoj Kumar Tiwari,et al. Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach , 2006, Eur. J. Oper. Res..
[22] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .
[23] H D Ratliff,et al. Order Picking In An Aisle , 1988 .
[24] M. Christopher,et al. An Integrated Model for the Design of Agile Supply Chains. , 2001 .
[25] Chiung Moon,et al. Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .
[26] Felix T.S. Chan,et al. Hybrid TSSA algorithm-based approach to solve warehouse-scheduling problems , 2009 .
[27] T. L. Ray,et al. Warehouse Location Under Continuous Economies of Scale , 1966 .
[28] Jun Ota,et al. Route generation for warehouse management using fast heuristics , 2004, 2004 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS) (IEEE Cat. No.04CH37566).
[29] A.J.R.M. Gademann,et al. Optimal routing in an automated storage/retrieval system with dedicated storage , 1999 .
[30] Denis Royston Towill,et al. Lean, agile or leagile? Matching your supply chain to the marketplace , 2000 .
[31] Günter Rote,et al. Vehicle routing in an automated warehouse: Analysis and optimization , 1995, Ann. Oper. Res..
[32] F.T.S. Chan,et al. Optimizing the Performance of an Integrated Process Planning and Scheduling Problem: An AIS-FLC based Approach , 2006, 2006 IEEE Conference on Cybernetics and Intelligent Systems.
[33] Manoj Kumar Tiwari,et al. Performance evaluation of flexible manufacturing systems under uncertain and dynamic situations , 2008 .
[34] Angappa Gunasekaran,et al. Agile manufacturing: A framework for research and development , 1999 .
[35] Willem H.M. Zijm,et al. Models for warehouse management: Classification and examples , 1999 .
[36] Yavuz A. Bozer,et al. Design and Performance Models for End-of-Aisle Order Picking Systems , 1990 .
[37] R. Nagel,et al. Agile competitors and virtual organisations , 1995 .
[38] Gerd Finke,et al. MODELING AND SOLVING THE FLEXIBLE FORGING MODULE SCHEDULING PROBLEM , 1987 .