Relevance of the Network Factor in Selection of Consultants

Consultant architects and engineers (AE) are usually selected based on their skills. Additionally, the selection of consultants may also be based on a series of attributes known as the “network factor.” Attributes of the network factor include the reputations of AE and past, ongoing, and future relationships with clients, contractors, and other consultants. The purpose of this study is to identify network attributes that are relevant to AE selection. Data from parties who select and hire AE (i.e., project owners and design/build contractors) as well as data from AE themselves were collated from standard questionnaires posted to respondents. The results of the study reveal that the reputations of AE are the most important network attribute in determining AE selection. To increase the chances of AE being engaged as design consultants, it is important to have a reputation of being trustworthy, professional, and honest. In addition, design/build contractors tend to select AE who have harmonious relationships with them, with the project owner, and with other consultants in the project team. Finally, the study also concludes that it is advantageous for AE to adopt agreeable personalities in professional contexts in order to establish harmonious relationships with clients, contractors and other consultants, thus increasing the demand for their professional services.

[1]  E. Goffman On face-work; an analysis of ritual elements in social interaction. , 1955, Psychiatry.

[2]  Karen A. Jehn,et al.  Interpersonal relationships and task performance: An examination of mediation processes in friendship and acquaintance groups. , 1997 .

[3]  Joyce Hogan,et al.  Personality Measurement and Employment Decisions. Questions and Answers. , 1996 .

[4]  Milan Kubr How to select and use consultants. A client’s guide (MDS 31) , 1993 .

[5]  D. Bartram,et al.  The recruitment and selection of young people by small businesses , 1995 .

[6]  Mark S. Granovetter Economic Action and Social Structure: The Problem of Embeddedness , 1985, American Journal of Sociology.

[7]  Jacob Cohen Statistical Power Analysis , 1992 .

[8]  H Smyth Design and Build Marketing: Issues and Criteria for Architect Selection , 1996 .

[9]  Helen Lingard,et al.  Construction site safety in Hong Kong , 1994 .

[10]  C. Hill Cooperation, Opportunism, and the Invisible Hand: Implications for Transaction Cost Theory , 1990 .

[11]  Rosalie L. Tung,et al.  Achieving business success in Confucian societies: The importance of guanxi (connections) , 1996 .

[12]  Derek H.T. Walker,et al.  The contribution of the client representative to the creation and maintenance of good project inter‐team relationships , 1998 .

[13]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[14]  F. Pretorius,et al.  Conflict and individual coping behaviour in informal matrix organizations within the construction industry , 1986 .

[15]  Murray R. Barrick,et al.  Relating member ability and personality to work-team processes and team effectiveness. , 1998 .

[16]  R. Katz The Effects of Group Longevity on Project Communication and Performance. , 1982 .

[17]  Keith R. Molenaar,et al.  Selecting Design-Build: Public and Private Sector Owner Attitudes , 1996 .

[18]  K. Jehn A Multimethod Examination of the Benefits and Detriments of Intragroup Conflict , 1995 .

[19]  A. Athos,et al.  The Art of Japanese Management , 1982 .

[20]  Cindy P. Lindsay,et al.  Experiences in Training Chinese Business People To Use U.S. Management Techniques , 1985 .