Mapping Roles in an Altered Landscape – The Impact of BIM on Designer-constructor Relationships

The increasing uptake of Building Information Modelling (BIM) is contributing to pressures and changes in the architecture, engineering and construction (AEC) industry, which require adjustments and adaptation in the roles of almost all participants. One of the most commonly cited changes is the increase in collaboration and a shift to more integrated project teams. Thus the traditional role descriptions for the various professionals involved in a construction project become less distinctly separate, or new roles emerge. Definitions of skill sets and competencies that have been charted over many years are now being unpicked and reshaped as the needs of industry change. Different organisations, projects and partnerships take different approaches to the adoption of BIM, and consequently there are several different strains of work under this broad umbrella. This has resulted in a wide variety of interpretations of what constitutes successful or appropriate BIM use, and it is valuable to distinguish between the varied concerns. The impact of BIM and its associated process changes vary considerably depending on how it is interpreted and whether a global or an incremental approach is taken within the project or organisation. There is also significant potential for unexpected effects on the nature of the product (the design and construction of the built environment) or on the organisations and industry structure, beyond intended productivity improvements and quality enhancements. Based on a review of existing literature, this paper provides a typology for identifying current BIM adoption trends in industry, with an analysis of available empirical data to help identify the effects of BIM on roles within organisational and project contexts. The review centres most significantly on the contours of the designerconstructor relationship. It explores the impacts of the varying degrees of collaboration identified and the extent to which a BIM-mediated process reshapes skill sets and competencies.

[1]  Steve Rowlinson,et al.  Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study , 2010 .

[2]  Tetsuo Tomiyama,et al.  Advanced Engineering Informatics , 2007, Adv. Eng. Informatics.

[3]  Kevin L. Burr,et al.  The Role of the Architect: Changes of the Past, Practices of the Present, and Indications of the Future , 2010 .

[4]  Rizal Sebastian Integrated Design and Engineering using Building Information Modelling: A Pilot Project of Small-Scale Housing Development in The Netherlands , 2010 .

[5]  Danijel Rebolj,et al.  Integrating resource production and construction using BIM , 2010 .

[6]  Thomas Froese,et al.  PRACTICE NOTE Building information modelling demystified: does it make business sense to adopt BIM? , 2009, ICIT 2008.

[7]  Timo Hartmann,et al.  Implementing information systems with project teams using ethnographic-action research , 2009, Adv. Eng. Informatics.

[8]  R. Suddaby,et al.  Professionals and field-level change: Institutional work and the professional project , 2011 .

[9]  Mike Kagioglou,et al.  THE LIMITATIONS OF BIM IN THE ARCHITECTURAL PROCESS , 2010 .

[10]  Henrik Linderoth,et al.  Understanding adoption and use of BIM as the creation of actor networks , 2010 .

[11]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[12]  Burcin Becerik-Gerber,et al.  Transitioning to Integrated Project Delivery: Potential barriers and lessons learned , 2011 .

[13]  Ralph Arnote,et al.  Hong Kong (China) , 1996, OECD/G20 Base Erosion and Profit Shifting Project.

[14]  Burcu Akinci,et al.  Analysis of modeling effort and impact of different levels of detail in building information models , 2011 .

[15]  Adrian John Wilkinson,et al.  ‘Remember I’m the bloody architect!’ , 2005 .

[16]  Christoph Merschbrock Unorchestrated symphony: The case of inter - organizational collaboration in digital construction design , 2012, J. Inf. Technol. Constr..

[17]  Mike Kagioglou,et al.  Technology adoption in the BIM implementation for lean architectural practice , 2011 .

[18]  Carrie Sturts Dossick,et al.  A CASE STUDY OF THE FAILURE OF DIGITAL COMMUNICATION TO CROSS KNOWLEDGE BOUNDARIES IN VIRTUAL CONSTRUCTION , 2010 .

[19]  Hans Voordijk,et al.  The use of interorganisational ICT in United States construction projects , 2010 .

[20]  Jamie Urquhart It's not just about the technology , 2007 .

[21]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[22]  Jennifer Whyte,et al.  Managing digital coordination of design: emerging hybrid practices in an institutionalized project setting , 2011 .

[23]  Rizal Sebastian,et al.  Changing roles of the clients, architects and contractors through BIM , 2011 .

[24]  Stuart Tennant,et al.  Construction Site Management Team Working: A Serendipitous Event , 2011 .

[25]  Kasun Hewage,et al.  Building Information Modeling (BIM) partnering framework for public construction projects , 2013 .

[26]  Chris Harty,et al.  Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project , 2013 .

[27]  Raja R. A. Issa,et al.  BIM's Impact on the Success Measures of Construction Projects , 2009 .