Parallel-machine scheduling of simple linear deteriorating jobs
暂无分享,去创建一个
T. C. Edwin Cheng | Min Ji | T. Cheng | Min Ji | T. Cheng
[1] Gur Mosheiov,et al. Scheduling jobs under simple linear deterioration , 1994, Comput. Oper. Res..
[2] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[3] T. C. Edwin Cheng,et al. Parallel-machine scheduling with simple linear deterioration to minimize total completion time , 2008, Eur. J. Oper. Res..
[4] Béla Bollobás,et al. Parallel Machine Scheduling with Time Dependent Processing Times , 1997, Discret. Appl. Math..
[5] Gur Mosheiov,et al. Multi-Machine Scheduling With Linear Deterioration , 1998 .
[6] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[7] Wieslaw Kubiak,et al. A Fully Polynomial Approximation Scheme for the Weighted Earliness-Tardiness Problem , 1999, Oper. Res..
[8] Sid Browne,et al. Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..
[9] Zhi-Long Chen. Parallel Machine Scheduling with Time Dependent Processing Times , 1996, Discret. Appl. Math..
[10] T. C. Edwin Cheng,et al. Scheduling linear deteriorating jobs with an availability constraint on a single machine , 2006, Theor. Comput. Sci..
[11] Wieslaw Kubiak,et al. A Fully Polynomial Approximation Scheme for Minimizing Makespan of Deteriorating Jobs , 1998, J. Heuristics.
[12] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[13] Wen-Chiung Lee,et al. Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine , 2003, Inf. Process. Lett..
[14] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[15] Jatinder N. D. Gupta,et al. Single facility scheduling with nonlinear processing times , 1988 .
[16] Bahram Alidaee,et al. Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..
[17] Sushil K. Gupta,et al. Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem , 1990 .