Considering environmental costs of copper production in cut-off grades optimization
暂无分享,去创建一个
[1] Gregory R. Choppin,et al. Solvent Extraction Principles and Practice, Revised and Expanded , 1992 .
[2] Asit K. Biswas,et al. Extractive metallurgy of copper , 1976 .
[3] C. L. Brierley,et al. Present and future commercial applications of biohydrometallurgy , 1999 .
[4] Kenneth F. Lane,et al. The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .
[6] Helen R. Watling,et al. The bioleaching of sulphide minerals with emphasis on copper sulphides — A review , 2006 .
[7] David Dreisinger,et al. Copper leaching from primary sulfides: Options for biological and chemical extraction of copper , 2006 .
[8] Carsten Drebenstedt,et al. Mine Planning and Equipment Selection , 2014 .
[9] T. Chou,et al. Effective thermoelastic constants of short-fiber composites , 1981 .
[10] D. Rawlings,et al. Biomineralization of metal-containing ores and concentrates. , 2003, Trends in biotechnology.
[11] Bahram Rezai,et al. Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits , 2008 .
[12] H. Baioumy,et al. Environmental impact assessment inside and around Mahd Adh Dhahab gold mine, Saudi Arabia , 2012, Arabian Journal of Geosciences.
[13] Masoud Monjezi,et al. Application of neural networks to predict net present value in mining projects , 2014, Arabian Journal of Geosciences.
[14] S. Simpson,et al. An evaluation of copper remobilization from mine tailings in sulfidic environments , 1998 .
[15] Bahram Rezai,et al. An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage , 2008 .
[16] Mining and its Impact on the Environment , 2006 .
[17] Chiranjib Kumar Gupta,et al. Chemical Metallurgy: Principles and Practice , 2002 .
[18] E. Jackson,et al. Hydrometallurgical extraction and reclamation , 1986 .
[19] Y. Hamed,et al. Atmospheric pollution in North Africa (ecosystems–atmosphere interactions): a case study in the mining basin of El Guettar–M’Dilla (southwestern Tunisia) , 2014, Arabian Journal of Geosciences.
[20] Robert W. Bartlett,et al. Solution Mining: Leaching and Fluid Recovery of Materials , 1992 .
[21] Fathi Habashi,et al. A Textbook of Hydrometallurgy, 2nd edition , 1999 .
[22] Mohammad Waqar Ali Asad. Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation , 2007 .
[23] Ren Yi,et al. ECONOMIC SIGNIFICANCE OF SUB-CUTOFF GRADES IN OPEN PITS OPERATING WITH CONCENTRATOR BOTTLENECK , 1999 .
[24] Roussos Dimitrakopoulos,et al. A Heuristic Approach to Stochastic Cutoff Grade Optimization for Open Pit Mining Complexes , 2013 .
[25] Mohammad Ataei,et al. Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits , 2003 .
[26] Fathi Habashi,et al. Handbook of extractive metallurgy , 1997 .
[27] X. Emery,et al. Simulation of mineral grades and classification of mineral resources by using hard and soft conditioning data: application to Sungun porphyry copper deposit , 2013, Arabian Journal of Geosciences.
[28] Yue Li,et al. Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore , 2009, Expert Syst. Appl..
[29] F Rashidinezhad,et al. Cutoff grades optimization with environmental management A case study: Sungun Copper Project , 2008 .
[30] A. Jafarnejad,et al. Cut-off Grade Optimization for Maximizing the Output Rate , 2012 .
[31] Erkan Topal,et al. Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .
[32] A. Bascetin A. Nieto. Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor , 2007 .
[33] K Dagdelen,et al. CUT-OFF GRADE OPTIMIZATION FOR LARGE SCALE MULTI-MINE, MULTI-PROCESS MINING OPERATIONS , 2007 .
[34] Javad Gholamnejad. Determination of the Optimum Cutoff Grade Considering Environmental Cost , 2008 .
[35] Mohammad Ataei,et al. Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits , 2003 .
[36] T. J. O'Neil,et al. Application of Computers and Operations Research in the Mineral Industry , 1979 .
[37] Mohammad Ataei,et al. Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .
[38] Mohamed O. Arnous,et al. Assessment of hazardous mine waste transport in west central Sinai, using remote sensing and GIS approaches: a case study of Um Bogma area, Egypt , 2010, Arabian Journal of Geosciences.
[39] Ruan Ren-man,et al. Bacterial heap-leaching: Practice in Zijinshan copper mine☆ , 2006 .
[40] Aixiang Wu,et al. Technological assessment of a mining-waste dump at the Dexing copper mine, China, for possible conversion to an in situ bioleaching operation. , 2009, Bioresource technology.
[41] Minnitt R.C.M.. CUT-OFF GRADE DETERMINATION FOR THE MAXIMUM VALUE OF A SMALL WITS-TYPE GOLD MINING OPERATION , 2003 .
[42] W. G. Davenport,et al. Extractive Metallurgy of Copper, Third Edition , 1994 .
[43] C. L. Brierley,et al. Present and future commercial applications of biohydrometallurgy , 2001 .