Delays to Large Construction Projects in Ghana: A Risk Overview

Delay to large scale projects, which is as a result of actions or inactions of some project stakeholders, is becoming a global phenomena and Ghana is no exception. The objective of the research is to identify, rate and rank the most significant risk factors that causes delay on projects and examine the social impact of these delays to recommend modalities to help mitigate these risk factors. The study adopted quantitative methods with the distribution of 144 questionnaires to built environment professionals receiving a response rate of 75.7%. The instrument listed 58 common factors under eight categories that contribute to the causes of delay for respondents to rate. Analysis of data non-parametric test revealed that client, contractor, material and finance category factors significantly resulted in the schedule delay of large infrastructural projects. The survey analysis revealed that micro-factors that result in delays to large construction projects are time constraint, cost overrun, payment problems, dispute and litigation. The research recommended the following modalities to minimize such delays: availability of resources, improved communication and coordination, proper scope definition and feasibilities, utilization of modern technology, appropriate application of technologically based systems and competent project management’s structures.

[1]  Harold Kerzner,et al.  SUMMER 2011 TEXTBOOKS EM 536 Project Management Project Management: A System Approach to Planning, Scheduling, and Controlling , 2011 .

[2]  A. Smith,et al.  Research Methodology: A Step-by-step Guide for Beginners , 2012 .

[3]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[4]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .

[5]  Stephen O. Ogunlana,et al.  A study on project success factors in large construction projects in Vietnam , 2004 .

[6]  Joseph Ignatius Teye Buertey,et al.  Project Cost Contingency Estimation in Ghana: An Integrated Approach , 2012 .

[7]  J. O'Neill,et al.  Project management. , 2001, Health management technology.

[8]  Olajide Timothy Ibironke,et al.  Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria , 2013 .

[9]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[10]  Stephen Scott,et al.  Analysing the risks affecting construction delay and cost overruns in Indonesian building projects , 2005 .

[11]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[12]  L. T. Wong,et al.  Fire services installation related contributors of construction delays , 2006 .

[13]  구자민,et al.  Construction Delay Analysis Method Considering Productivity , 2004 .

[14]  George E. Baram,et al.  Concurrent Delays—What Are They and How to Deal With Them? , 2000 .

[15]  C. Spearman The proof and measurement of association between two things. , 2015, International journal of epidemiology.

[16]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .