Application of Hoop Stress Limit State and Predicted Corrosion Rate in Underground Gas Transmission Pipeline Inspection Plan
暂无分享,去创建一个
Dedi Priadi | Sulistijono | Johny Wahyuadi Soedarsono | Patuan Alfon | J. Soedarsono | D. Priadi | Patuan Alfon
[1] Kamel Chaoui,et al. Reliability assessment of underground pipelines under the combined effect of active corrosion and residual stress , 2006 .
[2] A. W. Cooper,et al. Criteria of Soil Aggressiveness Towards Buried Metals. II*. Assessment Of Various Soils , 1967 .
[3] Dedi Priadi,et al. Pipeline Material Reliability Analysis Regarding to Probability of Failure Using Corrosion Degradation Model , 2011 .
[4] Faisal Khan,et al. The selection of corrosion prior distributions for risk based integrity modeling , 2009 .
[5] Francisco Caleyo,et al. A study on the reliability assessment methodology for pipelines with active corrosion defects , 2002 .
[6] Han Ping Hong,et al. Inspection and maintenance planning of pipeline under external corrosion considering generation of new defects , 1999 .
[7] R. Starkey,et al. Anaerobic Corrosion of Iron in Soil , 1946 .
[8] A. W. Cooper,et al. Criteria of Soil Aggressiveness Towards Buried Metals. I. Experimental Methods , 1967 .
[9] A. W. Cooper,et al. Criteria of Soil Aggressiveness Towards Buried Metals. III*. Verification of Predicted Behaviour of Selected Soils , 1967 .
[10] Robert Sutherby,et al. External corrosion of line pipe -- A summary of research activities performed since 1983 , 1995 .