Short-term industrial load forecasting: A case study in an Italian factory

Excellence in the planning and operations of power systems largely relies on accurate forecasts of loads. Although load forecasting has been extensively studied over the past several decades, the scientific community has not yet paid much attention to industrial load forecasting. The electricity demand of factories depends on many factors, of which some are uncommon or not as important in the classical load forecasting models. For instance, the scheduled processes and work shifts are very important to forecasting short-term industrial loads. In this paper, we offer some insights into modeling industrial loads. We develop a set of multiple linear regression models for an Italian factory that manufactures transformers. The proposed models outperform two other benchmark models for forecasting industrial loads 24 hours in advance.

[1]  Randell Johnson An Era of Many Options: Future Energy Planning Must Take into Account Unprecedented Numbers of Options , 2015, IEEE Power and Energy Magazine.

[2]  James D. Hamilton Time Series Analysis , 1994 .

[3]  Pierre Pinson,et al.  Global Energy Forecasting Competition 2012 , 2014 .

[4]  S. V. Rodygina,et al.  Comparative analysis of electrical load forecasting models of industrial plants , 2016, 2016 Dynamics of Systems, Mechanisms and Machines (Dynamics).

[5]  Marie-Agnès Girard,et al.  Short Term Load Forecasting in the Industry for Establishing Consumption Baselines: A French Case , 2015 .

[6]  Furong Li,et al.  Active Network Management Considering Wind and Load Forecasting Error , 2017, IEEE Transactions on Smart Grid.

[7]  Jonathan D. Cryer,et al.  Time Series Analysis , 1986 .

[8]  Pierluigi Siano,et al.  A Review of Architectures and Concepts for Intelligence in Future Electric Energy Systems , 2015, IEEE Transactions on Industrial Electronics.

[9]  J. Brian Gray,et al.  Introduction to Linear Regression Analysis , 2002, Technometrics.

[10]  Nadeem Javaid,et al.  An Accurate and Fast Converging Short-Term Load Forecasting Model for Industrial Applications in a Smart Grid , 2017, IEEE Transactions on Industrial Informatics.

[11]  Mohammad Yusri Hassan,et al.  Operation and control strategies of integrated distributed energy resources: A review , 2015 .

[12]  Tao Hong,et al.  Probabilistic electric load forecasting: A tutorial review , 2016 .

[13]  D. P. Chandima,et al.  Short-term electricity demand forecasting method for smart meters , 2012, 2012 IEEE 6th International Conference on Information and Automation for Sustainability.

[14]  Eric Lynn Taylor Short-term Electrical Load Forecasting for an Institutional/Industrial Power System Using an Artificial Neural Network , 2013 .

[15]  Rob J Hyndman,et al.  Probabilistic energy forecasting: Global Energy Forecasting Competition 2014 and beyond , 2016 .

[16]  Tao Hong,et al.  Short Term Electric Load Forecasting , 2012 .

[17]  Guido Carpinelli,et al.  Optimal control strategy of a DC micro grid , 2015 .

[18]  Zafar A. Khan,et al.  Load forecasting, dynamic pricing and DSM in smart grid: A review , 2016 .