Parallel-machine scheduling of simple linear deteriorating jobs

We consider parallel-machine scheduling problems in which the processing time of a job is a simple linear increasing function of its starting time. The objectives are to minimize the makespan, total machine load, and total completion time. We show that all the problems are strongly NP-hard with an arbitrary number of machines and NP-hard in the ordinary sense with a fixed number of machines. For the former two problems, we prove that there exists no polynomial time approximation algorithm with a constant worst-case bound when the number of machines is arbitrary unless P=NP. When the number of machines is fixed, we propose two similar fully polynomial-time approximation schemes for the former two problems.

[1]  Gur Mosheiov,et al.  Scheduling jobs under simple linear deterioration , 1994, Comput. Oper. Res..

[2]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[3]  T. C. Edwin Cheng,et al.  Parallel-machine scheduling with simple linear deterioration to minimize total completion time , 2008, Eur. J. Oper. Res..

[4]  Béla Bollobás,et al.  Parallel Machine Scheduling with Time Dependent Processing Times , 1997, Discret. Appl. Math..

[5]  Gur Mosheiov,et al.  Multi-Machine Scheduling With Linear Deterioration , 1998 .

[6]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[7]  Wieslaw Kubiak,et al.  A Fully Polynomial Approximation Scheme for the Weighted Earliness-Tardiness Problem , 1999, Oper. Res..

[8]  Sid Browne,et al.  Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..

[9]  Zhi-Long Chen Parallel Machine Scheduling with Time Dependent Processing Times , 1996, Discret. Appl. Math..

[10]  T. C. Edwin Cheng,et al.  Scheduling linear deteriorating jobs with an availability constraint on a single machine , 2006, Theor. Comput. Sci..

[11]  Wieslaw Kubiak,et al.  A Fully Polynomial Approximation Scheme for Minimizing Makespan of Deteriorating Jobs , 1998, J. Heuristics.

[12]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[13]  Wen-Chiung Lee,et al.  Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine , 2003, Inf. Process. Lett..

[14]  Bertrand M. T. Lin,et al.  A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..

[15]  Jatinder N. D. Gupta,et al.  Single facility scheduling with nonlinear processing times , 1988 .

[16]  Bahram Alidaee,et al.  Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..

[17]  Sushil K. Gupta,et al.  Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem , 1990 .