A Framework for the Selection or Design of Production Planning and Control Systems: A Case of Application
暂无分享,去创建一个
Marcos Buestan | María M. López | Maria Lopez | Hendrik Van Landeghem | H. Landeghem | Marcos Buestan
[1] Peter O'Grady,et al. Kanban controlled pull systems: an analytic approach , 1989 .
[2] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[3] Sameh M. Saad,et al. Development and implementation of a generic order release scheme for modelling MRP-controlled finite-capacitated manufacturing environments , 2004, Int. J. Comput. Integr. Manuf..
[4] Stephen N. Chapman,et al. Planning and Control in Multi‐Cell Manufacturing , 1995 .
[5] Maria Di Mascolo,et al. A multi-class approximation technique for the analysis of kanban-like control systems , 2001 .
[6] Mark Stevenson. Refining a Workload Control (WLC) concept: a case study , 2006 .
[7] Martin Land,et al. Improving a practical DBR buffering approach using Workload Control , 2003 .
[8] Georg N. Krieg,et al. Analysis of Multi-Product Kanban Systems with State-Dependent Setups and Lost Sales , 2004, Ann. Oper. Res..
[9] Wayne J. Davis,et al. Configuring a Kanban system using a discrete optimization of multiple stochastic responses , 1987 .
[10] I. P. Tatsiopoulos,et al. An expert system for the selection of production planning and control software packages , 1999 .
[11] G. Rabadi,et al. Supply Chain Inventory Control: A Comparison Among JIT, MRP, and MRP With Information Sharing Using Simulation , 2006 .
[12] William L. Berry,et al. Linking Systems to Strategy , 1992 .
[13] Barbara Pfeffer,et al. Manufacturing Planning And Control Systems , 2016 .
[14] Hans-Peter Wiendahl,et al. Load-Oriented Manufacturing Control , 1994 .
[15] H. Feldman. Restoring our Competitive Edge: Competing through Manufacturing , 1985 .
[16] Eli Schragenheim,et al. Manufacturing at warp speed : optimizing supply chain financial performance : includes simplified drum-buffer-rope , 2000 .
[17] L. Alting,et al. Criteria for selecting a production control philosophy , 1993 .
[18] Marshall L. Fisher,et al. The Impact of Product Variety on Automobile Assembly Operations: Empirical Evidence and Simulation Analysis , 1999 .
[19] Martin Mbaya. The constraints and limitations of manufacturing resource planning (MRP II) as a tool for shop floor control , 2000 .
[20] Jeff Hoi Yan Yeung,et al. Parameters affecting the effectiveness of MRP systems: A review , 1998 .
[21] Terry Hill,et al. Manufacturing Strategy: Text and Cases , 1993 .
[22] Kin-Nam Lau,et al. Information System usage within Small Business Firms , 1990 .
[23] Wendell G. Gilland. A simulation study comparing performance of CONWIP and bottleneck-based release rules , 2002 .
[24] Zhongqin Lin,et al. Adjusting MRP for dynamic differentiation of identical items for process customisation , 2008 .
[25] John R. Wilson,et al. Human performance in industrial scheduling: A framework for understanding , 2001 .
[26] Ashok Kochhar,et al. Case studies based development of a rule-base for the specification of manufacturing planning and control systems , 2000 .
[27] Antti Tenhiälä,et al. Contingency theory of capacity planning: The link between process types and planning methods , 2011 .
[28] Avraham Shtub,et al. Production classification system: concepts, models and strategies , 1985 .
[29] George Liberopoulos,et al. An analytical method for the performance evaluation of echelon kanban control systems , 2005, OR Spectr..
[30] C. Gopinath,et al. LINKING COMPETITIVE STRATEGY AND MANUFACTURING PROCESS TECHNOLOGY , 1995 .
[31] Joakim Wikner,et al. Production planning and control tools , 2000 .
[32] Gary L. Hogg,et al. Workload control in the semiconductor industry , 2002 .
[33] Mayank Chaturvedi,et al. Simulation modelling and analysis of a JIT production system , 1992 .
[34] P. Henrich,et al. Applicability aspects of workload control in job shop production , 2005 .
[35] Jack P. C. Kleijnen,et al. An evolutionary approach to select a pull system among Kanban, Conwip and Hybrid , 2000, J. Intell. Manuf..
[36] Cristovao Silva,et al. Theoretical development of a workload control methodology: evidence from two case studies , 2008 .
[37] Ziaul Huq,et al. Conventional shop control procedures to approximate JIT inventory performance in a job shop , 1999 .
[38] L. Hendrya,et al. Investigating implementation issues for workload control ( WLC ) : A comparative case study analysis , 2008 .
[39] H. William Dettmer,et al. Simplified Drum-Buffer-Rope A Whole System Approach to High Velocity Manufacturing by Eli Schragenheim and H. William Dettmer , 2000 .
[40] M. Hoeck,et al. A workload control procedure for an FMC integrated in a job shop , 2008, Int. J. Comput. Integr. Manuf..
[41] Bernard Burnes,et al. A composite framework of supply chain management and enterprise planning for small and medium‐sized manufacturing enterprises , 2008 .
[42] Feryal Erhun,et al. An overview of design and operational issues of kanban systems , 1999 .
[43] Chih-Hung Tsai,et al. Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures , 2010, Expert Syst. Appl..
[44] Gerard Gaalman,et al. Exploring applicability of the workload control concept , 2004 .
[45] W. C. Benton. Safety Stock and Service Levels in Periodic Review Inventory Systems , 1991 .
[46] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[47] Asbjoern M. Bonvik,et al. A comparison of production-line control mechanisms , 1997 .
[48] Mark Stevenson,et al. A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .
[49] Ashok Kochhar,et al. Identification of the Requirements of Manufacturing Control Systems: A Key Charactericstics Approach , 1992 .
[50] Jan Olhager,et al. Linking manufacturing strategy decisions on process choice with manufacturing planning and control systems , 2002 .
[51] F. Robert Jacobs,et al. Operations and supply chain management : the core , 2013 .
[52] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[53] James F. Cox,et al. An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .
[54] Eli Schragenheim,et al. Supply Chain Management at Warp Speed: Integrating the System from End to End , 2009 .
[55] Jeffrey S. Smith,et al. A formal functional characterization of shop floor control , 1995 .