Assessing Organizational Capabilities: Reviewing and Guiding the Development of Maturity Grids

Managing and improving organizational capabilities is a significant and complex issue for many companies. To support management and enable improvement, performance assessments are commonly used. One way of assessing organizational capabilities is by means of maturity grids. While maturity grids may share a common structure, their content differs and very often they are developed anew. This paper presents both a reference point and guidance for developing maturity grids. This is achieved by reviewing 24 existing maturity grids and by suggesting a roadmap for their development. The review places particular emphasis on embedded assumptions about organizational change in the formulation of the maturity ratings. The suggested roadmap encompasses four phases: planning, development, evaluation, and maintenance. Each phase discusses a number of decision points for development, such as the selection of process areas, maturity levels, and the delivery mechanism. An example demonstrating the roadmap's utility in industrial practice is provided. The roadmap can also be used to evaluate existing approaches. In concluding the paper, implications for management practice and research are presented.

[1]  Stefan Thalmann,et al.  Understanding Maturity Models Results of a Structured Content Analysis , 2009 .

[2]  Tobias Mettler,et al.  A Design Science Research Perspective on Maturity Models in Information Systems , 2009 .

[3]  Mark C. Paulk Surviving the Quagmire of Process Models, Integrated Models, and Standards , 2004 .

[4]  Louis L. Bucciarelli,et al.  Reflective practice in engineering design , 1984 .

[5]  James W. Moore An Integrated Collection of Software Engineering Standards , 1999, IEEE Softw..

[6]  Dianne Parker,et al.  The Manchester Patient Safety Framework: sharing the learning , 2008 .

[7]  Mark C. Paulk,et al.  The Capability Maturity Model: Guidelines for Improving the Software Process , 1994 .

[8]  Mikko T. Siponen,et al.  Towards maturity of information security maturity criteria: six lessons learned from software maturity criteria , 2002, Inf. Manag. Comput. Secur..

[9]  Uday R. Kulkarni,et al.  Organizational Self Assessment of Knowledge Management Maturity , 2003, AMCIS.

[10]  Ronald A. Radice,et al.  A Programming Process Architecture , 1985, IBM Syst. J..

[11]  Terence J. Cooke-Davies,et al.  The maturity of project management in different industries: An investigation into variations between project management models , 2003 .

[12]  Patrick T. W. Hudson,et al.  A framework for understanding the development of organisational safety culture , 2006 .

[13]  Khaled El Emam,et al.  An empirical review of software process assessments , 2000, Adv. Comput..

[14]  Edwin R. Otto Innovation: The Attacker's Advantage , 1986 .

[15]  Mary Beth Chrissis,et al.  CMMI: Guidelines for Process Integration and Product Improvement , 2003 .

[16]  Anja Maier A grid-based assessment method of communication in engineering design , 2008 .

[17]  Philip B. Crosby,et al.  Quality Is Free: The Art of Making Quality Certain , 1979 .

[18]  Mike Gregory,et al.  The use of maturity models/grids as a tool in assessing product development capability , 2002, IEEE International Engineering Management Conference.

[19]  Y. Kwak,et al.  Calculating Project Management's Return on Investment , 2000 .

[20]  D. Teece,et al.  DYNAMIC CAPABILITIES AND STRATEGIC MANAGEMENT , 1997 .

[21]  Udo Lindemann,et al.  Reflecting communication: a key factor for successful collaboration between embodiment design and simulation , 2009 .

[22]  D Parker,et al.  Safety culture assessment in community pharmacy: development, face validity, and feasibility of the Manchester Patient Safety Assessment Framework , 2005, Quality and Safety in Health Care.

[23]  Michael Rosemann,et al.  Understanding the Main Phases of Developing a Maturity Assessment Model , 2005 .

[24]  Harold Kerzner,et al.  Using the Project Management Maturity Model: Strategic Planning for Project Management , 2005 .

[25]  Shari Lawrence Pfleeger,et al.  Evaluating software engineering standards , 1994, Computer.

[26]  Erling S. Andersen,et al.  Project maturity in organisations , 2003 .

[27]  Elizabeth H Bradley,et al.  Improving health service delivery organisational performance in health systems: a taxonomy of strategy areas and conceptual framework for strategy selection. , 2012, International health.

[28]  Y. Kwak,et al.  Assessing Project Management Maturity , 2000 .

[29]  Klaus Krippendorff Communication and the Genesis of Structure , 1971 .

[30]  John C. Mankins,et al.  Technology Readiness Levels-A White Paper , 1995 .

[31]  M. Bloor Techniques of Validation in Qualitative Research: a Critical Commentary , 1997 .

[32]  P. John Clarkson,et al.  Identifying requirements for communication support: A maturity grid-inspired approach , 2006, Expert Syst. Appl..

[33]  James Moultrie,et al.  Development of a Design Audit Tool to Assess Product Design Capability , 2004 .

[34]  Richard L. Nolan,et al.  Managing the computer resource , 1973, Commun. ACM.

[35]  Davide Aloini,et al.  TOWARDS A RISK-ORIENTED ERP CAPABILITY MATURITY MODEL (ERP-CMM) , 2011, MCIS 2011.

[36]  Mark C. Paulk,et al.  Capability Maturity Model Sm for Software, Version 1.1 Capability Maturity Model Sm for Software, Version 1.1 for the Commander (signature on File) Ii S Capability Maturity Model List of Figures List of Figures Iv S Capability Maturity Model , 1993 .

[37]  Robert T. Craig Communication Theory as a Field , 1999 .

[38]  Jörg Becker,et al.  Developing Maturity Models for IT Management , 2009, Bus. Inf. Syst. Eng..

[39]  John C. Anderson,et al.  Maturity and its impact on new product development project performance , 2001 .

[40]  Massimo Marraffa,et al.  Organizational learning II: Theory, method and practice , 1998 .

[41]  James A. Anderson,et al.  Communication Theory: Epistemological Foundations , 1996 .

[42]  J Crawford,et al.  Project Management Maturity Model , 2001 .

[43]  P. John Clarkson,et al.  Exploration of Correlations between Factors Influencing Communication in Complex Product Development , 2008, Concurr. Eng. Res. Appl..

[44]  K. Eisenhardt,et al.  Resource-based View of Strategic Alliance Formation: Strategic and Social Effects in Entrepreneurial Firms , 1996 .

[45]  Stephen W. Littlejohn Theories of Human Communication , 1978 .

[46]  Robert V. Bloedon,et al.  Making University/Industry Collaborative Research Succeed , 1994 .

[47]  D. Crowhurst,et al.  MaSC: managing sustainable companies , 2004 .

[48]  J E Strutt,et al.  Capability maturity models for offshore organisational management. , 2006, Environment international.

[49]  M. Mullaly Longitudinal Analysis of Project Management Maturity , 2006 .

[50]  R. V. Wyk Innovation: The attacker's advantage : Richard N. Foster 316 pages, £14.95 (London, Macmillan, 1986) , 1987 .

[51]  Marlies van Steenbergen,et al.  The Design of Focus Area Maturity Models , 2010, DESRIST.

[52]  John C. Mankins,et al.  Technology readiness assessments: A retrospective , 2009 .

[53]  Mark C. Paulk,et al.  A Taxonomy for Improvement Frameworks , 2008 .

[54]  L. G. Pee,et al.  A Model of Organisational Knowledge Management Maturity Based on People, Process, and Technology , 2009, J. Inf. Knowl. Manag..

[55]  Mike Gregory,et al.  Managing product development collaborations—a process maturity approach , 2003 .

[56]  L. Greiner Evolution and Revolution as Organizations Grow , 1997 .

[57]  D. Probert,et al.  Development of a Design Audit Tool for SMEs , 2007 .

[58]  J. Kent Crawford Project Management Maturity Model: Providing a Proven Path to Project Management Excellence , 2001 .

[59]  Brian J. Sauser,et al.  System Development Planning via System Maturity Optimization , 2009, IEEE Transactions on Engineering Management.

[60]  Michael E. McGrath,et al.  Chapter 2 – PACE: An Integrated Process for Product And Cycle-time Excellence , 1996 .

[61]  B. Kitchenham,et al.  Case Studies for Method and Tool Evaluation , 1995, IEEE Softw..

[62]  Gregory J. Skulmoski Project maturity and competence interface , 2001 .

[63]  John Bessant,et al.  Design in Business , 2002 .

[64]  M. Hammer The process audit. , 2007, Harvard business review.

[65]  Martin Bichler,et al.  Design science in information systems research , 2006, Wirtschaftsinf..

[66]  N. Cross Designerly Ways of Knowing: Design Discipline Versus Design Science , 2001, Design Issues.

[67]  Kevin P. Grant,et al.  Project Management Maturity: An Industry Benchmark , 2003 .

[68]  Ronald A. Radice,et al.  A Programming Process Study , 1985, IBM Syst. J..

[69]  Clayton M. Christensen EXPLORING THE LIMITS OF THE TECHNOLOGY S‐CURVE. PART I: COMPONENT TECHNOLOGIES , 1992 .

[70]  Kevin P. Grant,et al.  Project management maturity: an assessment of project management capabilities among and between selected industries , 2006, IEEE Transactions on Engineering Management.

[71]  Reidar Conradi,et al.  A Taxonomy to Compare SPI Frameworks , 2001, EWSPT.

[72]  B. Wernerfelt,et al.  A Resource-Based View of the Firm , 1984 .

[73]  P. Coughlan,et al.  Development of a technical innovation audit , 1996 .

[74]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[75]  Jim Wilson Communications artifacts: The design of objects and the object of design , 2002 .

[76]  D. Leonard-Barton CORE CAPABILITIES AND CORE RIGIDITIES: A PARADOX IN MANAGING NEW PRODUCT DEVELOPMENT , 1992 .

[77]  J. Barney Firm Resources and Sustained Competitive Advantage , 1991 .

[78]  Michael Rohloff,et al.  Case Study and Maturity Model for Business Process Management Implementation , 2009, BPM.

[79]  Dave Ulrich,et al.  Capitalizing on capabilities. , 2004, Harvard business review.

[80]  Nigel Cross,et al.  Engineering Design Methods: Strategies for Product Design , 1994 .

[81]  Paul Chinowsky,et al.  Learning Organizations in Construction , 2007 .

[82]  J. R. Moore,et al.  The theory of the growth of the firm twenty-five years after , 1960 .

[83]  Robert Szakonyi,et al.  Measuring R&D Effectiveness—I , 1994 .

[84]  Donald A. Schön,et al.  Organizational Learning: A Theory Of Action Perspective , 1978 .

[85]  Robert Phaal,et al.  Technology management tools: concept, development and application , 2006 .

[86]  David Ulrich,et al.  Why the Bottom Line Isn't!: How to Build Value Through People and Organization , 2003 .

[87]  Kenneth B. Kahn,et al.  PERSPECTIVE: Establishing an NPD Best Practices Framework , 2006 .

[88]  Louis L. Bucciarelli,et al.  Designing Engineers , 1994 .

[89]  K. Miller Communication Theories: Perspectives, Processes, and Contexts , 2001 .

[90]  William E. Hefley,et al.  The People Capability Maturity Model : guidelines for improving the workforce , 2002 .