Considering environmental costs of copper production in cut-off grades optimization

The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has drawn considerations to processing methods which not only extracts low-grade copper ores but also decreases adverse environmental impacts. Hydrometallurgical methods are the most applicable ones which affect the optimum policy of cut-off grades determination. In this research, an optimum cut-off grades modeling is developed with the objective function of net present value (NPV) maximization. The costs of processing methods and associated environmental costs are also involved in the model. Next, limiting and balancing cut-off grades of processing methods are calculated through Lagrange multiplier optimization method. Finally, an iteration algorithm is exercised to compute the maximum amount of NPV as well as concentration and leaching optimum cut-off grades. The results show that the concentration and leaching optimum cut-off grades policy makes an improvement on overall NPV by 35 % in comparison with the traditional approaches of cut-off grades determination. The adverse environmental impacts of low-grade ores dumping are also reduced by using hydrometallurgical methods.

[1]  Gregory R. Choppin,et al.  Solvent Extraction Principles and Practice, Revised and Expanded , 1992 .

[2]  Asit K. Biswas,et al.  Extractive metallurgy of copper , 1976 .

[3]  C. L. Brierley,et al.  Present and future commercial applications of biohydrometallurgy , 1999 .

[4]  Kenneth F. Lane,et al.  The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .

[6]  Helen R. Watling,et al.  The bioleaching of sulphide minerals with emphasis on copper sulphides — A review , 2006 .

[7]  David Dreisinger,et al.  Copper leaching from primary sulfides: Options for biological and chemical extraction of copper , 2006 .

[8]  Carsten Drebenstedt,et al.  Mine Planning and Equipment Selection , 2014 .

[9]  T. Chou,et al.  Effective thermoelastic constants of short-fiber composites , 1981 .

[10]  D. Rawlings,et al.  Biomineralization of metal-containing ores and concentrates. , 2003, Trends in biotechnology.

[11]  Bahram Rezai,et al.  Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits , 2008 .

[12]  H. Baioumy,et al.  Environmental impact assessment inside and around Mahd Adh Dhahab gold mine, Saudi Arabia , 2012, Arabian Journal of Geosciences.

[13]  Masoud Monjezi,et al.  Application of neural networks to predict net present value in mining projects , 2014, Arabian Journal of Geosciences.

[14]  S. Simpson,et al.  An evaluation of copper remobilization from mine tailings in sulfidic environments , 1998 .

[15]  Bahram Rezai,et al.  An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage , 2008 .

[16]  Mining and its Impact on the Environment , 2006 .

[17]  Chiranjib Kumar Gupta,et al.  Chemical Metallurgy: Principles and Practice , 2002 .

[18]  E. Jackson,et al.  Hydrometallurgical extraction and reclamation , 1986 .

[19]  Y. Hamed,et al.  Atmospheric pollution in North Africa (ecosystems–atmosphere interactions): a case study in the mining basin of El Guettar–M’Dilla (southwestern Tunisia) , 2014, Arabian Journal of Geosciences.

[20]  Robert W. Bartlett,et al.  Solution Mining: Leaching and Fluid Recovery of Materials , 1992 .

[21]  Fathi Habashi,et al.  A Textbook of Hydrometallurgy, 2nd edition , 1999 .

[22]  Mohammad Waqar Ali Asad Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation , 2007 .

[23]  Ren Yi,et al.  ECONOMIC SIGNIFICANCE OF SUB-CUTOFF GRADES IN OPEN PITS OPERATING WITH CONCENTRATOR BOTTLENECK , 1999 .

[24]  Roussos Dimitrakopoulos,et al.  A Heuristic Approach to Stochastic Cutoff Grade Optimization for Open Pit Mining Complexes , 2013 .

[25]  Mohammad Ataei,et al.  Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits , 2003 .

[26]  Fathi Habashi,et al.  Handbook of extractive metallurgy , 1997 .

[27]  X. Emery,et al.  Simulation of mineral grades and classification of mineral resources by using hard and soft conditioning data: application to Sungun porphyry copper deposit , 2013, Arabian Journal of Geosciences.

[28]  Yue Li,et al.  Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore , 2009, Expert Syst. Appl..

[29]  F Rashidinezhad,et al.  Cutoff grades optimization with environmental management A case study: Sungun Copper Project , 2008 .

[30]  A. Jafarnejad,et al.  Cut-off Grade Optimization for Maximizing the Output Rate , 2012 .

[31]  Erkan Topal,et al.  Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .

[32]  A. Bascetin A. Nieto Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor , 2007 .

[33]  K Dagdelen,et al.  CUT-OFF GRADE OPTIMIZATION FOR LARGE SCALE MULTI-MINE, MULTI-PROCESS MINING OPERATIONS , 2007 .

[34]  Javad Gholamnejad Determination of the Optimum Cutoff Grade Considering Environmental Cost , 2008 .

[35]  Mohammad Ataei,et al.  Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits , 2003 .

[36]  T. J. O'Neil,et al.  Application of Computers and Operations Research in the Mineral Industry , 1979 .

[37]  Mohammad Ataei,et al.  Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .

[38]  Mohamed O. Arnous,et al.  Assessment of hazardous mine waste transport in west central Sinai, using remote sensing and GIS approaches: a case study of Um Bogma area, Egypt , 2010, Arabian Journal of Geosciences.

[39]  Ruan Ren-man,et al.  Bacterial heap-leaching: Practice in Zijinshan copper mine☆ , 2006 .

[40]  Aixiang Wu,et al.  Technological assessment of a mining-waste dump at the Dexing copper mine, China, for possible conversion to an in situ bioleaching operation. , 2009, Bioresource technology.

[41]  Minnitt R.C.M. CUT-OFF GRADE DETERMINATION FOR THE MAXIMUM VALUE OF A SMALL WITS-TYPE GOLD MINING OPERATION , 2003 .

[42]  W. G. Davenport,et al.  Extractive Metallurgy of Copper, Third Edition , 1994 .

[43]  C. L. Brierley,et al.  Present and future commercial applications of biohydrometallurgy , 2001 .