On the polyhedral structure of two‐level lot‐sizing problems with supplier selection
暂无分享,去创建一个
[1] Laurence A. Wolsey,et al. Lot-size models with backlogging: Strong reformulations and cutting planes , 1988, Math. Program..
[2] Laurence A. Wolsey,et al. Relaxations for two-level multi-item lot-sizing problems , 2014, Math. Program..
[3] Laurence A. Wolsey,et al. Uncapacitated lot-sizing: The convex hull of solutions , 1984 .
[4] Diego Klabjan,et al. A polyhedral study of lot-sizing with supplier selection , 2012, Discret. Optim..
[5] Alper Atamt. LOT SIZING WITH INVENTORY BOUNDS AND FIXED COSTS: POLYHEDRAL STUDY AND COMPUTATION , 2004 .
[6] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[7] S. David Wu,et al. Multi-Item, Multi-Facility Supply Chain Planning: Models, Complexities, and Algorithms , 2004, Comput. Optim. Appl..
[8] Joseph Geunes,et al. Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning , 2000, Manuf. Serv. Oper. Manag..
[9] Yves Pochet,et al. Uncapacitated lot sizing with backlogging: the convex hull , 2007, Math. Program..
[10] Alper Atamtürk,et al. A study of the lot-sizing polytope , 2004, Math. Program..
[11] Hande Yaman,et al. A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands , 2012, Oper. Res..
[12] Yongpei Guan,et al. On formulations of the stochastic uncapacitated lot-sizing problem , 2006, Oper. Res. Lett..
[13] Laurence A. Wolsey,et al. Uncapacitated two-level lot-sizing , 2010, Oper. Res. Lett..
[14] Yongpei Guan,et al. A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem , 2006, Math. Program..
[15] Chung-Yee Lee,et al. Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems , 2000 .
[16] J. Krarup,et al. Plant location, Set Covering and Economic Lot Size: An 0 (mn)-Algorithm for Structured Problems , 1977 .
[17] Laurence A. Wolsey,et al. Lot-Sizing with Constant Batches: Formulation and Valid Inequalities , 1993, Math. Oper. Res..
[18] Saif Benjaafar,et al. Multitask and Multistage Production Planning and Scheduling for Process Industries , 2008, Oper. Res..