Life cycle stage practices and strategies for circular economy: assessment in construction and demolition industry of an emerging economy

[1]  M. El‐Naas,et al.  Accelerating the Transition to a Circular Economy for Net-Zero Emissions by 2050: A Systematic Review , 2022, Sustainability.

[2]  L. Campos,et al.  A systemic review for measuring circular economy with multi-criteria methods , 2022, Environmental Science and Pollution Research.

[3]  Martin Agyemang,et al.  Roles and actions of managers in circular supply chain implementation: A resource orchestration perspective , 2021, Sustainable Production and Consumption.

[4]  Wei Yang,et al.  An analytical review on application of life cycle assessment in circular economy for built environment , 2021, Journal of Building Engineering.

[5]  Ronald L. Mersky,et al.  Circular Economy in the Construction Industry , 2021 .

[6]  P. Gruber,et al.  Construction Aspects in Ethiopia's Architectural Traditions: A Comparative View , 2021, Journal of Traditional Building, Architecture and Urbanism.

[7]  C. Haas,et al.  Circular economy applications in the construction industry: A global scan of trends and opportunities , 2021, Journal of Cleaner Production.

[8]  S. Thomas Ng,et al.  A review of the circularity gap in the construction industry through scientometric analysis , 2021 .

[9]  H. Gupta,et al.  Assessing drivers of post-harvest losses: tangible and intangible resources’ perspective , 2021, Environment, Development and Sustainability.

[10]  Martin Skitmore,et al.  Integration of life cycle assessment and life cycle cost using building information modeling: A critical review , 2021 .

[11]  F. Jia,et al.  Determining and evaluating socially sustainable supply chain criteria in agri-sector of developing countries: insights from West Africa cashew industry , 2020, Production Planning & Control.

[12]  S. Luthra,et al.  Development of a framework for selecting a sustainable location of waste electrical and electronic equipment recycling plant in emerging economies , 2020 .

[13]  Yuhong Zhao China in transition towards a circular economy: from policy to practice , 2020 .

[14]  Richard L. Gruner,et al.  Exploring environmental benefits of reuse and recycle practices: A circular economy case study of a modular building , 2020 .

[15]  Dehu Chen,et al.  Evaluating critical barriers and pathways to implementation of e-waste formalization management systems in Ghana: a hybrid BWM and fuzzy TOPSIS approach , 2020, Environmental Science and Pollution Research.

[16]  L. Bragança,et al.  Towards circular and more sustainable buildings: A systematic literature review on the circular economy in the built environment , 2020 .

[17]  S. F. Tavares,et al.  Circular economy in the construction industry: A systematic literature review , 2020 .

[18]  R. Sunindijo,et al.  Characteristics of the Construction Industry in Developing Countries and Its Implications for Health and Safety: An Exploratory Study in Ghana , 2020, International journal of environmental research and public health.

[19]  E. Adinyira,et al.  Factors driving the adoption of green certification of buildings in Ghana , 2020 .

[20]  A. Ragossnig Construction and demolition waste – Major challenges ahead! , 2020, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[21]  Luis Alberto López Ruiz,et al.  The circular economy in the construction and demolition waste sector – A review and an integrative model approach , 2020 .

[22]  P. Lam,et al.  An integrated life cycle assessment of different façade systems for a typical residential building in Ghana , 2020 .

[23]  S. Zanni,et al.  Circular economy in Italian SMEs: A multi-method study , 2020, Journal of Cleaner Production.

[24]  S. Ulgiati,et al.  Circular economy transition in Italy. Achievements, perspectives and constraints , 2020 .

[25]  Gifty Efua Asman,et al.  Critical components of Environmentally Sustainable Buildings Design Practices of office buildings in Ghana , 2019, Journal of Building Engineering.

[26]  W. Stahel,et al.  The Circular Economy , 2019 .

[27]  P. Desmond,et al.  Accelerating the transition to a circular economy in Africa , 2019, The Circular Economy and the Global South.

[28]  T. Foxon The Circular Economy and the Global South , 2019 .

[29]  Prof Vikas Kumar,et al.  Towards a more circular economy: exploring the awareness, practices, and barriers from a focal firm perspective , 2018 .

[30]  Lukumon O. Oyedele,et al.  Salvaging building materials in a circular economy: A BIM-based whole-life performance estimator , 2018 .

[31]  Jingzheng Ren,et al.  Construction and demolition waste management in China through the 3R principle , 2018 .

[32]  Abdul Moktadir,et al.  Drivers to sustainable manufacturing practices and circular economy: a perspective of leather industries in Bangladesh , 2018 .

[33]  Kannan Govindan,et al.  A systematic review on drivers, barriers, and practices towards circular economy: a supply chain perspective , 2018, Int. J. Prod. Res..

[34]  R. Merli,et al.  How do scholars approach the circular economy? A systematic literature review , 2017 .

[35]  Ruane Fernandes de Magalhães,et al.  Reducing construction waste: A study of urban infrastructure projects. , 2017, Waste management.

[36]  Anthony Halog,et al.  Developing strategies for managing construction and demolition wastes in Malaysia based on the concept of circular economy , 2017 .

[37]  S. Jayaraj,et al.  Multi-response optimization of process parameters in biogas production from food waste using Taguchi – Grey relational analysis , 2017 .

[38]  Junqiang Xia,et al.  Urban construction and demolition waste and landfill failure in Shenzhen, China. , 2017, Waste management.

[39]  Mohamed Osmani,et al.  Circular economy in construction: current awareness, challenges and enablers , 2017 .

[40]  Nancy Bocken,et al.  Circular Cities: Mapping Six Cities in Transition , 2017 .

[41]  E. Aboagye-Nimo,et al.  Stakeholders’ role in improving Ghana’s construction safety , 2017 .

[42]  Franklin Wiafe,et al.  Factors Affecting the Implementation of Sustainable Construction in Ghana: the Architect’s Perspective , 2017 .

[43]  Zeshui Xu,et al.  Hesitant Fuzzy Decision Making Methodologies and Applications , 2016 .

[44]  Isaac Doku,et al.  The Perception of Investors on Real Estate Sustainability in Ghana , 2016 .

[45]  J. Rezaei Best-worst multi-criteria decision-making method , 2015 .

[46]  Yi-Ming Wei,et al.  China's energy consumption in the building sector: A life cycle approach , 2015 .

[47]  Kofi Agyekum,et al.  Perceptions on Barriers to the Use of Burnt Clay Bricks for Housing Construction , 2014 .

[48]  J. Naustdalslid Circular economy in China – the environmental dimension of the harmonious society , 2014 .

[49]  Samuel Kwame Ansah,et al.  Impacts of construction activities on the environment : the case of Ghana , 2014 .

[50]  Susan Dzifa Djokoto,et al.  Barriers to Sustainable Construction in the Ghanaian Construction Industry: Consultants Perspectives , 2014 .

[51]  Denis Ong,et al.  Construction and demolition , 2011 .

[52]  Joshua Ayarkwa,et al.  Exploring Waste Minimization Measures in the Ghanaian Construction Industry , 2011 .

[53]  Taho Yang,et al.  The use of grey relational analysis in solving multiple attribute decision-making problems , 2008, Comput. Ind. Eng..

[54]  Vivian W. Y Tam,et al.  A checklist for assessing sustainability performance of construction projects , 2007 .

[55]  Charity Osei-Amponsah,et al.  Analysis of the causality links between the growth of the construction industry and the growth of the macro‐economy in Ghana , 2007 .

[56]  K. Ringen,et al.  The Construction Industry , 2006, Annals of the New York Academy of Sciences.

[57]  Timothy Adu Gyamfi,et al.  Exploration of Architect perception on energy -efficient design decisions for Ghanaian building industry , 2017 .

[58]  Yong Wang,et al.  Development of a hybrid model to predict construction and demolition waste: China as a case study. , 2017, Waste management.

[59]  I. S. Jawahir,et al.  Technological Elements of Circular Economy and the Principles of 6R-Based Closed-loop Material Flow in Sustainable Manufacturing , 2016 .

[60]  Clinton Aigbavboa,et al.  Barriers to successful implementation of sustainable construction in the Ghanaian construction industry , 2015 .

[61]  Jafar Rezaei,et al.  A Systematic Review of Multi-criteria Decision-making Applications in Reverse Logistics , 2015 .

[62]  William Gyadu-Asiedu,et al.  Sustainable Construction Implementation In Ghana: Focusing On Awareness And Challenges , 2015 .

[63]  I. S. Jawahir,et al.  1 On improving the product sustainability of metallic automotive components by using the total life-cycle approach and the 6 R methodology , 2013 .

[64]  Ann T W Yu,et al.  Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong. , 2013, Waste management.

[65]  Lei Zhang,et al.  Life cycle assessment of the air emissions during building construction process: A case study in Hong Kong , 2013 .

[66]  I. S. Jawahir,et al.  6.1 On improving the product sustainability of metallic automotive components by using the total life-cycle approach and the 6R methodology , 2013 .

[67]  J. Dadzie,et al.  Performance of consultants on government projects in ghana: Client and contractor pespective , 2012 .

[68]  Lesley Stone,et al.  Cleaner production in New Zealand: taking stock , 2007 .