Building Safety indicators: Part 1 – Theoretical foundation
暂无分享,去创建一个
[1] Vicki M. Bier,et al. The performance of precursor-based estimators for rare event frequencies , 1995 .
[2] Nancy G. Leveson,et al. A new accident model for engineering safer systems , 2004 .
[3] Knut Øien,et al. Development of Early Warning Indicators based on Resilience Engineering , 2010 .
[4] J. N. O'Brien,et al. Influence of organizational factors on performance reliability , 1991 .
[5] Andrew Hopkins,et al. Lessons from Longford: The ESSO Gas Plant Explosion , 2000 .
[6] William Eugene Tarrants,et al. The measurement of safety performance , 1980 .
[7] D. Silverman,et al. The Structure of Organizations. , 1971 .
[8] Knut Øien. Risk indicators as a tool for risk control , 2001, Reliab. Eng. Syst. Saf..
[9] Najmus Saqib,et al. Aggregation of safety performance indicators to higher-level indicators , 2008, Reliab. Eng. Syst. Saf..
[10] Ben J. M. Ale. More thinking about process safety indicators , 2009 .
[11] J. Wreathall,et al. The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants , 1990 .
[12] Knut Øien,et al. A framework for the establishment of organizational risk indicators , 2001, Reliab. Eng. Syst. Saf..
[13] Jason R. W. Merrick,et al. Leading Indicators of Safety in Virtual Organizations , 2007 .
[14] Urban Kjellén,et al. The safety measurement problem revisited , 2009 .
[15] P. Wiedemann,et al. Risk management and sustainable development: mutual lessons from approaches to the use of indicators , 1999 .
[16] Alfred A. Marcus,et al. Organization and safety in nuclear power plants , 1990 .
[17] George Apostolakis,et al. The work process analysis model (WPAM) , 1994 .
[18] W. E. Vesely,et al. Validation of risk-based performance indicators: Safety system function trends , 1989 .
[19] I. A. Herrera,et al. Comparing a multi-linear (STEP) and systemic (FRAM) method for accident analysis , 2010, Reliab. Eng. Syst. Saf..
[20] Henry Mintzberg. Mintzberg on management : inside our strange world of organizations , 1991 .
[21] Knut Øien,et al. Building Safety by resilient organization – a case specific approach , 2009 .
[22] Lars Harms-Ringdahl,et al. Dimensions in safety indicators , 2009 .
[23] J. W. Minarick,et al. Precursors to potential severe core damage accidents, 1969-1979, a status report , 1982 .
[24] M Pandey. Safety and Reliability: ESREL'99 , 2000 .
[25] Jan Erik Vinnem,et al. Safety, economic incentives and insurance in the Norwegian petroleum industry , 2008, Reliab. Eng. Syst. Saf..
[26] James T. Reason,et al. Managing the risks of organizational accidents , 1997 .
[27] Christopher Nemeth,et al. Remaining sensitive to the possibility of failure , 2008 .
[28] Pjm Peter Sonnemans,et al. Accidents: A discrepancy between indicators and facts! , 2008 .
[29] Knut Øien,et al. Risk Level Indicators for Surveillance of Changes in Risk Level , 1997 .
[30] John Wreathall,et al. Leading? Lagging? Whatever! , 2009 .
[31] Andrew Hale. Special Issue on Process Safety Indicators , 2009 .
[32] James W. Johnson,et al. The US NRC's accident sequence precursor program: an overview and development of a Bayesian approach to estimate core damage frequency using precursor information , 1996 .
[33] George Apostolakis,et al. Incorporating organizational factors into risk assessment through the analysis of work processes , 1994 .
[34] David Woods,et al. Escaping failures of foresight , 2009 .
[35] Andrew Hale,et al. Why safety performance indicators , 2009 .
[36] Urban Kjellen,et al. Prevention of accidents through experience feedback , 2000 .
[37] Ingrid Bouwer Utne,et al. Building Safety indicators: Part 2 - Application, practices and results , 2011 .
[38] Henry Mintzberg,et al. Power in and Around Organizations , 1983 .
[39] Ulrich Hauptmanns,et al. Management of health, safety and environment in process industry , 2008 .
[40] M. F. Mullen,et al. Development of programmatic performance indicators , 1988 .
[41] Albert L. Mitchell. Texas City, Texas , 2011 .
[42] Andrew Hopkins,et al. Reply to comments , 2009 .
[43] Kathryn Mearns,et al. From reactive to proactive – Can LPIs deliver? , 2009 .
[44] R. Shikiar,et al. Objective indicators of organizational performance at nuclear power plants , 1986 .
[45] Linda J. Bellamy. Process safety indicators: Response to Andrew Hopkins , 2009 .
[46] Jan Erik Vinnem. Risk indicators for major hazards on offshore installations , 2010 .
[47] Carlos Guedes Soares,et al. Safety, Reliability and Risk Analysis : Theory, Methods and Applications (4 Volumes + CD-ROM) , 2009 .
[48] Gudela Grote. Response to Andrew Hopkins , 2009 .
[49] David Woods,et al. Resilience Engineering: Concepts and Precepts , 2006 .