Dynamic scheduling of flexible manufacturing systems using neural networks and inductive learning
暂无分享,去创建一个
[1] J. Ross Quinlan,et al. C4.5: Programs for Machine Learning , 1992 .
[2] Shinichi Nakasuka,et al. Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool , 1992 .
[3] Philip J. Stone,et al. Experiments in induction , 1966 .
[4] Alberto Gómez,et al. A review of machine learning in dynamic scheduling of flexible manufacturing systems , 2001, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.
[5] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[6] Yuehwern Yih,et al. A competitive neural network approach to multi-objective FMS scheduling , 1998 .
[7] Joseph J. Talavage,et al. A transient-based real-time scheduling algorithm in FMS , 1991 .
[8] Geoffrey E. Hinton,et al. Learning representations by back-propagating errors , 1986, Nature.
[9] Yuehwern Yih,et al. A study on decision rules of a scheduling model in an FMS , 1993 .
[10] Minheekim,et al. Simulation-based real-time scheduling in a flexible manufacturing system , 1994 .
[11] Michael T. Manry,et al. Neural networks: Algorithms, applications, and programming techniques: By James A. Freeman and David M. Skapura, Addison-Wesley Publishing, Reading, MA, ISBN 0-201-51376-5 , 1994 .
[12] John R. Anderson,et al. MACHINE LEARNING An Artificial Intelligence Approach , 2009 .
[13] David M. Skapura,et al. Neural networks - algorithms, applications, and programming techniques , 1991, Computation and neural systems series.
[14] Richard A. Wysk,et al. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing , 1989 .
[15] Geoffrey E. Hinton,et al. Learning representations by back-propagation errors, nature , 1986 .
[16] Richard P. Lippmann,et al. An introduction to computing with neural nets , 1987 .
[17] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[18] Yuehwern Yih,et al. Integration of inductive learning and neural networks for multi-objective FMS scheduling , 1998 .
[19] Pius J. Egbelu,et al. Characterization of automatic guided vehicle dispatching rules , 1984 .
[20] Eric M. Malstrom,et al. Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator , 1988 .
[21] David R. Denzler,et al. Experimental investigation of flexible manufacturing system scheduling decision rules , 1987 .
[22] Siddhartha Bhattacharyya,et al. A review of machine learning in scheduling , 1994 .
[23] L. N. Van Wassenhove,et al. Analysis of Scheduling Rules for an FMS , 1990 .
[24] Geo-Ry Tang,et al. A list approach to tolerance charting , 1993 .
[25] Richard H. Choi,et al. Evaluation of FMS parameters on overall system performance , 1988 .
[26] Yeong-Dae Kim,et al. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .
[27] D.-H. Lee,et al. Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems , 1998 .
[28] Michael J. Shaw,et al. Intelligent Scheduling with Machine Learning Capabilities: The Induction of Scheduling Knowledge§ , 1992 .
[29] Robert M. O'Keefe,et al. Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system , 1992 .
[30] Yuehwern Yih,et al. Indentifying attributes for knowledge-based development in dynamic scheduling environments , 1996 .