A Co-Scheduling Problem of Ship Lift and Ship Lock at the Three Gorges Dam

Due to the unprecedentedly increasing demands of waterway transportation on the Yangtze River during the latest years, traffic congestion at the Three Gorges Dam (TGD) has becoming a serious problem. In busiest seasons, a vessel may need to wait up to 3 days for passing the TGD via the ship lift or the five-stage ship lock. In order to improve the navigation efficiency and the utilization of passing facilities, a co-scheduling problem of ship lift and ship lock at the TGD is modeled in this paper. Besides, the improvement on effectiveness, safety and fairness of the navigation scheduling by introducing the ship lift is taken into account. The mathematical model proposed is, by nature, a two-stage problem, where the first-stage variables determine the assignments of passing facilities and the second-stage variables schedule the vessels. In order to solve the proposed mathematical model, a hybrid metaheuristic algorithm is used at the first stage to determine the allocation of vessels to different passing facilities and to different lockage through the maximization of facility utilization rate. The second-stage problem is then solved by CPLEX. The proposed mathematical model and algorithm are validated through a set of numerical experiments and a case study. The results show both the navigation efficiency and the utilization of passing facilities can be improved by using the proposed methods.

[1]  Jens Hermans,et al.  Optimization of inland shipping , 2014, J. Sched..

[2]  Yanbin Yuan,et al.  Co-scheduling of lock and water-land transshipment for ships passing the dam , 2016, Appl. Soft Comput..

[3]  Liang Qi,et al.  Modified cuckoo search algorithm to solve economic power dispatch optimization problems , 2018, IEEE/CAA Journal of Automatica Sinica.

[4]  Xiaohui Yuan,et al.  Co-Evolutionary Strategy Algorithm to the Lockage Scheduling of the Three Gorges Project , 2008, 2008 IEEE Pacific-Asia Workshop on Computational Intelligence and Industrial Application.

[5]  Patrick De Causmaecker,et al.  A Combinatorial Benders' decomposition for the lock scheduling problem , 2015, Comput. Oper. Res..

[6]  Georgios Dounias,et al.  A hybrid particle swarm optimization algorithm for the vehicle routing problem , 2010, Eng. Appl. Artif. Intell..

[7]  Zhiyuan Wu,et al.  Quantum rotation gate in quantum-inspired evolutionary algorithm: A review, analysis and comparison study , 2018, Swarm Evol. Comput..

[8]  Ling Wang,et al.  A memetic algorithm with competition for the capacitated green vehicle routing problem , 2019, IEEE/CAA Journal of Automatica Sinica.

[9]  Fabio D'Andreagiovanni,et al.  A fast hybrid primal heuristic for multiband robust capacitated network design with multiple time periods , 2014, Appl. Soft Comput..

[10]  Xin Yao,et al.  Evolutionary programming made faster , 1999, IEEE Trans. Evol. Comput..

[11]  MengChu Zhou,et al.  Disassembly Sequence Optimization for Large-Scale Products With Multiresource Constraints Using Scatter Search and Petri Nets , 2016, IEEE Transactions on Cybernetics.

[12]  Ning Wang,et al.  Fuzzy control system design and stability analysis for ship lift feedback fin stabilizer , 2008, 2008 7th World Congress on Intelligent Control and Automation.

[13]  Frits C. R. Spieksma,et al.  The generalized lock scheduling problem: An exact approach , 2014 .

[14]  Frits C. R. Spieksma,et al.  Exact and heuristic methods for placing ships in locks , 2014, Eur. J. Oper. Res..

[15]  Xiaoping Wang,et al.  Genetic Algorithm and Tabu Search Hybrid Algorithm to Co-scheduling Model of Three Gorges-Gezhou Dam , 2009, ISNN.

[16]  David Pisinger,et al.  The liner shipping berth scheduling problem with transit times , 2016 .

[17]  Roberto Montemanni,et al.  Coupling ant colony systems with strong local searches , 2012, Eur. J. Oper. Res..

[18]  Zhenghua Chen,et al.  A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems , 2019, IEEE/CAA Journal of Automatica Sinica.

[19]  Rong Su,et al.  Decomposition methods for manufacturing system scheduling: a survey , 2018, IEEE/CAA Journal of Automatica Sinica.

[20]  L. Suo,et al.  6.07 – The Three Gorges Project in China , 2012 .

[21]  Xiaohui Yuan,et al.  Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA-II , 2020, Int. Trans. Oper. Res..

[22]  Xiaobin Wang,et al.  An analysis on convergence of data-driven approach to ship lock scheduling , 2013, Math. Comput. Simul..

[23]  Hossein Nezamabadi-pour,et al.  GSA: A Gravitational Search Algorithm , 2009, Inf. Sci..

[24]  Graham Kendall,et al.  A New Placement Heuristic for the Orthogonal Stock-Cutting Problem , 2004, Oper. Res..

[25]  Hossein Nezamabadi-pour,et al.  A quantum-inspired gravitational search algorithm for binary encoded optimization problems , 2015, Eng. Appl. Artif. Intell..

[26]  Xiaopan Zhang,et al.  Series queuing network scheduling approach to co-scheduling model of three Gorges-Gezhou dam , 2010, J. Syst. Sci. Complex..

[27]  Emanuel Falkenauer,et al.  A hybrid grouping genetic algorithm for bin packing , 1996, J. Heuristics.

[28]  P. Benioff The computer as a physical system: A microscopic quantum mechanical Hamiltonian model of computers as represented by Turing machines , 1980 .

[29]  Yanbin Yuan,et al.  A Hybrid Intelligent Approach for Co-Scheduling of Cascaded Locks With Multiple Chambers , 2019, IEEE Transactions on Cybernetics.

[30]  Hao Yu,et al.  An Improved Mathematical Model for Green Lock Scheduling Problem of the Three Gorges Dam , 2019, Sustainability.

[31]  Yanbin Yuan,et al.  Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project , 2008, Comput. Math. Appl..

[32]  Daniele Vigo,et al.  Recent advances on two-dimensional bin packing problems , 2002, Discret. Appl. Math..

[33]  Yanbin Yuan,et al.  Orthogonal Design-Based NSGA-III for the Optimal Lockage Co-Scheduling Problem , 2017, IEEE Transactions on Intelligent Transportation Systems.

[34]  Archil Avaliani,et al.  Quantum Computers , 2004, ArXiv.

[35]  Christian Blum,et al.  Hybrid Metaheuristics: An Introduction , 2008, Hybrid Metaheuristics.

[36]  Robert M. Nauss,et al.  Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock , 2008, Eur. J. Oper. Res..

[37]  Hossein Nezamabadi-pour,et al.  A quantum inspired gravitational search algorithm for numerical function optimization , 2014, Inf. Sci..

[38]  Frits C. R. Spieksma,et al.  The Lockmaster's Problem , 2011, Eur. J. Oper. Res..

[39]  Jong-Hwan Kim,et al.  Quantum-inspired evolutionary algorithm for a class of combinatorial optimization , 2002, IEEE Trans. Evol. Comput..

[40]  MengChu Zhou,et al.  Optimizing Hospital Emergency Department Layout via Multiobjective Tabu Search , 2019, IEEE Transactions on Automation Science and Engineering.

[41]  Xiaohui Yuan,et al.  The rolling horizon procedure on deterministic lockage co-scheduling to the two dams of the Three Gorges Project , 2010, Kybernetes.

[42]  Yanbin Yuan,et al.  Lockage scheduling of Three Gorges-Gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies , 2015, Appl. Math. Comput..

[43]  Christian Blum,et al.  Hybrid Metaheuristics, An Emerging Approach to Optimization , 2008, Hybrid Metaheuristics.

[44]  Hossein Nezamabadi-pour,et al.  A comprehensive survey on gravitational search algorithm , 2018, Swarm Evol. Comput..

[45]  Eduardo Lalla-Ruiz,et al.  The waterway ship scheduling problem , 2016 .

[46]  Manuel Laguna,et al.  Tabu Search , 1997 .

[47]  Jiuping Xu,et al.  Applying bi-random MODM model to navigation coordinated scheduling: a case study of Three Gorges Project , 2013 .

[48]  Frits C. R. Spieksma,et al.  Mathematical programming models for lock scheduling with an emission objective , 2016, Eur. J. Oper. Res..

[49]  Patrick De Causmaecker,et al.  An improved best-fit heuristic for the orthogonal strip packing problem , 2013, Int. Trans. Oper. Res..

[50]  Yanbin Yuan,et al.  A Binary Borg-Based Heuristic Method for Solving a Multi-Objective Lock and Transshipment Co-Scheduling Problem , 2019, IEEE Transactions on Intelligent Transportation Systems.

[51]  MengChu Zhou,et al.  Decomposition Method for New Single-Machine Scheduling Problems From Steel Production Systems , 2020, IEEE Transactions on Automation Science and Engineering.