A process framework for theoretically grounded prescriptive research in the project management field

Abstract Prescriptive research is at the heart of the project management (PM) disciplines. For decades, researchers and practitioners alike have been searching for methodological solutions to practical project management problems. Scheduling methods or risk management methodologies are just two examples. Despite this long tradition of prescriptive research, PM methods suffer from a number of problems, such as a lack of acceptance in practice, limited effectiveness, and unclear application scenarios. In this article, we identify a lack of empirical and theoretical foundations as one cause of these deficiencies. Based on a review of existing PM literature and a thorough analysis of other successful prescriptive disciplines, we develop a framework designed to serve as a guideline for theoretically grounded prescriptive PM research. The framework outlines how theories and empirical investigations can help build applicable and useful prescriptive research results. We illustrate our framework by applying it to the case of the critical chain method. Our contribution is twofold: our research results can foster the discourse on methodological support for prescriptive PM research; it may also help set up viable prescriptive research designs.

[1]  Kate E Decleene,et al.  Publication Manual of the American Psychological Association , 2011 .

[2]  Maurizio Bevilacqua,et al.  Critical chain and risk analysis applied to high-risk industry maintenance: A case study , 2009 .

[3]  Michael D. Myers,et al.  A Set of Principles for Conducting Critical Research in Information Systems , 2011, MIS Q..

[4]  Young Hoon Kwak,et al.  Analyzing project management research: Perspectives from top management journals , 2009 .

[5]  Peter W. G. Morris,et al.  Exploring the role of formal bodies of knowledge in defining a profession – The case of project management , 2006 .

[6]  Herman Steyn An investigation into the fundamentals of critical chain project scheduling , 2001 .

[7]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[8]  William H. Glick,et al.  Typologies As a Unique Form Of Theory Building: Toward Improved Understanding and Modeling , 1994 .

[9]  José Demisio Simões da Silva,et al.  An investigation of artificial neural networks based prediction systems in software project management , 2008, J. Syst. Softw..

[10]  Erik Demeulemeester,et al.  Critical Chain Project Scheduling: Do Not Oversimplify , 2002 .

[11]  N. F. M. Roozenburg,et al.  Product design: Fundamentals and methods , 1996 .

[12]  Linda S. Lotto Qualitative Data Analysis: A Sourcebook of New Methods , 1986 .

[13]  Aaron J. Shenhar,et al.  Project Management Research—The Challenge and Opportunity , 2007, IEEE Engineering Management Review.

[14]  Jonas Söderlund,et al.  Building theories of project management : Past research, questions for the future , 2004 .

[15]  L. Schauble,et al.  Design Experiments in Educational Research , 2003 .

[16]  Bashar Nuseibeh,et al.  Requirements engineering: a roadmap , 2000, ICSE '00.

[17]  E. Wittmann Mathematics education as a ‘design science’ , 1995 .

[18]  B. Guy Peters,et al.  From Social Theory to Policy Design , 1984, Journal of Public Policy.

[19]  Sönke Hartmann,et al.  Project Scheduling with Multiple Modes: A Genetic Algorithm , 2001, Ann. Oper. Res..

[20]  John Davies,et al.  The theory of constraints thinking processes: retrospect and prospect , 2008 .

[21]  Sydney A. Gregory,et al.  Design Method , 1965, Nature.

[22]  Rudy Hirschheim,et al.  Some Guidelines for the Critical Reviewing of Conceptual Papers , 2008, J. Assoc. Inf. Syst..

[23]  Concepción Maroto,et al.  A Robust Genetic Algorithm for Resource Allocation in Project Scheduling , 2001, Ann. Oper. Res..

[24]  Salvatore T. March,et al.  Design and natural science research on information technology , 1995, Decis. Support Syst..

[25]  Ashok Kochhar,et al.  A framework for the selection of best practices , 2000 .

[26]  Staffan Jacobsson,et al.  Innovation systems: analytical and methodological issues , 2002 .

[27]  Oliver Thomas,et al.  Understanding the Term Reference Model in Information Systems Research: History, Literature Analysis and Explanation , 2005, Business Process Management Workshops.

[28]  Bruce Hunter,et al.  Knowledge and Design , 1999 .

[29]  D L Sackett,et al.  On the need for evidence-based medicine. , 1995, Therapie.

[30]  Herbert A. Simon,et al.  The Sciences of the Artificial , 1970 .

[31]  Alan R. Hevner,et al.  Design Science in Information Systems Research , 2004, MIS Q..

[32]  Herman Steyn Project management applications of the theory of constraints beyond critical chain scheduling , 2002 .

[33]  Ario Ohsato,et al.  Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .

[34]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[35]  Daniel Andriessen,et al.  Making Sense of Intellectual Capital: Designing a Method for the Valuation of Intangibles , 2003 .

[36]  Dipanjan Banerjee,et al.  Understanding and identifying bias and confounding in the medical literature. , 2008, Southern medical journal.

[37]  Jonathan Eldredge,et al.  Evidence-based librarianship: the EBL process , 2006, Libr. Hi Tech.

[38]  Shirley Gregor,et al.  The Anatomy of a Design Theory , 2007, J. Assoc. Inf. Syst..

[39]  Fariborz Jolai,et al.  A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept , 2007, Eur. J. Oper. Res..

[40]  Omar El Sawy,et al.  Building an Information System Design Theory for Vigilant EIS , 1992, Inf. Syst. Res..

[41]  Brian Henderson-Sellers,et al.  The object-oriented systems life cycle , 1990, CACM.

[42]  Lynn Crawford,et al.  Senior management perceptions of project management competence , 2005 .

[43]  Yongyi Shou,et al.  Estimation of project buffers in critical chain project management , 2000, Proceedings of the 2000 IEEE International Conference on Management of Innovation and Technology. ICMIT 2000. 'Management in the 21st Century' (Cat. No.00EX457).

[44]  Vladimir Hubka,et al.  A scientific approach to engineering design , 1987 .

[45]  J. R. Turner,et al.  Project management: a profession based on knowledge or faith? , 1999 .

[46]  Johann Packendorff,et al.  INQUIRING INTO THE TEMPORARY ORGANIZATION: NEW DIRECTIONS FOR PROJECT MANAGEMENT RESEARCH , 1995 .

[47]  Michael Pidd,et al.  Computer Simulation in Management Science (3rd Edition) , 1998 .

[48]  Kam Jugdev,et al.  Through the Looking Glass: Examining Theory Development in Project Management with the Resource-Based View Lens , 2004 .

[49]  Pedro Maria Sanchez Neural-Risk Assessment System for Construction Projects , 2005 .

[50]  Lonnie R. Welch,et al.  A dynamic real-time benchmark for assessment of QoS and resource management technology , 1999, Proceedings of the Fifth IEEE Real-Time Technology and Applications Symposium.

[51]  B. Haynes,et al.  Barriers and bridges to evidence based clinical practice , 1998, BMJ.

[52]  Carla O'Dell,et al.  If Only We Knew What We Know: Identification and Transfer of Internal Best Practices , 1998 .

[53]  Svetlana. Cicmil,et al.  New Possibilities for Project Management Theory: A Critical Engagement , 2006 .

[54]  R. Yin Case Study Research: Design and Methods , 1984 .

[55]  James C. McElroy,et al.  A Typology of Attribution Leadership Research , 1982 .

[56]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[57]  R. Slavin Evidence-Based Education Policies: Transforming Educational Practice and Research , 2002 .

[58]  Avraham Shtub,et al.  Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives , 2004 .

[59]  Erik Demeulemeester,et al.  New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .

[60]  Sandeep Purao,et al.  Action Design Research , 2011, MIS Q..

[61]  Steffen Staab,et al.  What Is an Ontology? , 2009, Handbook on Ontologies.

[62]  Kalle Lyytinen,et al.  Design theory for dynamic complexity in information infrastructures: the case of building internet , 2010, J. Inf. Technol..

[63]  Walter O. Rom,et al.  An investigation of buffer sizing techniques in critical chain scheduling , 2006, Eur. J. Oper. Res..

[64]  D. Tranfield,et al.  Developing Design Propositions through Research Synthesis , 2008 .

[65]  A. Detsky,et al.  Evidence-based medicine. A new approach to teaching the practice of medicine. , 1992, JAMA.

[66]  Mary B. Hill,et al.  A Survey of College Faculty and Student Procrastination. , 1978 .

[67]  J. Pfeffer,et al.  Hard Facts, Dangerous Half-Truths, and Total Nonsense: Profiting from Evidence-based Management , 2006 .

[68]  Terry Williams,et al.  Assessing and moving on from the dominant project management discourse in the light of project overruns , 2005, IEEE Transactions on Engineering Management.

[69]  Stephen A. Webb,et al.  Some considerations on the validity of evidence-based practice in social work , 2001 .

[70]  Howard B. Lee,et al.  Foundations of Behavioral Research , 1973 .

[71]  Sherif Ali Mohtady Mohamed,et al.  Modelling project investment decisions under uncertainty using possibility theory , 2001 .

[72]  Jeff Cox,et al.  The Goal: A Process of Ongoing Improvement , 1984 .

[73]  Richard T. Watson,et al.  Analyzing the Past to Prepare for the Future: Writing a Literature Review , 2002, MIS Q..

[74]  Harvey Maylor,et al.  And then came complex project management (revised) , 2009 .

[75]  Lawrence P. Leach,et al.  Critical Chain Project Management , 2000 .

[76]  J. Thomas,et al.  Understanding the Value of Project Management: First Steps on an International Investigation in Search of Value , 2007 .

[77]  D. Schoen The Reflective Practitioner , 1983 .

[78]  Willy Herroelen,et al.  On the merits and pitfalls of critical chain scheduling , 2000 .

[79]  Bajis Dodin,et al.  A Practical and Accurate Alternative to PERT , 2006 .

[80]  B. Hobbs,et al.  The Perceived Value and Potential Contribution of Project Management Practices to Project Success , 2006 .

[81]  Duncan Cramer,et al.  Quantitative data analysis for social scientists , 1990 .

[82]  Sylwia Męcfal Recenzja książki. Robert K. yin, Case Study Research. Design and Methods (fourth Edition), thousand Oaks, CA: Sage Publications, 2009 , 2012 .

[83]  T. W. Maver,et al.  Appraisal in the Building Design Process , 1970 .

[84]  Anne L. Schneider,et al.  Policy analysis by design , 1987 .

[85]  Genaro J. Gutierrez,et al.  Parkinson's Law and Its Implications for Project Management , 1991 .

[86]  J. Aken Management Research Based on the Paradigm of the Design Sciences: The Quest for Field-Tested and Grounded Technological Rules , 2004 .

[87]  Robert D. Tennyson,et al.  An Empirically Based Instructional Design Theory for Teaching Concepts , 1986 .

[88]  H. Smyth,et al.  An epistemological evaluation of research into projects and their management: Methodological issues , 2007 .

[89]  Frank Teuteberg,et al.  Project management standards – Diffusion and application in Germany and Switzerland , 2009 .

[90]  Martin Krakowski Pert and Parkinson's Law , 1974 .