Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling
暂无分享,去创建一个
[1] Lixin Tang,et al. Iterated local search algorithm based on very large-scale neighborhood for prize-collecting vehicle routing problem , 2006 .
[2] Chang Wook Ahn,et al. A genetic algorithm for shortest path routing problem and the sizing of populations , 2002, IEEE Trans. Evol. Comput..
[3] Rubén Ruiz,et al. Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics , 2005, Eur. J. Oper. Res..
[4] E. Balas,et al. New classes of efficiently solvable generalized Traveling Salesman Problems , 1999, Ann. Oper. Res..
[5] Stefan Boettcher,et al. Optimization with extremal dynamics , 2003, Complex..
[6] Michel Gendreau,et al. The hot strip mill production scheduling problem: A tabu search approach , 1998, Eur. J. Oper. Res..
[7] Refael Hassin,et al. Machine scheduling with earliness, tardiness and non-execution penalties , 2005, Comput. Oper. Res..
[8] Zbigniew Michalewicz,et al. Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.
[9] Pedro Larrañaga,et al. Genetic Algorithms for the Travelling Salesman Problem: A Review of Representations and Operators , 1999, Artificial Intelligence Review.
[10] Fabiano Luis de Sousa,et al. Generalized extremal optimization: An application in heat pipe design , 2004 .
[11] Paul A. Rubin,et al. Scheduling in a sequence dependent setup environment with genetic search , 1995, Comput. Oper. Res..
[12] Michel Gendreau,et al. Traveling Salesman Problems with Profits , 2005, Transp. Sci..
[13] N. Anantharaman,et al. Generating non-permutation schedules in flowline-based manufacturing sytems with sequence-dependent setup times of jobs: a heuristic approach , 2004 .
[14] Sung-Shick Kim,et al. A Tabu Search Algorithm for Single Machine Scheduling with Release Times, Due Dates, and Sequence-Dependent Set-up Times , 2002 .
[15] Shi-Chung Chang,et al. Scheduling flexible flow shops with sequence-dependent setup effects , 2000, IEEE Trans. Robotics Autom..
[16] Stefan Boettcher,et al. Extremal Optimization: Methods derived from Co-Evolution , 1999, GECCO.
[17] Peter Cowling,et al. A flexible decision support system for steel hot rolling mill scheduling , 2003, Comput. Ind. Eng..
[18] Thomas A. Feo,et al. A grasp for single machine scheduling with sequence dependent setup costs and linear delay penalties , 1996, Comput. Oper. Res..
[19] A. Percus,et al. Nature's Way of Optimizing , 1999, Artif. Intell..