A Conceptual Study of Key Barriers in Construction Project Coordination

The complexity of the nature of construction makes it one of the most adverse businesses that has ever existed. Construction projects have often suffered from high fragmentation, large waste, poor productivity, cost and time overruns, and conflicts and disputes for a long time. Thus, many new and innovative management and procurement systems in construction are introduced such as partnering, joint venture, alliances, supply chain management, enterprise resource planning (ERP), just in time (JIT), and total quality management (TQM) to meet these challenges. However, these construction management and procurement systems are meaningless without coordination, a vital managerial principle and activity, which provides the best cooperation among team members. Although coordination plays crucial functions throughout the building process especially during the design and construction stages, some failures in construction projects adopting coordination principles are still observed. Hence, a study is carried out to investigate the key barriers of coordination in construction project. Through the literature review, five groups of key barriers are established in this paper, including the nature of construction, traditional contractual arrangement, construction participants, characteristic of organization and construction management approach. The investigation of these key barriers is expected to assist the construction players in coordinating their projects towards a better implementation of the innovative management and procurement systems. Lastly, worthwhile new research topics are suggested by this paper in developing the coordination key performance indicator (KPI) and critical success factor on construction project for further studies.

[1]  P. Thompson,et al.  Engineering Construction Risks - A Guide to Project Risk Analysis and Risk Management , 1994 .

[2]  Stephen Emmitt,et al.  Communication in Construction Teams , 2006 .

[3]  Liaquat Hossain,et al.  Communications and coordination in construction projects , 2009 .

[4]  Y. Chiang Subcontracting and its ramifications: A survey of the building industry in Hong Kong , 2009 .

[5]  Kumar Neeraj Jha,et al.  Commitment, coordination, competence and the iron triangle , 2007 .

[6]  Vivian W. Y Tam,et al.  Impacts of multi-layer chain subcontracting on project management performance , 2011 .

[7]  Andrew S. Chang,et al.  Coordination Needs and Supply of Construction Projects , 2009 .

[8]  Stephen Pryke,et al.  Construction supply chain management : concepts and case studies , 2009 .

[9]  Jennifer Whyte,et al.  Coordination and control in project‐based work: digital objects and infrastructures for delivery , 2010 .

[10]  Gilles Halin,et al.  Building Construction Coordination By An Adaptive Representation Of The Cooperation Context , 2006 .

[11]  Roozbeh Kangari Risk Management Perceptions and Trends of U.S. Construction , 1995 .

[12]  Nicholas Carriero,et al.  Coordination languages and their significance , 1992, CACM.

[13]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[14]  Kevin Crowston,et al.  The interdisciplinary study of coordination , 1994, CSUR.

[15]  Adedeji Badiru,et al.  Triple C Model of Project Management : Communication, Cooperation, and Coordination , 2008 .

[16]  Nii Ankrah,et al.  Architects and contractors: a comparative study of organizational cultures , 2005 .

[17]  Nader Husni Abdul-hadi Factors affecting bidding and markup decisions in Saudi Arabia , 1990 .

[18]  De Saram,et al.  Measuring the quality of contractors' co-ordination activities during the construction process , 2002 .

[19]  Neil N. Eldin Constructability improvement of Project Designs , 1988 .

[20]  Syed M. Ahmed,et al.  SUITABILITY OF THE CRITICAL INCIDENT TECHNIQUE TO MEASURE QUALITY OF CONSTRUCTION COORDINATION , 2004 .

[21]  Matthew R. Hallowell,et al.  Contemporary Design-Bid-Build Model , 2009 .

[22]  Skill Requirements The construction industry in the twenty-first century: its image, employment prospects and skill requirements : report for discussion at the Tripartite Meeting on the Construction Industry in the twenty-first century: its Image, Employment Prospects and Skill Requirements, Geneva, 2001 , 2001 .

[23]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[24]  N. Carter General and Industrial Management , 1986 .

[25]  Roy Mendelsohn,et al.  The Constructibility Review Process: A Constructor's Perspective , 1997 .

[26]  Yuhong Wang COORDINATION ISSUES IN CHINESE LARGE BUILDING PROJECTS , 2000 .

[27]  X. Xue,et al.  Coordination mechanisms for construction supply chain management in the Internet environment , 2007 .

[28]  C. Oliver,et al.  Organizations Working Together , 1992 .

[29]  Andrea Patacconi,et al.  Coordination and Delay in Hierarchies , 2009 .

[30]  Gilles Halin,et al.  Assistance to building construction coordination - towards a multi-view cooperative platform , 2006, J. Inf. Technol. Constr..

[31]  A. V. D. Ven,et al.  On the Nature, Formation, and Maintenance of Relations Among Organizations , 1976 .

[32]  N. G. Bunni,et al.  Engineering construction risks: a guide to project risk analysis and risk management: Edited by Peter Thompson and John Perry, SERC, London, 1992 56 pages, £17 ISBN: 072 77 166 54 , 1993 .

[33]  Hans-Henrik Hvolby,et al.  Supplly Chain Coordination Problems: Literature Review , 2004 .

[34]  Liang Y Liu,et al.  Impact of management approach on project interaction and performance , 1997 .

[35]  Zhonghui Wang,et al.  Parametric Coordinator for Engineering Design , 2000 .

[36]  Albert Jones,et al.  A service oriented framework for construction supply chain integration , 2010, Automation in Construction.

[37]  Nicholas Carriero,et al.  How to write parallel programs , 1990 .

[38]  Kevin Crowston,et al.  Coordination Theory: A Ten-Year Retrospective , 2004, Computer Supported Acitivity Coordination.

[39]  William R. Park Construction bidding for profit , 1979 .

[40]  Gurth Higgin,et al.  Communications in the building industry : the report of a pilot study , 1965 .

[41]  Charles Crichton,et al.  Interdependence and uncertainty : a study of the building industry , 2001 .

[42]  Sudhir Misra,et al.  Ranking and classification of construction coordination activities in Indian projects , 2007 .

[43]  R. Pieters,et al.  Working Paper , 1994 .

[44]  Syed M. Ahmed,et al.  Construction Coordination Activities: What Is Important and What Consumes Time , 2001 .

[45]  Xiaodong Li,et al.  An agent-based framework for supply chain coordination in construction , 2005 .

[46]  Liang Y Liu,et al.  Relationship between Project Interaction and Performance Indicators , 1996 .

[47]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .