The effects of building information modeling on construction site productivity

Title of Document: THE EFFECTS OF BUILDING INFORMATION MODELING ON CONSTRUCTION SITE PRODUCTIVITY Douglas E. Chelson, Doctor of Philosophy, 2010 Directed By: Professor Miroslaw J. Skibniewski, Ph.D., A. James Clark Chair Civil & Environmental Engineering Construction experiences low productivity compared to other industries, largely attributed to poor planning and communication. Building Information Modeling (BIM) is a process that is used to resolve these problems by simulating physical space and expressing design intent graphically, providing a clearer image of design conflicts or constructability issues so that they are resolved before construction begins. Productivity rates increase as BIM practices are implemented because rework and idle time are reduced for laborers. Case studies of projects utilizing BIM indicate field productivity gains from 5 to 40%, depending on how the process is managed. Although the amount of savings is guarded closely by those who measure and track the changes in their productivity rates and unknown to many contractors, there are indicators that reveal increased productivity. Key indicators of increased productivity are RFI reduction, amount of rework, schedule compliance, and change orders due to plan conflicts. Each of these affect the various stakeholders of a project to different degrees but the overall effect is a net savings for the owner ranging from a few percent for competitive bid projects to over 10% for integrated projects. BIM-enabled projects have 10% of the RFI that a typical project would have so that contractors realize an average savings of 9% in management time. Reduction of rework and idle time due to site conflicts savings for trade contractors are on the order of 9% of project costs. The abilities to prefabricate and automate site processes are also significant advantages of BIM usage experienced by trade contractors. The most significant savings are attributed to the clash detection process which eliminates conflicts in the field. These findings show that the strongest determinants of success on BIM projects in terms of site productivity are human factors rather than technical. THE EFFECTS OF BUILDING INFORMATION MODELING ON CONSTRUCTION SITE PRODUCTIVITY

[1]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[2]  Richard T. Lubben Just-in-time manufacturing : an aggressive manufacturing strategy , 1988 .

[3]  Peter E.D. Love,et al.  Auditing the indirect consequences of rework in construction: a case based approach , 2002 .

[4]  Kenneth H. Rose Book Review: Effective Project Management: Traditional, Agile, Extreme, Fifth Edition , 2010 .

[5]  Christopher Powell Responding to marginalisation , 1997, Architectural Research Quarterly.

[6]  David I. Blockley,et al.  Safety - Behaviour and Culture in Construction , 1995 .

[7]  Kevin J. Duggan Lean Production Simplified : A Plain-Language Guide to the World's Most Powerful Production System , 2007 .

[8]  A Caruba,et al.  Do it right the first time! , 1982, Nursing homes.

[9]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[10]  Taiichi Ohno,et al.  The Toyota Production System , 1984 .

[11]  Jeffrey M Weinberg Quality pays. , 2007, Cutis.

[12]  Roger W. Schmenner Production/Operations Management: From the Inside Out , 1993 .

[13]  Ali Jaafari,et al.  Human Factors in the Australian Construction Industry: Towards Total Quality Management , 1996 .

[14]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[15]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[16]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[17]  Iris D. Tommelein,et al.  Work Structuring to Achieve Integrated Product-Process Design , 2004 .

[18]  Z. Irani,et al.  Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices , 2003 .

[19]  H. Ashcraft Building Information Modeling : A Framework for Collaboration , 2008 .

[20]  John M. Silvester,et al.  The Social Life of Information: Brown, J.S., & Duguid, P. (2000). Cambridge, MA: Harvard Business School Publishing. ISBN 0-87584-762-5. 320 pages , 2000, Internet High. Educ..

[21]  Glenn Ballard Improving Work Flow Reliability , 1999 .

[22]  D. P. Breidenbach Life cycle cost analysis , 1989, Proceedings of the IEEE National Aerospace and Electronics Conference.

[23]  Kelly Strong Performance Effectiveness of Design-Build, Lane Rental, and A + B Contracting Techniques , 2006 .

[24]  Peter E.D. Love,et al.  Co-operative benchmarking: a tool for partnering excellence in construction , 2001 .

[25]  H Kemble Stokes,et al.  An Examination of the Productivity Decline in the Construction Industry , 1981 .

[26]  Brad Hardin,et al.  BIM and Construction Management: Proven Tools, Methods, and Workflows , 2009 .

[27]  Vishal Singh,et al.  Industry perception of BIM adoption in design sector , 2008 .

[28]  Rafael Sacks,et al.  Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms , 2008, J. Inf. Technol. Constr..

[29]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[30]  R. Dorf,et al.  The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.

[31]  John L. Dettbarn,et al.  Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry. , 2004 .

[32]  Louis Edward Alfeld Construction Productivity: On-Site Measurement and Management , 1989 .

[33]  Kathryn Graziano The innovator's dilemma: When new technologies cause great firms to fail , 1998 .

[34]  E. Larson,et al.  Project Management: The Managerial Process , 2002 .

[35]  Yong-Woo Kim,et al.  Is the Earned-Value Method an Enemy of Work Flow? , 2000 .

[36]  Geoff Rounce Quality, waste and cost considerations in architectural building design management , 1998 .

[37]  Jin Woo Jang,et al.  USING THE KANBAN FOR CONSTRUCTION PRODUCTION AND SAFETY CONTROL , 2007 .

[38]  Willem Kymmell,et al.  Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations , 2007 .

[39]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[40]  Eddy Krygiel,et al.  Green BIM: Successful Sustainable Design with Building Information Modeling , 2008 .

[41]  Alexander Laufer Simultaneous Management: Managing Projects in a Dynamic Environment , 1996 .

[42]  B. Schneirdeman,et al.  Designing the User Interface: Strategies for Effective Human-Computer Interaction , 1998 .

[43]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[44]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[45]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[46]  Norman P. Bresky,et al.  Tools and Methods for the Improvement of Quality , 1990 .

[47]  Adedeji Badiru Comprehensive project management , 2008 .

[48]  Alan Heap Improving site productivity in the construction industry , 1987 .

[49]  Edward R. Fisk Construction Project Administration , 1978 .

[50]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[51]  Dana K. Smith,et al.  Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers , 2009 .

[52]  Carl-Henric Nilsson,et al.  Do quality systems really make a difference? , 2001 .

[53]  Steve Bell,et al.  Lean Enterprise Systems: Using IT for Continuous Improvement , 2005 .

[54]  Leon Rogers Basic Construction Management: The Superintendent's Job , 1990 .

[55]  P. Williams Practice management. , 2005, The Alpha omegan.

[56]  Rafael Sacks,et al.  Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .