The Project Scheduling and Decision Mechanism Based on the Multi-Resource Leveling

Except for optimizing the schedule of a project, managers tend to enhance the utilization of resources and reduce the usage fluctuation of resources. This paper is to construct a multiresource leveling model as a decision mechanism and strategy for managers to control projects. In the multi-resource model, the resource leveling rate, RLr, is established and the smaller the leveling rate, the more resources’ usage of a project is leveled. The multiresource leveling model will help managers to control and manipulate the implementation and usage of different types of resources for better project scheduling. In this research, a global search to find the optimal solution was conducted and the software Visual Basic (VB) was used as the programming language to perform the searching. A practical example was provided to test and verify the model and obtained excellence performance result.

[1]  B. Yum,et al.  An uncertainty importance measure of activities in PERT networks , 1997 .

[2]  Dulcy M. Abraham,et al.  Resource Leveling of Linear Schedules Using Integer Linear Programming , 1998 .

[3]  Luca Maria Gambardella,et al.  Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..

[4]  Arno Sprecher,et al.  Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm , 1998, Eur. J. Oper. Res..

[5]  Francisco Ballestín,et al.  Justification and RCPSP: A technique that pays , 2005, Eur. J. Oper. Res..

[6]  J. D. Wiest,et al.  A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .

[7]  Miroslaw J. Skibniewski,et al.  Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach , 1999 .

[8]  Lucy C. Morse,et al.  A study of combining heuristics for scheduling projects with limited multiple resources , 1988 .

[9]  M. A. Younis,et al.  Optimal resource leveling of multi-resource projects , 1996 .

[10]  Liu Zhen-yuan,et al.  Heuristic algorithm for RCPSP with the objective of minimizing activities' cost , 2006 .

[11]  Edward W. Davis,et al.  Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .

[12]  Bajis M. Dodin,et al.  Approximating the Criticality Indices of the Activities in PERT Networks , 1985 .

[13]  James P. Clements,et al.  Successful Project Management , 1999 .

[14]  Rubén Ruiz,et al.  Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms , 2003, J. Oper. Res. Soc..

[15]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[16]  Mohammed A. Salem Hiyassat Modification of Minimum Moment Approach in Resource Leveling , 2000 .

[17]  Rainer Kolisch Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .

[18]  R. A. Bowman Efficient estimation of arc criticalities in stochastic activity networks , 1995 .

[19]  Edward W. Davis,et al.  A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .

[20]  James M. Antill,et al.  Critical path methods in construction practice , 1970 .

[21]  Hartmut Schmeck,et al.  Ant colony optimization for resource-constrained project scheduling , 2000, IEEE Trans. Evol. Comput..

[22]  Sou-Sen Leu,et al.  RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .

[23]  Klaus Neumann,et al.  Resource levelling for projects with schedule-dependent time windows , 1999, Eur. J. Oper. Res..

[24]  K. Bouleimen,et al.  A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version , 2003, Eur. J. Oper. Res..

[25]  Mohammed A. Salem Hiyassat,et al.  Applying Modified Minimum Moment Method to Multiple Resource Leveling , 2001 .

[26]  F. F. Boctor,et al.  Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .

[27]  Sönke Hartmann,et al.  Project Scheduling with Multiple Modes: A Genetic Algorithm , 2001, Ann. Oper. Res..

[28]  Rainer Kolisch,et al.  PSPLIB - a project scheduling problem library , 1996 .

[29]  Sou-Sen Leu,et al.  GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .

[30]  Grzegorz Waligóra,et al.  Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models , 2005, Eur. J. Oper. Res..

[31]  Said M. Easa,et al.  Resource Leveling in Construction by Optimization , 1989 .