Installation method for conduits of contact rails of magnetism suspension track beams and positioning mold for conduits

The invention relates to the field of track construction and in particular relates to an installation method for conduits of contact rails of magnetism suspension track beams and a positioning mold for the conduits. The method comprises the following steps: manufacturing the positioning mold for the conduits of the contact rails of the track beams; positioning and perforating side formworks of beam boxes; fixing conduit groups; pouring concrete; and dismantling the formworks. The positioning mold for the conduits of the contact rails of the track beams is used for assembling and grouping to enable the parallel construction error of double conduit groups to meet the design requirement; conduit positioning holes formed in external steel formworks of the track beams can enable the deflection construction error of the conduits to meet the design requirement and can also avoid mortar leakage during concrete pouring; and T-shaped bolts on the conduits are connected with the external steel formworks through the positioning holes, the insides of the T-shaped bolts are connected with the conduits, and nuts are tightened to ensure that indentations are tightly jointed with the conduits, thereby eliminating the embedded construction error of the conduits and the oblique construction error of the double conduit groups, ensuring the construction quality of the conduits and ensuring the installation accuracy of the conduits.