A rework reduction model for construction projects

Rework is an endemic problem in building construction projects and is an area of research that has received limited attention. Recent research has shown that rework is the primary cause of time and schedule overruns in projects and that rework levels do not significantly differ between current procurement methods despite calls from government for the use of more integrated procurement approaches such as design-and-construct to improve project performance. To reduce the incidence of rework throughout the construction supply chain, data from 161 completed projects were gathered using a questionnaire survey. Stepwise multiple regression was used to determine the significant variables that contributed to rework in projects. In conjunction with previously reported research, these variables were used to develop an alternative procurement model for reducing rework in projects. It is suggested that the proposed model could be used to stimulate interorganizational relations and promote teambuilding during the formative stages of a project, which is essential for reducing design-related reworking.

[1]  Geoff Rounce Quality, waste and cost considerations in architectural building design management , 1998 .

[2]  James T. O'Connor IMPACTS OF CONSTRUCTABILITY IMPROVEMENT. , 1985 .

[3]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[4]  Albert Pc Chan Evaluation of Novation Contract , 1994 .

[5]  Peter E.D. Love,et al.  The propagation of rework benchmark metrics for construction , 1999 .

[6]  J. O. Rawlings,et al.  Applied Regression Analysis , 1998 .

[7]  Chimay J. Anumba,et al.  CONCURRENT ENGINEERING : Research and Applications Client Requirements Processing for Concurrent Life-Cycle Design and Construction , 2006 .

[8]  D. V. Steward,et al.  The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.

[9]  J. O. Rawlings,et al.  Applied Regression Analysis: A Research Tool , 1988 .

[10]  Fran Ackermann,et al.  The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..

[11]  Peter E.D. Love,et al.  Optimal allocation of construction planning resources , 1999 .

[12]  C. Tomkins,et al.  Quality failure costs in civil engineering projects , 2000 .

[13]  Peter E.D. Love,et al.  BENCHMARKING, BENCHACTION, AND BENCHLEARNING: REWORK MITIGATION IN PROJECTS , 2003 .

[14]  null null,et al.  Constructability and Constructability Programs: White Paper , 1991 .

[15]  Jim Smith,et al.  Strategic needs analysis: its role in brief development , 2000 .

[16]  Albert P. C. Chan Quality Assurance in the Construction Industry , 1996 .

[17]  Per-Erik Josephson,et al.  Evaluation of methods for studying environmental errors in building and civil engineering projects , 1999 .

[18]  Peter E.D. Love,et al.  Auditing the indirect consequences of rework in construction: a case based approach , 2002 .

[19]  Kerry London,et al.  Construction Management: New Directions , 2002 .

[20]  J. H. Rogerson,et al.  A quantitative study of post contract award design changes in construction , 1999 .

[21]  N. Draper,et al.  Applied Regression Analysis , 1966 .

[22]  Peter E.D. Love,et al.  Determining the causal structure of rework influences in construction , 1999 .

[23]  Andrew N. Baldwin,et al.  Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process , 2000 .

[24]  Fran Ackermann,et al.  Modeling for Litigation: Mixing Qualitative and Quantitative Approaches , 1997 .

[25]  Anthony C. Sidwell,et al.  A critical study of project team organisational forms within the building process , 1982 .

[26]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[27]  Peter E.D. Love,et al.  Partnering research in construction , 2000 .

[28]  Peter E. D. Love,et al.  Visualization of building interior design to reduce rework , 1998, Proceedings. 1998 IEEE Conference on Information Visualization. An International Conference on Computer Visualization and Graphics (Cat. No.98TB100246).

[29]  L. Cronbach Coefficient alpha and the internal structure of tests , 1951 .

[30]  Pamela L. Alreck,et al.  The Survey Research Handbook , 1984 .

[31]  John Gardiner Management of Design Documentation Where Do We Go from Here , 1994 .

[32]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[33]  B. Tabachnick,et al.  Using Multivariate Statistics , 1983 .

[34]  P. Love,et al.  Rework: a symptom of a dysfunctional supply-chain , 1999 .

[35]  J. L. Ashford,et al.  The Management of Quality in Construction , 2002 .

[36]  John Rudolph,et al.  Quality management and rework in the construction industry , 1992 .

[37]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .