The Äspö pillar stability experiment: Part I—Experiment design

Abstract The Aspo pillar stability experiment was carried out to examine the failure process in a heterogeneous and fractured rock mass when subjected to coupled excavation-induced and thermal-induced stresses. The rock pillar was created by the excavation of two adjacent large-diameter boreholes. The pillar was loaded by a combination of excavation-induced stresses and heating of the surrounding rock by a rectangular heater pattern. The experiment was designed using the observation design method. The characterzation of the experiment volume showed that the experiment was located in a fractured water-bearing rock mass that was considered typical for the Aspo Hard Rock Laboratory (Aspo HRL) and for the Fenno-Scandinavian shield. Scoping calculations using two- and three-dimensional elastic stress analyses were carried out to reduce the uncertainty for the far-field in-situ stresses, establish the geometry for the access tunnel that would provide a elevated uniform stresses in the floor of the tunnel, and determine the optimum width of the pillar. It was concluded, based on the rock mass characteristics, that a 1 m-wide pillar formed by two 1.75 m diameter boreholes would meet the design objectives. Thermal modelling showed that thermally induced stresses in the pillar were adequate to elevate the pillar stresses above the stress magnitude required to initiate failure. Acoustic emission, displacement, and thermal monitoring systems were installed according to the experiment design without problems. No sensors were lost over the three month duration. After the experiment was completed, a laser scan of the pillar revealed the extent of the damaged pillar. The experiment commenced in January 2002 and was successfully completed in 2006.

[1]  Svensk Kärnbränslehantering Ab,et al.  Äspö Hard Rock Laboratory , 2006 .

[2]  Mikael Rinne,et al.  The On-Going Pillar Stability Experiment at the Äspö Hard Rock Laboratory, Sweden , 2004 .

[3]  E. T. Brown Rock characterization, testing & monitoring: ISRM suggested methods , 1981 .

[4]  E. T. Brown,et al.  Rock characterization testing and monitoring , 1981 .

[5]  Ming Cai,et al.  Generalized crack initiation and crack damage stress thresholds of brittle rock masses near underground excavations , 2004 .

[6]  N. A. Chandler,et al.  The progressive fracture of Lac du Bonnet granite , 1994 .

[7]  Håkan Stille,et al.  The Äspö Pillar Stability Experiment: Part II—Rock mass response to coupled excavation-induced and thermal-induced stresses , 2009 .

[8]  Finn Ouchterlony,et al.  Suggested methods for determining the fracture toughness of rock , 1988 .

[9]  J. B. Martino,et al.  Observations of brittle failure around a circular test tunnel , 1997 .

[10]  Erik Rybacki,et al.  Rock fracture toughness testing in Mode II—punch-through shear test , 2002 .

[11]  Ralph B. Peck,et al.  Advantages and Limitations of the Observational Method in Applied Soil Mechanics , 1969 .

[12]  T. R. Stacey A simple extension strain criterion for fracture of brittle rock , 1981 .

[13]  Olle Olsson,et al.  ZEDEX - a study of damage and disturbance from tunnel excavation by blasting and tunnel boring , 1997 .

[14]  J. Christer Andersson,et al.  Rock Mass Response to Coupled Mechanical Thermal Loading : Äspö Pillar Stability Experiment, Sweden , 2007 .