An estimate and simulation approach to determining the Automated Guided Vehicle fleet size in FMS
暂无分享,去创建一个
Liu Meihong | Liu Xianxi | Tao Yifei | Chen Junruo | Fu Yali
[1] Felix T.S. Chan,et al. Evaluations of operational control rules in scheduling a flexible manufacturing system , 1999 .
[2] Mingyuan Chen,et al. A simulation study of flexible manufacturing systems , 1995 .
[3] René M. B. M. de Koster,et al. A review of design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..
[4] Hao-Cheng Liu,et al. A simulation study on the performance of pickup-dispatching rules for multiple-load AGVs , 2006, Comput. Ind. Eng..
[5] Pius J. Egbelu,et al. Integrated manufacturing planning for an AGV-based FMS , 1999 .
[6] Ronald Mantel,et al. Design and operational control of an AGV system , 1995 .
[7] Ihsan Sabuncuoglu,et al. A STUDY OF SCHEDULING RULES OF FLEXIBLE MANUFACTURING SYSTEMS : A SIMULATION APPROACH , 1998 .
[8] P. J. Egbelu,et al. The use of non-simulation approaches in estimating vehicle requirements in an automated guided based transport system , 1987 .