Lean Production Controlling and Tracking Using Digital Methods
暂无分享,去创建一个
[1] Iris D. Tommelein,et al. Takt-Time Planning and the Last Planner , 2014 .
[2] Patricio A. Vela,et al. Automated Construction Resource Location Tracking to Support the Analysis of Lean Principles , 2010 .
[3] Gregory A. Howell,et al. Lean project management , 2003 .
[4] Jochen Teizer,et al. Automatic spatio-temporal analysis of construction site equipment operations using GPS data , 2013 .
[5] Lauri Koskela,et al. Last Planner and Critical Chain in Construction Management: Comparative Analysis , 2010 .
[6] Mani Golparvar Fard,et al. Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs , 2015, Adv. Eng. Informatics.
[7] Tao Cheng,et al. Automated task-level activity analysis through fusion of real time location sensors and worker's tho , 2013 .
[8] R. Navon,et al. Research in automated measurement of project performance indicators , 2007 .
[9] Digby Christian,et al. A Framework for Integrating Takt Planning, Last Planner System and Labor Tracking , 2016 .
[10] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[11] Shervin Haghsheno,et al. History and Theoretical Foundations of Takt Planning and Takt Control , 2016 .
[12] Frédéric Bosché,et al. Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System , 2014, J. Comput. Civ. Eng..
[13] Frédéric Bosché,et al. Toward Automated Earned Value Tracking Using 3D Imaging Tools , 2013 .
[14] Rafael Sacks,et al. Requirements for building information modeling based lean production management systems for construction , 2010 .
[15] Iris D. Tommelein,et al. Takt Time Planning for Construction of Exterior Cladding , 2013 .
[16] Burcu Akinci,et al. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .
[17] Denise Gravitt. Location‐Based Management for Construction: Planning, Scheduling and Control , 2011 .
[18] Greg Howell,et al. Implementing Lean Construction: Stabilizing Work Flow , 1997 .
[19] Bhargav Dave,et al. Modeling Information Flows Between Last Planner and Location Based Management System , 2016 .
[20] Bengt Klefsjö,et al. The machine that changed the world , 2008 .