A Framework for the Selection or Design of Production Planning and Control Systems: A Case of Application

Choosing and designing production planning and control systems are critical tasks because they provide the means to translate the corporate strategy into direct shop floor actions. However, it is not always easy to find the correct systems for an application. This difficulty occurs if the company does not present the necessary criteria for the system, in which case the expected benefits may not be achieved. This study proposes a framework to support the selection or design of a production planning and control system (PPCS) based on the current characteristics of a company. Using relevant parameters, companies are categorized and posteriorly evaluated, identifying the negative and positive relations between the company characteristics and the principles of the evaluated PPCSs. To test the proposed framework, we apply it to determine a suitable system for Ecuadorian small and medium-sized enterprises. Simplified drum buffer rope (S-DBR) approach is found to be a suitable PPCS, and the framework suggested some necessary enhancements to resolve potential weaknesses that could arise during the application of S-DBR. Keywords– production planning and control systems, framework, PPCS selection, small and medium manufacturing enterprises, simplified drum buffer rope

[1]  Peter O'Grady,et al.  Kanban controlled pull systems: an analytic approach , 1989 .

[2]  Yuehwern Yih,et al.  Generic kanban systems for dynamic environments , 1994 .

[3]  Sameh M. Saad,et al.  Development and implementation of a generic order release scheme for modelling MRP-controlled finite-capacitated manufacturing environments , 2004, Int. J. Comput. Integr. Manuf..

[4]  Stephen N. Chapman,et al.  Planning and Control in Multi‐Cell Manufacturing , 1995 .

[5]  Maria Di Mascolo,et al.  A multi-class approximation technique for the analysis of kanban-like control systems , 2001 .

[6]  Mark Stevenson Refining a Workload Control (WLC) concept: a case study , 2006 .

[7]  Martin Land,et al.  Improving a practical DBR buffering approach using Workload Control , 2003 .

[8]  Georg N. Krieg,et al.  Analysis of Multi-Product Kanban Systems with State-Dependent Setups and Lost Sales , 2004, Ann. Oper. Res..

[9]  Wayne J. Davis,et al.  Configuring a Kanban system using a discrete optimization of multiple stochastic responses , 1987 .

[10]  I. P. Tatsiopoulos,et al.  An expert system for the selection of production planning and control software packages , 1999 .

[11]  G. Rabadi,et al.  Supply Chain Inventory Control: A Comparison Among JIT, MRP, and MRP With Information Sharing Using Simulation , 2006 .

[12]  William L. Berry,et al.  Linking Systems to Strategy , 1992 .

[13]  Barbara Pfeffer,et al.  Manufacturing Planning And Control Systems , 2016 .

[14]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[15]  H. Feldman Restoring our Competitive Edge: Competing through Manufacturing , 1985 .

[16]  Eli Schragenheim,et al.  Manufacturing at warp speed : optimizing supply chain financial performance : includes simplified drum-buffer-rope , 2000 .

[17]  L. Alting,et al.  Criteria for selecting a production control philosophy , 1993 .

[18]  Marshall L. Fisher,et al.  The Impact of Product Variety on Automobile Assembly Operations: Empirical Evidence and Simulation Analysis , 1999 .

[19]  Martin Mbaya The constraints and limitations of manufacturing resource planning (MRP II) as a tool for shop floor control , 2000 .

[20]  Jeff Hoi Yan Yeung,et al.  Parameters affecting the effectiveness of MRP systems: A review , 1998 .

[21]  Terry Hill,et al.  Manufacturing Strategy: Text and Cases , 1993 .

[22]  Kin-Nam Lau,et al.  Information System usage within Small Business Firms , 1990 .

[23]  Wendell G. Gilland A simulation study comparing performance of CONWIP and bottleneck-based release rules , 2002 .

[24]  Zhongqin Lin,et al.  Adjusting MRP for dynamic differentiation of identical items for process customisation , 2008 .

[25]  John R. Wilson,et al.  Human performance in industrial scheduling: A framework for understanding , 2001 .

[26]  Ashok Kochhar,et al.  Case studies based development of a rule-base for the specification of manufacturing planning and control systems , 2000 .

[27]  Antti Tenhiälä,et al.  Contingency theory of capacity planning: The link between process types and planning methods , 2011 .

[28]  Avraham Shtub,et al.  Production classification system: concepts, models and strategies , 1985 .

[29]  George Liberopoulos,et al.  An analytical method for the performance evaluation of echelon kanban control systems , 2005, OR Spectr..

[30]  C. Gopinath,et al.  LINKING COMPETITIVE STRATEGY AND MANUFACTURING PROCESS TECHNOLOGY , 1995 .

[31]  Joakim Wikner,et al.  Production planning and control tools , 2000 .

[32]  Gary L. Hogg,et al.  Workload control in the semiconductor industry , 2002 .

[33]  Mayank Chaturvedi,et al.  Simulation modelling and analysis of a JIT production system , 1992 .

[34]  P. Henrich,et al.  Applicability aspects of workload control in job shop production , 2005 .

[35]  Jack P. C. Kleijnen,et al.  An evolutionary approach to select a pull system among Kanban, Conwip and Hybrid , 2000, J. Intell. Manuf..

[36]  Cristovao Silva,et al.  Theoretical development of a workload control methodology: evidence from two case studies , 2008 .

[37]  Ziaul Huq,et al.  Conventional shop control procedures to approximate JIT inventory performance in a job shop , 1999 .

[38]  L. Hendrya,et al.  Investigating implementation issues for workload control ( WLC ) : A comparative case study analysis , 2008 .

[39]  H. William Dettmer,et al.  Simplified Drum-Buffer-Rope A Whole System Approach to High Velocity Manufacturing by Eli Schragenheim and H. William Dettmer , 2000 .

[40]  M. Hoeck,et al.  A workload control procedure for an FMC integrated in a job shop , 2008, Int. J. Comput. Integr. Manuf..

[41]  Bernard Burnes,et al.  A composite framework of supply chain management and enterprise planning for small and medium‐sized manufacturing enterprises , 2008 .

[42]  Feryal Erhun,et al.  An overview of design and operational issues of kanban systems , 1999 .

[43]  Chih-Hung Tsai,et al.  Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures , 2010, Expert Syst. Appl..

[44]  Gerard Gaalman,et al.  Exploring applicability of the workload control concept , 2004 .

[45]  W. C. Benton Safety Stock and Service Levels in Periodic Review Inventory Systems , 1991 .

[46]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[47]  Asbjoern M. Bonvik,et al.  A comparison of production-line control mechanisms , 1997 .

[48]  Mark Stevenson,et al.  A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .

[49]  Ashok Kochhar,et al.  Identification of the Requirements of Manufacturing Control Systems: A Key Charactericstics Approach , 1992 .

[50]  Jan Olhager,et al.  Linking manufacturing strategy decisions on process choice with manufacturing planning and control systems , 2002 .

[51]  F. Robert Jacobs,et al.  Operations and supply chain management : the core , 2013 .

[52]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[53]  James F. Cox,et al.  An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .

[54]  Eli Schragenheim,et al.  Supply Chain Management at Warp Speed: Integrating the System from End to End , 2009 .

[55]  Jeffrey S. Smith,et al.  A formal functional characterization of shop floor control , 1995 .