Building Safety indicators: Part 1 – Theoretical foundation

Development of early warning indicators to prevent major accidents – to ‘build safety’ – should rest on a sound theoretical foundation, including basic concepts, main perspectives and past developments, as well as an overview of the present status and ongoing research. In this paper we have established the theoretical basis for development of indicators used as early warnings of major accidents. Extensive work on indicators have been carried out in the past, and this could and should have been better utilized by industry, e.g., by focusing more on major hazard indicators, and less on personal safety indicators. Recent discussions about safety indicators have focused on the distinction between leading and lagging indicators; however, a discussion on terms should not impede the development of useful indicators that can provide (early) warnings about potential major accidents.

[1]  Vicki M. Bier,et al.  The performance of precursor-based estimators for rare event frequencies , 1995 .

[2]  Nancy G. Leveson,et al.  A new accident model for engineering safer systems , 2004 .

[3]  Knut Øien,et al.  Development of Early Warning Indicators based on Resilience Engineering , 2010 .

[4]  J. N. O'Brien,et al.  Influence of organizational factors on performance reliability , 1991 .

[5]  Andrew Hopkins,et al.  Lessons from Longford: The ESSO Gas Plant Explosion , 2000 .

[6]  William Eugene Tarrants,et al.  The measurement of safety performance , 1980 .

[7]  D. Silverman,et al.  The Structure of Organizations. , 1971 .

[8]  Knut Øien Risk indicators as a tool for risk control , 2001, Reliab. Eng. Syst. Saf..

[9]  Najmus Saqib,et al.  Aggregation of safety performance indicators to higher-level indicators , 2008, Reliab. Eng. Syst. Saf..

[10]  Ben J. M. Ale More thinking about process safety indicators , 2009 .

[11]  J. Wreathall,et al.  The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants , 1990 .

[12]  Knut Øien,et al.  A framework for the establishment of organizational risk indicators , 2001, Reliab. Eng. Syst. Saf..

[13]  Jason R. W. Merrick,et al.  Leading Indicators of Safety in Virtual Organizations , 2007 .

[14]  Urban Kjellén,et al.  The safety measurement problem revisited , 2009 .

[15]  P. Wiedemann,et al.  Risk management and sustainable development: mutual lessons from approaches to the use of indicators , 1999 .

[16]  Alfred A. Marcus,et al.  Organization and safety in nuclear power plants , 1990 .

[17]  George Apostolakis,et al.  The work process analysis model (WPAM) , 1994 .

[18]  W. E. Vesely,et al.  Validation of risk-based performance indicators: Safety system function trends , 1989 .

[19]  I. A. Herrera,et al.  Comparing a multi-linear (STEP) and systemic (FRAM) method for accident analysis , 2010, Reliab. Eng. Syst. Saf..

[20]  Henry Mintzberg Mintzberg on management : inside our strange world of organizations , 1991 .

[21]  Knut Øien,et al.  Building Safety by resilient organization – a case specific approach , 2009 .

[22]  Lars Harms-Ringdahl,et al.  Dimensions in safety indicators , 2009 .

[23]  J. W. Minarick,et al.  Precursors to potential severe core damage accidents, 1969-1979, a status report , 1982 .

[24]  M Pandey Safety and Reliability: ESREL'99 , 2000 .

[25]  Jan Erik Vinnem,et al.  Safety, economic incentives and insurance in the Norwegian petroleum industry , 2008, Reliab. Eng. Syst. Saf..

[26]  James T. Reason,et al.  Managing the risks of organizational accidents , 1997 .

[27]  Christopher Nemeth,et al.  Remaining sensitive to the possibility of failure , 2008 .

[28]  Pjm Peter Sonnemans,et al.  Accidents: A discrepancy between indicators and facts! , 2008 .

[29]  Knut Øien,et al.  Risk Level Indicators for Surveillance of Changes in Risk Level , 1997 .

[30]  John Wreathall,et al.  Leading? Lagging? Whatever! , 2009 .

[31]  Andrew Hale Special Issue on Process Safety Indicators , 2009 .

[32]  James W. Johnson,et al.  The US NRC's accident sequence precursor program: an overview and development of a Bayesian approach to estimate core damage frequency using precursor information , 1996 .

[33]  George Apostolakis,et al.  Incorporating organizational factors into risk assessment through the analysis of work processes , 1994 .

[34]  David Woods,et al.  Escaping failures of foresight , 2009 .

[35]  Andrew Hale,et al.  Why safety performance indicators , 2009 .

[36]  Urban Kjellen,et al.  Prevention of accidents through experience feedback , 2000 .

[37]  Ingrid Bouwer Utne,et al.  Building Safety indicators: Part 2 - Application, practices and results , 2011 .

[38]  Henry Mintzberg,et al.  Power in and Around Organizations , 1983 .

[39]  Ulrich Hauptmanns,et al.  Management of health, safety and environment in process industry , 2008 .

[40]  M. F. Mullen,et al.  Development of programmatic performance indicators , 1988 .

[41]  Albert L. Mitchell Texas City, Texas , 2011 .

[42]  Andrew Hopkins,et al.  Reply to comments , 2009 .

[43]  Kathryn Mearns,et al.  From reactive to proactive – Can LPIs deliver? , 2009 .

[44]  R. Shikiar,et al.  Objective indicators of organizational performance at nuclear power plants , 1986 .

[45]  Linda J. Bellamy Process safety indicators: Response to Andrew Hopkins , 2009 .

[46]  Jan Erik Vinnem Risk indicators for major hazards on offshore installations , 2010 .

[47]  Carlos Guedes Soares,et al.  Safety, Reliability and Risk Analysis : Theory, Methods and Applications (4 Volumes + CD-ROM) , 2009 .

[48]  Gudela Grote Response to Andrew Hopkins , 2009 .

[49]  David Woods,et al.  Resilience Engineering: Concepts and Precepts , 2006 .