Two Dimensional View of the Supply Chain on Construction Projects

Subcontracted trades undertake most of the physical construction work in construction projects. While many research projects have examined relationships between designers, developers and head contractors, there has been limited focus on detailed analysis of the relationships between subcontractors. Where relationships in the supply chain have been examined it has tended to be along the dimension of contractual relationships between subcontractors and their suppliers. This paper looks at the relationships between subcontractors in a second dimension where they build on each other’s work on the construction site, but are not contractually related, except through the head contractor. Initial investigations carried out during this research confirm that subcontractors focus on the head contractor as their primary customer, and hence attention on the following trade as a customer is minimal. This paper proposes a shift in focus, whereby a subcontractor (preceding trade) attempts to meet the product and service quality expectations of the trade that will be building upon that subcontractor’s work (following trade) leading to an improved project culture and better overall project quality outcomes. Tools were developed to increase the interaction between preceding and following trades and communicate product and service quality expectations. These were implemented on three construction sites in Sydney, Australia while three other sites were monitored for changes in customer focus and culture without any interventions. Results to date show that the tools developed have in fact increased focus on following trades resulting in improvements in overall project characteristics.

[1]  R. Thomas,et al.  THE IMPORTANCE OF PROJECT CULTURE IN ACHIEVING QUALITY OUTCOMES IN CONSTRUCTION , 2002 .

[2]  Tariq S. Abdelhamid,et al.  Six-Sigma in Lean Construction Systems: Opportunities and Challenges , 2003 .

[3]  Paul Humphreys,et al.  Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .

[4]  Alfred Wong,et al.  TQM in the construction industry in Hong Kong : A supply chain management perspective , 1997 .

[5]  S. Rowlinson,et al.  Quality relationships: partnering in the construction supply chain , 2000 .

[6]  Kalyan Vaidyanathan,et al.  CONSTRUCTION SUPPLY CHAIN MATURITY MODEL - CONCEPTUAL FRAMEWORK , 2007 .

[7]  Marton Marosszeky,et al.  Managing subcontractor supply chain for quality in construction , 2006 .

[8]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[9]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[10]  A. Dainty,et al.  New perspectives on construction supply chain integration , 2001 .

[11]  Marton Marosszeky,et al.  Improving Work Flow Reliability through Quality Control Mechanisms , 2005 .

[12]  Ossama Salem,et al.  Case Study: Lean Supply Chain Management in Construction Projects , 2008 .

[13]  Mohan M. Kumaraswamy,et al.  Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong constructors , 2001 .

[14]  Ruben Vrijhoef,et al.  Supply Chain Systems Engineering in Construction , 2007 .

[15]  Z. Irani,et al.  An e‐business model to support supply chain activities in construction , 2001 .