The FMIT Accelerator Vacuum System
暂无分享,去创建一个
The Fusion Materials Irradiation Test (FMIT) Facility accelerator is being designed to continuously accelerate 100-mA deuterons to 35 MeV. High vacuum pumping of the accelerator structure and beam lines will be done by ion pumps and titanium sublimation pumps. The design of the roughing system includes a Roots blower/mechanical pump package. For economy the size of the system has been designed to operate at 10-6 torr, where beam particle scattering on residual gases is negligible. For minimum maintenance in this "neutron factory," the FMIT vacuum system is designed from the point of view of simplicity and reliability.
[1] D. Clark,et al. Design of the Accelerating Structures for FMIT , 1979, IEEE Transactions on Nuclear Science.
[2] G. Rodenz,et al. Radio Frequency Quadrupole Accelerating Structure Research at los Alamos , 1979, IEEE Transactions on Nuclear Science.