Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions

In this paper, we formulate the material requirements planning) problem of a first-tier supplier in an automobile supply chain through a fuzzy multi-objective decision model, which considers three conflictive objectives to optimise: minimisation of normal, overtime and subcontracted production costs of finished goods plus the inventory costs of finished goods, raw materials and components; minimisation of idle time; minimisation of backorder quantities. Lack of knowledge or epistemic uncertainty is considered in the demand, available and required capacity data. Integrity conditions for the main decision variables of the problem are also considered. For the solution methodology, we use a fuzzy goal programming approach where the importance of the relations among the goals is considered fuzzy instead of using a crisp definition of goal weights. For illustration purposes, an example based on modifications of real-world industrial problems is used.

[1]  G. Reklaitis,et al.  A simulation based optimization approach to supply chain management under demand uncertainty , 2004, Comput. Chem. Eng..

[2]  MulaJ.,et al.  MRP with flexible constraints , 2006 .

[3]  Mohsen Ebrahimi Moghaddam,et al.  Multi-site integrated production-distribution planning with trans-shipment: a fuzzy goal programming approach , 2012 .

[4]  Hau L. Lee,et al.  Material Management in Decentralized Supply Chains , 1993, Oper. Res..

[5]  Raul Poler Escoto,et al.  MRP with flexible constraints: A fuzzy mathematical programming approach , 2006, Fuzzy Sets Syst..

[6]  Mariano Jiménez,et al.  Ranking fuzzy numbers through the Comparison of its Expected Intervals , 1996, Int. J. Uncertain. Fuzziness Knowl. Based Syst..

[7]  Didier Dubois,et al.  The role of fuzzy sets in decision sciences: Old techniques and new directions , 2011, Fuzzy Sets Syst..

[8]  Kin Keung Lai,et al.  A stochastic programming approach for multi-site aggregate production planning , 2006, J. Oper. Res. Soc..

[9]  Bernard Grabot,et al.  Integration of uncertain and imprecise orders in the MRP method , 2005, J. Intell. Manuf..

[10]  Benita M. Beamon,et al.  A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .

[11]  B. Adenso-Díaz,et al.  Reverse MRP under uncertain and imprecise demand , 2009 .

[12]  S. T. Enns,et al.  Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies , 2006 .

[13]  Josefa Mula,et al.  Capacity and material requirement planning modelling by comparing deterministic and fuzzy models , 2008 .

[14]  Alexandre Dolgui,et al.  Optimal time phasing and periodicity for MRP with POQ policy , 2011 .

[15]  James H. Bookbinder,et al.  Inventory and Transportation Planning in the Distribution of Fine Papers , 1989 .

[16]  Josefa Mula,et al.  Solution Approaches for Material Requirement Planning* with Fuzzy Costs , 2012 .

[17]  W. K. Chiang,et al.  The value of information sharing in the presence of supply uncertainty and demand volatility , 2007 .

[18]  Andrea Matta,et al.  Mathematical programming representation of pull controlled single-product serial manufacturing systems , 2012, J. Intell. Manuf..

[19]  Josefa Mula,et al.  An interactive fuzzy multi-objective approach for operational transport planning in an automobile supply chain , 2010 .

[20]  Raul Poler,et al.  Models for production planning under uncertainty: A review ☆ , 2006 .

[21]  Morteza Bagherpour,et al.  Optimization of material requirement planning by fuzzy multi-objective linear programming , 2008 .

[22]  Amelia Bilbao-Terol,et al.  Linear programming with fuzzy parameters: An interactive method resolution , 2007, Eur. J. Oper. Res..

[23]  H. Zimmermann Fuzzy programming and linear programming with several objective functions , 1978 .

[24]  Raul Poler Escoto,et al.  Fuzzy optimization for supply chain planning under supply, demand and process uncertainties , 2009, Fuzzy Sets Syst..

[25]  Josefa Mula,et al.  Quantitative models for supply chain planning under uncertainty: a review , 2009 .

[26]  Jan Olhager,et al.  Evolution of operations planning and control: from production to supply chains , 2013 .

[27]  S. C. L. Koh MRP-controlled batch-manufacturing environment under uncertainty , 2004, J. Oper. Res. Soc..

[28]  Dylan Jones,et al.  A practical weight sensitivity algorithm for goal and multiple objective programming , 2011, Eur. J. Oper. Res..

[29]  Alexandre Dolgui,et al.  Planned lead time optimization in material requirement planning environment for multilevel production systems , 2008 .

[30]  Alexandre Dolgui,et al.  A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty , 2013 .

[31]  Li Sun,et al.  Simulation analysis of a multi-item MRP system based on factorial design , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).

[32]  Stanisław Heilpern,et al.  The expected value of a fuzzy number , 1992 .

[33]  K. Inderfurth How to protect against demand and yield risks in MRP systems , 2009 .

[34]  Alexandre Dolgui,et al.  A bibliography of non-deterministic lot-sizing models , 2014 .

[35]  Jens Ove Riis,et al.  Production Planning & Control , 2013 .

[36]  Muris Lage Junior,et al.  Variations of the kanban system: Literature review and classification , 2010 .

[37]  S.A. Torabi,et al.  An interactive possibilistic programming approach for multiple objective supply chain master planning , 2008, Fuzzy Sets Syst..

[38]  Bernard Grabot,et al.  Modelling of ill-known requirements and integration in production planning , 2011 .

[39]  Yi-Feng Hung,et al.  Determining safety stocks for production planning in uncertain manufacturing , 1999 .

[40]  Josefa Mula,et al.  Production , Manufacturing and Logistics A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment , 2010 .

[41]  Alexandre Dolgui,et al.  Optimal supply planning in MRP environments for assembly systems with random component procurement times , 2008 .

[42]  Young Hae Lee,et al.  Production-distribution planning in supply chain using a hybrid approach , 2002 .

[43]  Onur Aköz,et al.  A fuzzy goal programming method with imprecise goal hierarchy , 2007, Eur. J. Oper. Res..

[44]  C. Hwang,et al.  Possibilistic linear programming for managing interest rate risk , 1993 .

[45]  Manoj Kumar Tiwari,et al.  Integration of process planning and scheduling through adaptive setup planning: a multi-objective approach , 2013 .

[46]  Hui Li,et al.  Computing efficient solutions to fuzzy multiple objective linear programming problems , 2006, Fuzzy Sets Syst..

[47]  Irem Ozkarahan,et al.  A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach , 2008 .

[48]  Raul Poler Escoto,et al.  Material Requirement Planning with fuzzy constraints and fuzzy coefficients , 2007, Fuzzy Sets Syst..

[49]  Josefa Mula,et al.  Fuzzy multi-objective optimisation for master planning in a ceramic supply chain , 2012 .

[50]  Josefa Mula,et al.  A Modified Approach Based on Ranking Fuzzy Numbers for Fuzzy Integer Programming with Equality Constraints , 2014 .