A rework reduction model for construction projects
暂无分享,去创建一个
[1] Geoff Rounce. Quality, waste and cost considerations in architectural building design management , 1998 .
[2] James T. O'Connor. IMPACTS OF CONSTRUCTABILITY IMPROVEMENT. , 1985 .
[3] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[4] Albert Pc Chan. Evaluation of Novation Contract , 1994 .
[5] Peter E.D. Love,et al. The propagation of rework benchmark metrics for construction , 1999 .
[6] J. O. Rawlings,et al. Applied Regression Analysis , 1998 .
[7] Chimay J. Anumba,et al. CONCURRENT ENGINEERING : Research and Applications Client Requirements Processing for Concurrent Life-Cycle Design and Construction , 2006 .
[8] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.
[9] J. O. Rawlings,et al. Applied Regression Analysis: A Research Tool , 1988 .
[10] Fran Ackermann,et al. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..
[11] Peter E.D. Love,et al. Optimal allocation of construction planning resources , 1999 .
[12] C. Tomkins,et al. Quality failure costs in civil engineering projects , 2000 .
[13] Peter E.D. Love,et al. BENCHMARKING, BENCHACTION, AND BENCHLEARNING: REWORK MITIGATION IN PROJECTS , 2003 .
[14] null null,et al. Constructability and Constructability Programs: White Paper , 1991 .
[15] Jim Smith,et al. Strategic needs analysis: its role in brief development , 2000 .
[16] Albert P. C. Chan. Quality Assurance in the Construction Industry , 1996 .
[17] Per-Erik Josephson,et al. Evaluation of methods for studying environmental errors in building and civil engineering projects , 1999 .
[18] Peter E.D. Love,et al. Auditing the indirect consequences of rework in construction: a case based approach , 2002 .
[19] Kerry London,et al. Construction Management: New Directions , 2002 .
[20] J. H. Rogerson,et al. A quantitative study of post contract award design changes in construction , 1999 .
[21] N. Draper,et al. Applied Regression Analysis , 1966 .
[22] Peter E.D. Love,et al. Determining the causal structure of rework influences in construction , 1999 .
[23] Andrew N. Baldwin,et al. Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process , 2000 .
[24] Fran Ackermann,et al. Modeling for Litigation: Mixing Qualitative and Quantitative Approaches , 1997 .
[25] Anthony C. Sidwell,et al. A critical study of project team organisational forms within the building process , 1982 .
[26] Peter E.D. Love,et al. Concurrent engineering : a strategy for procuring construction projects , 1998 .
[27] Peter E.D. Love,et al. Partnering research in construction , 2000 .
[28] Peter E. D. Love,et al. Visualization of building interior design to reduce rework , 1998, Proceedings. 1998 IEEE Conference on Information Visualization. An International Conference on Computer Visualization and Graphics (Cat. No.98TB100246).
[29] L. Cronbach. Coefficient alpha and the internal structure of tests , 1951 .
[30] Pamela L. Alreck,et al. The Survey Research Handbook , 1984 .
[31] John Gardiner. Management of Design Documentation Where Do We Go from Here , 1994 .
[32] P.-E Josephson,et al. The causes and costs of defects in construction. A study of seven building projects , 1999 .
[33] B. Tabachnick,et al. Using Multivariate Statistics , 1983 .
[34] P. Love,et al. Rework: a symptom of a dysfunctional supply-chain , 1999 .
[35] J. L. Ashford,et al. The Management of Quality in Construction , 2002 .
[36] John Rudolph,et al. Quality management and rework in the construction industry , 1992 .
[37] Peter E.D. Love,et al. Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .