Multiple-Lot Lot Streaming in a Two-stage Assembly System

In this chapter, we address a lot streaming problem for a two-stage assembly system involving multiple lots with the objective of minimizing the makespan. Each lot consists of items of a unique product type. We designate this problem as a multiple-lot, two-stage assembly, lot streaming problem (ML-TSALSP) which combines two key decisions: lot splitting and lot sequencing. While the problem of scheduling in such a machine environment has been addressed in the literature, our problem is different because of the presence of the streaming of a lot over the stages. We derive some structural properties for this problem, and develop a branch-and-bound-based solution procedure that relies on effective lower bounds and dominance properties. Our computational investigation reveals the efficacy of the proposed branch-and-bound-based methodology for this problem.

[1]  Ferda Can Çetinkaya,et al.  Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .

[2]  Chung-Yee Lee,et al.  Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .

[3]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[4]  Subhash C. Sarin,et al.  Evaluation of the potential benefits of lot streaming in flow-shop systems , 2000 .

[5]  Xi Sun,et al.  Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling , 2003, Eur. J. Oper. Res..

[6]  Kenneth R. Baker,et al.  Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..

[7]  Liming Yao,et al.  Modeling, Analysis and Solution Approaches for Some Optimization Problems: High Multiplicity Asymmetric Traveling Salesman, Primary Pharmaceutical Manufacturing Scheduling, and Lot Streaming in an Assembly System , 2008 .

[8]  R. Gomory,et al.  Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .

[9]  R. Vickson Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .

[10]  S. M. Johnson,et al.  Optimal two- and three-stage production schedules with setup times included , 1954 .

[11]  F. Can Çinkaya,et al.  Unit sized transfer batch scheduling with setup times , 1992 .

[12]  Subhash C. Sarin,et al.  Single-batch lot streaming in a two-stage assembly system , 2011 .

[13]  Subhash C. Sarin,et al.  Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups , 2003, J. Comb. Optim..

[14]  C. Sriskandarajah,et al.  Lot streaming and scheduling multiple products in two-machine no-wait flowshops , 1999 .

[15]  C. Potts,et al.  A branch and bound algorithm for the two-stage assembly scheduling problem , 1997 .