Integration of SWOT analysis with hybrid modified TOPSIS for the lean strategy evaluation
暂无分享,去创建一个
[1] R A Abrahams,et al. USING LEAN METHODOLOGIES FOR ECONOMICALLY AND ENVIRONMENTALLY SUSTAINABLE FOUNDRIES , 2011 .
[2] Zeki Ayağ,et al. Evaluating machine tool alternatives through modified TOPSIS and alpha-cut based fuzzy ANP , 2012 .
[3] Tim Baines,et al. State-of-the-art in lean design engineering: A literature review on white collar lean , 2006 .
[4] Taiichi Ohno,et al. The Toyota Production System , 1984 .
[5] Alev Taskin Gumus,et al. Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology , 2009, Expert Syst. Appl..
[6] William Ho,et al. Integrated analytic hierarchy process and its applications - A literature review , 2008, Eur. J. Oper. Res..
[7] Edmundas Kazimieras Zavadskas,et al. Ranking the strategies of mining sector through anp and topsis in a swot framework , 2011 .
[8] Metin Dagdeviren,et al. Using the analytic network process (ANP) in a SWOT analysis - A case study for a textile firm , 2007, Inf. Sci..
[9] Dursun Delen,et al. Development of a fuzzy ANP based SWOT analysis for the airline industry in Turkey , 2012, Expert Syst. Appl..
[10] Jostein Pettersen,et al. Defining Lean Production : Some conceptual and practical issues , 2008 .
[11] Kip R. Krumwiede,et al. Using Simulation to Explore Lean Manufacturing Implementation Strategies , 2010 .
[12] Keith W. Glaister,et al. Strategic Planning: Still Going Strong? , 1999 .
[13] Ching-Lai Hwang,et al. Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.
[14] Ravi Shankar,et al. Lean philosophy: implementation in a forging company , 2008 .
[15] Azharul Karim,et al. A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations , 2013, Bus. Process. Manag. J..
[16] Selçuk Perçin,et al. Evaluation of third‐party logistics (3PL) providers by using a two‐phase AHP and TOPSIS methodology , 2009 .
[17] Joseph Sarkis,et al. Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach , 1999 .
[18] Sankaran Mahadevan,et al. Supplier selection based on evidence theory and analytic network process , 2016 .
[19] Robert D. Hisrich,et al. Entrepreneurship: Starting, Developing, and Managing a New Enterprise , 1989 .
[20] Rachna Shah,et al. Defining and developing measures of lean production , 2007 .
[21] Shankar Chakraborty,et al. A combined TOPSIS-AHP-method-based approach for non-traditional machining processes selection , 2008 .
[22] Tim Baines,et al. State-of-the-art of ‘Lean’ in the aviation maintenance, repair, and overhaul industry , 2011 .
[23] Dinesh Khanduja,et al. An empirical study on applicability of lean and green practices in the foundry industry , 2016 .
[24] Essam Shehab,et al. A multiple-case assessment of product-service system leanness in UK manufacturing companies , 2016 .
[25] A. Sánchez,et al. Lean indicators and manufacturing strategies , 2001 .
[26] David J. Carney,et al. A basis for evaluation of commercial software , 1998, Inf. Softw. Technol..
[27] J. L. Bower,et al. Business policy: text and cases , 1973 .
[28] Sanjay Bhasin,et al. An appropriate change strategy for lean success , 2012 .
[29] R. Yusuff,et al. An integration of a hybrid modified TOPSIS with a PGP model for the supplier selection with interdependent criteria , 2013 .
[30] Chung-Hsing Yeh,et al. Inter-company comparison using modified TOPSIS with objective weights , 2000, Comput. Oper. Res..
[31] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[32] Hayato Yoshioka,et al. Quantitative SWOT analysis on global competitiveness of machine tool industry , 2006 .
[33] Danijela Tadic,et al. New integrated approach to the problem of ranking and supplier selection under uncertainties , 2011 .
[34] Hsu-Shih Shih,et al. A hybrid MCDM model for strategic vendor selection , 2006, Math. Comput. Model..