A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
暂无分享,去创建一个
Zhen Zhou | Pengyu Yan | Ada Che | A. Che | Pengyu Yan | Zhen Zhou
[1] Yun Jiang,et al. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution , 2002 .
[2] Chengbin Chu,et al. Cyclic scheduling of a hoist with time window constraints , 1998, IEEE Trans. Robotics Autom..
[3] W. Ng. A branch and bound algorithm for hoist scheduling of a circuit board production line , 1996 .
[4] Zhen Zhou,et al. Multi-degree cyclic hoist scheduling with time window constraints , 2011 .
[5] L. Lei,et al. DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE , 1994 .
[6] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[7] Lei Lei,et al. Minimizing the fleet size with dependent time-window and single-track constraints , 1993, Oper. Res. Lett..
[8] Feng Chu,et al. Multicyclic hoist scheduling with constant processing times , 2002, IEEE Trans. Robotics Autom..
[9] Ada Che,et al. Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm , 2008 .
[10] Chengbin Chu,et al. Cyclic hoist scheduling in large real-life electroplating lines , 2007, OR Spectr..
[11] Eugene Levner,et al. Multiple-part cyclic hoist scheduling using a sieve method , 1999, IEEE Trans. Robotics Autom..
[12] Lei Lei,et al. Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints , 2001 .
[13] Vadim E. Levit,et al. An improved algorithm for cyclic flowshop scheduling in a robotic cell , 1997 .
[14] Yuehwern Yih,et al. An algorithm for hoist scheduling problems , 1994 .
[15] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[16] Guoqing Zhang,et al. Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence , 2003, IEEE Trans. Robotics Autom..
[17] Zelda B. Zabinsky,et al. An algorithm for scheduling a chemical processing tank line , 1993 .
[18] Lixin Tang,et al. The coordination of transportation and batching scheduling , 2009 .
[19] Lixin Tang,et al. Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration , 2009 .