Lean Production Controlling and Tracking Using Digital Methods

Lean construction projects are understood as temporary production systems that eliminate waste, allow collaboration and optimize structures of the value added chain. Remaining crucial challenges in construction are the coordination of the involved trades and the tracking of construction progress. Current research in Lean Construction Management (LCM) targets automated digital methods that support work package planning and make inferences about states of progress. The scope of the presented work focuses on closing the feedback loop of lean construction planning, progress tracking, and status control by using 4D information from Building Information Modeling (BIM) as well as Internet-of-Things (IoT) technology for reporting actual progress.

[1]  Iris D. Tommelein,et al.  Takt-Time Planning and the Last Planner , 2014 .

[2]  Patricio A. Vela,et al.  Automated Construction Resource Location Tracking to Support the Analysis of Lean Principles , 2010 .

[3]  Gregory A. Howell,et al.  Lean project management , 2003 .

[4]  Jochen Teizer,et al.  Automatic spatio-temporal analysis of construction site equipment operations using GPS data , 2013 .

[5]  Lauri Koskela,et al.  Last Planner and Critical Chain in Construction Management: Comparative Analysis , 2010 .

[6]  Mani Golparvar Fard,et al.  Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs , 2015, Adv. Eng. Informatics.

[7]  Tao Cheng,et al.  Automated task-level activity analysis through fusion of real time location sensors and worker's tho , 2013 .

[8]  R. Navon,et al.  Research in automated measurement of project performance indicators , 2007 .

[9]  Digby Christian,et al.  A Framework for Integrating Takt Planning, Last Planner System and Labor Tracking , 2016 .

[10]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[11]  Shervin Haghsheno,et al.  History and Theoretical Foundations of Takt Planning and Takt Control , 2016 .

[12]  Frédéric Bosché,et al.  Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System , 2014, J. Comput. Civ. Eng..

[13]  Frédéric Bosché,et al.  Toward Automated Earned Value Tracking Using 3D Imaging Tools , 2013 .

[14]  Rafael Sacks,et al.  Requirements for building information modeling based lean production management systems for construction , 2010 .

[15]  Iris D. Tommelein,et al.  Takt Time Planning for Construction of Exterior Cladding , 2013 .

[16]  Burcu Akinci,et al.  Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .

[17]  Denise Gravitt Location‐Based Management for Construction: Planning, Scheduling and Control , 2011 .

[18]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[19]  Bhargav Dave,et al.  Modeling Information Flows Between Last Planner and Location Based Management System , 2016 .

[20]  Bengt Klefsjö,et al.  The machine that changed the world , 2008 .