Green construction assessment for environmental management in the construction industry of Hong Kong
暂无分享,去创建一个
Vivian W. Y Tam | Chi Ming Tam | W. S. Tsui | C. Tam | W. Tsui | V. Tam
[1] T. Alhazmi,et al. Project Procurement System Selection Model , 2000 .
[2] Arthur W. T. Leung,et al. Site layout planning using nonstructural fuzzy decision support system , 2002 .
[3] Ssy Lau,et al. Introduction to the Building Research Establishment Environmental Assessment Method (BREEAM) in UK , 2002 .
[4] C. Jasch. Environmental performance evaluation and indicators , 2000 .
[5] Qian Wang,et al. Priority setting in maintenance management: a modified multi-attribute approach using analytic hierarchy process , 1998 .
[6] Alan Griffith. Environmental Management in Construction , 1994 .
[7] T. Saaty. Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process , 2000 .
[8] Tom Tibor,et al. Iso 14000: A Guide to the New Environmental Management Standards , 1995 .
[9] Patrick S. W. Fong,et al. Final contractor selection using the analytical hierarchy process , 2000 .
[10] Johan Thoresen,et al. Environmental performance evaluation — a tool for industrial improvement , 1999 .
[11] C. P. LI,et al. Environmental Impact Evaluation Model for Industrial Processes , 2001, Environmental management.
[12] John T. Willig,et al. Moving ahead with ISO 14000 : improving environmental management and advancing sustainable development , 1997 .
[13] S. Maddock,et al. Environmental Management: Its Role in Corporate Strategy , 1994 .
[14] Xander Olsthoorn,et al. Environmental Indicators for Business: A Review of the Literature and Standardisation Methods , 2001 .
[15] Raymond J. Cole,et al. Building environmental assessment methods: assessing construction practices , 2000 .
[16] Chi Ming Tam,et al. Non-structural fuzzy decision support system for evaluation of construction safety management system , 2002 .