Performance analysis of a composite work cell with a gantry and system reconfiguration

Abstract In this paper, a reconfigurable composite work cell with a gantry that is in charge of moving materials/parts from one machine to another is considered. To diagnose the work cell performance, demand dissatisfaction is proposed to evaluate the discrepancy between market demand and system output. Demand dissatisfaction consists of the effect of work cell capacity as well as the impact of disruption events. Production loss attribution of each machine is identified as machine’s impact on the work cell performance. A reconfiguration strategy is proposed to satisfy possible demand changes and serve the purpose of energy saving. A gantry work cell for composite lay-up process is used for a case study, by which the performance diagnostic methodology and reconfiguration strategy are demonstrated.

[1]  Mohammed El-Beheiry,et al.  Scheduling and sequencing in four machines robotic cell: Application of genetic algorithm and enumeration techniques , 2013 .

[2]  Derek Yip-Hoi,et al.  An approach to scalability and line balancing for reconfigurable manufacturing systems , 2001 .

[3]  Stanley B. Gershwin,et al.  An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers , 2007 .

[4]  Jingshan Li Modeling and analysis of manufacturing systems with parallel lines , 2004, IEEE Transactions on Automatic Control.

[5]  Ahmed M. Deif,et al.  A control approach to explore the dynamics of capacity scalability in reconfigurable manufacturing systems , 2006 .

[6]  Qi Su,et al.  Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems , 1996, IEEE Trans. Robotics Autom..

[7]  Kouroush Jenab,et al.  Productivity analysis in a robotic cell , 2009 .

[8]  Stephan Biller,et al.  Simulation study of a bottleneck-based dispatching policy for a maintenance workforce , 2010 .

[9]  Stanley B. Gershwin,et al.  A decomposition method for analyzing inhomogeneous assembly/disassembly systems , 2000, Ann. Oper. Res..

[10]  Yushin Hong,et al.  The analysis of an unreliable two-machine production line with random processing times , 1993 .

[11]  Abderrahmane Bensmaine,et al.  A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems , 2014 .

[12]  Lifeng Xi,et al.  An efficient analytical method for performance evaluation of transfer lines with unreliable machines and finite transfer-delay buffers , 2013 .

[13]  Stephan Biller,et al.  Real time production improvement through bottleneck control , 2009 .

[14]  Jorge Arinez,et al.  Opportunity Window for Energy Saving and Maintenance in Stochastic Production Systems , 2016 .

[15]  Jing Zou,et al.  Production System Performance Identification Using Sensor Data , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[16]  F. Jovane,et al.  Reconfigurable Manufacturing Systems , 1999 .

[17]  Jingshan Li,et al.  Performance analysis of production systems with rework loops , 2004 .

[18]  Andrea Matta,et al.  Analysis of two-machine lines with multiple failure modes , 2002 .

[19]  Lin Li,et al.  Data driven bottleneck detection of manufacturing systems , 2009 .

[20]  Yves Crama,et al.  Cyclic Scheduling of Identical Parts in a Robotic Cell , 1997, Oper. Res..

[21]  Stanley B. Gershwin,et al.  A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines , 2013, Ann. Oper. Res..

[22]  Napsiah Ismail,et al.  An improved algorithm for layout design in cellular manufacturing systems , 2009 .

[23]  Jingshan Li,et al.  Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems , 2005, IEEE Transactions on Automation Science and Engineering.

[24]  Semyon M. Meerkov,et al.  DT-bottlenecks in serial production lines: theory and application , 2000, IEEE Trans. Robotics Autom..

[25]  Atabak Elmi,et al.  Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot , 2014, Int. J. Comput. Integr. Manuf..

[26]  Yoram Koren,et al.  Scalability planning for reconfigurable manufacturing systems , 2012 .

[27]  Stephan Biller,et al.  Transient Analysis of Downtimes and Bottleneck Dynamics in Serial Manufacturing Systems , 2010 .

[28]  Lin Li,et al.  Throughput Bottleneck Prediction of Manufacturing Systems Using Time Series Analysis , 2011 .

[29]  Stephan Biller,et al.  The Costs of Downtime Incidents in Serial Multistage Manufacturing Systems , 2012 .

[30]  Kang G. Shin,et al.  Scheduling job operations in an automatic assembly line , 1990, Proceedings., IEEE International Conference on Robotics and Automation.

[31]  Hichem Kamoun,et al.  Sequencing and scheduling in a three-machine robotic cell , 2012 .