Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games

In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the “Bird’s Nest”). We propose a “zoom” interface between 4D CAD and 3D animation of operations simulation to enable a natural synergy of two separate, but organically linked research streams. For concept proving and application demonstration, we seamlessly integrated two computer systems resulting from previous in-house research to plan and visualize the construction of the “Bird’s Nest” in close collaboration with the main contractor. The integrated construction planning methodology is found instrumental in visually and intuitively conveying the master project schedule and detailed operations plan for construction of the “Bird’s Nest”.

[1]  Ming Lu,et al.  Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA , 2007 .

[2]  Stuart D. Anderson,et al.  Empirical Study on the Merit of Web-Based 4D Visualization in Collaborative Construction Planning and Scheduling , 2007 .

[3]  Julio C. Martinez,et al.  Visualizing Simulated Construction Operations in 3D , 2001 .

[4]  Wah-Ho Chan,et al.  Generic Process Mapping and Simulation Methodology for Integrating Site Layout and Operations Planning in Construction , 2007 .

[5]  Simaan M. AbouRizk,et al.  Integrated three-dimensional computer-aided design and discrete-event simulation models , 2003 .

[6]  Mohamed Al-Hussein,et al.  Integrating 3D visualization and simulation for tower crane operations on construction sites , 2006 .

[7]  Ming Lu,et al.  SIMPLIFIED DISCRETE-EVENT SIMULATION APPROACH FOR CONSTRUCTION SIMULATION , 2003 .

[8]  Jian-Ping Zhang,et al.  Hybrid intelligence utilization for construction site layout , 2002 .

[9]  N D Lea Construction management. , 1968, Canadian hospital.

[10]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[11]  Gabriel A. Wainer,et al.  Representation and analysis of spatial resources in construction simulation , 2005, Proceedings of the Winter Simulation Conference, 2005..

[12]  William J. O'Brien,et al.  Framework for a Point-N-Click Interface System for 3D CAD Construction Visualization and Documentation , 2003 .

[13]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[14]  Qian Wang,et al.  A New 4DManagement Approach to Construction Planning and Site Space Utilization , 2000 .

[15]  Arkady Retik Geometric-Based Reasoning System for Project Planning , 1995 .

[16]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[17]  Simaan M. AbouRizk,et al.  Simplifying Simulation Modeling through Integration with 3D CAD , 2000 .

[18]  Julio C. Martinez,et al.  Stroboscope: State and resource based simulation of construction processes. , 1996 .