Design for assembly

In the ‘old days’ assembly methods were selected by engineers only after the product design had been completed, approved and authorized. As long as all the assembly work was manual, human assemblers could be expected to learn how to assemble even complicated products. There were some guidelines on how to plan the assembly method for effective manual assembly. When parts had to be designed for the non-forgiving automatic assembly machines, and later for robotic assembly (whose cost increases exponentially the more forgiving it is expected to be), designers realized the need to ‘design ahead’.

[1]  Shimon Y. Nof,et al.  Design method of robot kitting system for flexible assemble , 1991, Robotics Auton. Syst..

[2]  Mohan V. Tatikonda,et al.  Adoption and implementation of group technology classification and coding systems : insights from seven case studies , 1992 .

[3]  K. G. Swift,et al.  Design for assembly , 1983 .

[4]  Chun Liu,et al.  Establishment of functional relationships between product components in assembly database , 1988 .

[5]  Shimon Y. Nof,et al.  Collaborative coordination control (CCC) of distributed multimachine manufacturing , 1992 .

[6]  Sabah U. Randhawa,et al.  Wavesolder assistant: an expert system to aid troubleshooting of the wave soldering process , 1986 .

[7]  Yuehwern Yih,et al.  A collision-free sequencing algorithm for PWB assembly , 1991 .

[8]  G. Seliger,et al.  Computer Aided Planning of Assembly Systems , 1990 .

[9]  Kunwoo Lee,et al.  An assembly modelling system for dynamic and kinematic analysis , 1989 .

[10]  C. S. George Lee,et al.  An automatic assembly planning system , 1990, Proceedings., IEEE International Conference on Robotics and Automation.

[11]  Shimon Y. Nof,et al.  Performance analysis of robotic kitting systems , 1989 .

[12]  Hong-Chao Zhang,et al.  Computer Aided Process Planning: the state-of-the-art survey , 1989 .

[13]  G. Boothroyd,et al.  Assembly Automation and Product Design , 1991 .

[14]  Jong-Shin Liau,et al.  An expert process planning system for electronics PCB assembly , 1993 .

[15]  Inyong Ham,et al.  Computer-Aided Process Planning: The Present and the Future , 1988 .

[16]  H. J. Warnecke,et al.  Industrial Robots: Application Experience , 1982 .

[17]  A.E.K. Holbrook,et al.  DFA as a primary process decreases design deficiencies , 1988 .

[18]  Delmar W. Karger,et al.  Engineered work measurement: The principles, techniques, and data of methods-time measurement, modern time and motion study, and related applications engineering data , 1977 .

[19]  Ying-Chin Ho,et al.  A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system , 1994 .

[20]  Arthur C. Sanderson,et al.  Representations of mechanical assembly sequences , 1991, IEEE Trans. Robotics Autom..

[21]  Shimon Y. Nof,et al.  Integration of simulation and emulation with graphical design for the development of cell control programs , 1995 .

[22]  William Victor Tipping,et al.  An introduction to mechanical assembly , 1969 .

[23]  Shimon Y. Nof,et al.  Operational characteristics of multi-robot systems with cooperation , 1989 .

[24]  E. M. Dar-El,et al.  Must---A Multiple Solutions Technique for Balancing Single Model Assembly Lines , 1979 .

[25]  Gürsel A. Süer,et al.  A knowledge-based system for selection of resource allocation rules and algorithms , 1994 .

[26]  Shimon Y. Nof,et al.  Performance time models for robot point operations , 1983 .

[27]  Shimon Y. Nof,et al.  Tool integration for collaborative design of manufacturing cells , 1995 .

[28]  Gavriel Salvendy,et al.  Effective Utilization of Industrial Robots—A Job and Skills Analysis Approach , 1980 .

[29]  Shimon Y. Nof,et al.  Coordination of Robots Sharing Assembly Tasks , 1985 .

[30]  Shimon Y. Nof,et al.  Cooperation Requirement Planning for Multiprocessors , 1994 .

[31]  Thomas L. DeFazio,et al.  Simplified generation of all mechanical assembly sequences , 1987, IEEE Journal on Robotics and Automation.

[32]  Jack Arabian Computer Integrated Electronics Manufacturing and Testing , 1989 .

[33]  Siegfried Behrendt,et al.  Life Cycle Design , 1997 .

[34]  C. L. Philip Chen,et al.  An integration of neural network and rule-based systems for design and planning of mechanical assemblies , 1993, IEEE Trans. Syst. Man Cybern..

[35]  W. Eversheim,et al.  A Key Issue in Product Life Cycle: Disassembly , 1993 .

[36]  G. Duelen,et al.  Robot calibration—Method and results , 1991 .

[37]  H. J. Warnecke,et al.  Assembly by Industrial Robots with CAD/CAM and Vision Control Periphery , 1989 .

[38]  Tien-Chien Chang,et al.  A rule based system for printed wiring assembly process planning , 1987 .

[39]  N. S. Ong,et al.  Activity-based cost tables to support wire harness design , 1993 .

[40]  H. J. Warnecke,et al.  Design for Assembly — Part of the Design Process , 1988 .

[41]  Shimon Y. Nof,et al.  Modelling the performance of a mobile robot with RTM , 1991 .

[42]  Avraham Shtub,et al.  Increasing efficiency of assembly lines through computer integration, dynamic balancing and wage incentive , 1993 .

[43]  J. Naft NEUROPT: neurocomputing for multiobjective design optimization for printed circuit board component placement , 1989, International 1989 Joint Conference on Neural Networks.

[44]  A. Kriwet,et al.  Disassembly-Oriented Assessment Methodology to Support Design for Recycling , 1994 .

[45]  Sik Oh Jhong,et al.  A constraint network approach to design for assembly , 1995 .

[46]  H. Van Brussel,et al.  Planning and Scheduling of Assembly Systems , 1990 .

[47]  S. Y. Nof,et al.  The Impact of Advances in Information Technology on Interactive Robotics , 1989 .

[48]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[49]  Pradeep K. Khosla,et al.  Determining the assembly sequence from a 3-D model☆ , 1989 .

[50]  Bartholomew O. Nnaji,et al.  A schema for CAD-based robot assembly task planning for CSG-modeled objects , 1988 .

[51]  D. Dutta,et al.  Automatic Disassembly and Total Ordering in Three Dimensions , 1991 .

[52]  Shimon Y. Nof,et al.  Cooperation requirement planning for multi-robot assembly cells , 1993 .

[53]  C A Chang,et al.  A time buffer method for multi-arm operational planning , 1986 .

[54]  Tadashi Nagata,et al.  Multirobot plan generation in a continuous domain: planning by use of plan graph and avoiding collisions among robots , 1988, IEEE J. Robotics Autom..

[55]  Yael Edan,et al.  Motion economy analysis for robotic kitting tasks , 1995 .

[56]  Shimon Y. Nof,et al.  A game-theoretic approach for co-operation control in multi-machine workstations , 1990 .

[57]  Robin J. Popplestone,et al.  RAPT, A Language for Describing Assemblies , 1978 .

[58]  Yukinori Kakazu Integration of CAD/CAM and robot. , 1987 .

[59]  Andrew B. Whinston,et al.  Designing Collaborative Systems to Support Reactive Problem-Solving in Manufacturing , 1994 .

[60]  Alain Delchambre,et al.  Computer-aided Assembly Planning , 1992 .

[61]  A. Kriwet,et al.  Integration of Recycling Considerations Into Product Design — A System Approach , 1994 .

[62]  Tomás Lozano-Pérez,et al.  A Geometric Modeling System for Automated Mechanical Assembly , 1980, IBM J. Res. Dev..

[63]  Shimon Y. Nof,et al.  Minimal precedence constraints for integrated assembly and execution planning , 1996, IEEE Trans. Robotics Autom..

[64]  Shimon Y. Nof,et al.  Automatic Generation of Assembly Constraints and Cooperation Task Planning , 1993 .

[65]  Shimon Y. Nof,et al.  Knowledge-based economic analysis of manufacturing systems , 1987 .