Notice of RetractionIntegrated production and delivery scheduling problem with two competing agents
暂无分享,去创建一个
[1] Chris N. Potts,et al. Supply chain scheduling: Batching and delivery , 2003, Oper. Res..
[2] Chung-Yee Lee,et al. Machine scheduling with job delivery coordination , 2004, Eur. J. Oper. Res..
[3] Alessandro Agnetis,et al. Scheduling Problems with Two Competing Agents , 2004, Oper. Res..
[4] Asoo J. Vakharia,et al. Integrated production/distribution planning in supply chains: An invited review , 1999, Eur. J. Oper. Res..
[5] George L. Vairaktarakis,et al. Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..
[6] Chung-Lun Li,et al. Coordinating production and distribution of jobs with bundling operations , 2007 .
[7] T. C. Edwin Cheng,et al. A note on the complexity of the problem of two-agent scheduling on a single machine , 2006, J. Comb. Optim..
[8] Chung-Lun Li,et al. Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..
[9] T. C. Edwin Cheng,et al. Multi-agent scheduling on a single machine with max-form criteria , 2008, Eur. J. Oper. Res..
[10] Zhi-Long Chen,et al. Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..