Lot streaming and scheduling multiple products in two-machine no-wait flowshops
暂无分享,去创建一个
[1] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[2] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[3] S. Goyal. Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” , 1976 .
[4] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[5] Hans Röck,et al. The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.
[6] Eugene L. Lawler,et al. The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization , 1985 .
[7] William G. Truscott,et al. Scheduling production activities in multi-stage batch manufacturing systems , 1985 .
[8] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .
[9] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[10] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[11] Gilbert Laporte,et al. New Insertion and Postoptimization Procedures for the Traveling Salesman Problem , 1992, Oper. Res..
[12] Kenneth R. Baker,et al. A comparative study of lot streaming procedures , 1993 .
[13] C. Sriskandarajah,et al. Two-machine group scheduling problem with blocking and anticipatory setups , 1993 .
[14] G. Steiner,et al. BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .
[15] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[16] Chris N. Potts,et al. Lot streaming in three-stage production processes , 1994 .
[17] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[18] Kenneth R. Baker,et al. Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..
[19] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[20] Stéphane Dauzère-Pérès,et al. Lot Streaming in Job-Shop Scheduling , 1997, Oper. Res..