Themes for facilitating material flow in manufacturing systems

Organizes the wide‐ranging literature on “new wave manufacturing” factors which impact on the flow of materials into six themes which are related to a conceptual model. The six themes are: the effects of under‐capacity loading; the role of pull scheduling; the reduction of variability; the reduction of throughput time; the effects of reduced throughput time and of schedule stability on outbound logistics; and the application of synchronous flow to inbound logistics. Concludes that case study methodology offers wider potential to research casual links in the potentially complex interactions involved.

[1]  Jack R. Meredith,et al.  A Longitudinal Study of the Role of Manufacturing Technology in Business Strategy , 1993 .

[2]  G Frizelle,et al.  Measuring complexity as an aid to developing operational strategy , 1995 .

[3]  C. New The Use of Throughput Efficiency as a Key Performance Measure for the New Manufacturing Era , 1993 .

[4]  Willard I. Zangwill The Limits of Japanese Production Theory , 1992 .

[5]  Rick L. Wilson,et al.  Planning for Continual Improvement in a Just‐in‐Time Environment , 1993 .

[6]  John G. Wacker,et al.  The complementary nature of manufacturing goals by their relationship to throughput time: A theory of internal variability of production systems , 1987 .

[7]  L. C. Lee A Comparative Study of the Push and Pull Production Systems , 1989 .

[8]  Bob Barker,et al.  Value‐adding Performance Measurement: A Time‐based Approach , 1993 .

[9]  Nick Oliver,et al.  JUST‐IN‐TIME OR JUST THE SAME? DEVELOPMENTS IN THE AUTO INDUSTRY – THE RETAILERS′ VIEW , 1991 .

[10]  Robert A. Novack,et al.  Rethinking Integrated Concept Foundations: A Just‐in‐Time Argument for Linking Production/Operations and Logistics Management , 1993 .

[11]  Frank Safayeni,et al.  A behavioral case study of just-in-time implementation , 1991 .

[12]  N. Oliver,et al.  World Class Manufacturing: Further Evidence in the Lean Production Debate1 , 1994 .

[13]  Jack R. Meredith,et al.  Theory Building through Conceptual Methods , 1993 .

[14]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[15]  Nick Oliver,et al.  The dynamics of just-in-time , 1991 .

[16]  Alan Harrison,et al.  New wave manufacturing strategies , 1996 .

[17]  K.H.W. Seah,et al.  JIT and the Effects of Varying Process and Set‐Up Times , 1988 .

[18]  Donald W. Fogarty,et al.  Work in process: performance measures , 1992 .

[19]  James A. Pope,et al.  Strategic Planning for Production Capacity , 1993 .

[20]  Louis Giust Just‐in‐Time Manufacturing and Material Handling Trends , 1993 .

[21]  J. Motwani,et al.  A methodology for assessing time‐based competitive advantage of manufacturing firms , 1995 .

[22]  John Mapes The Effect of Capacity Limitations on Safety Stock , 1993 .

[23]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[24]  Arthur V. Hill,et al.  Reducing vendor delivery uncertainties in a JIT environment , 1986 .

[25]  Loren Paul Rees,et al.  A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .

[26]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[27]  Nigel Slack,et al.  Operations management , 1994 .

[28]  G. Stalk Time-The Next Source of Competitive Advantage , 1988 .

[29]  Colin New,et al.  World‐class Manufacturing versus Strategic Trade‐offs , 1992 .

[30]  Eliyahu M. Goldratt,et al.  Theory of Constraints , 1990 .

[31]  Heinz Häfner Lot sizing and throughput times in a job shop , 1991 .

[32]  Scott R. Swenseth,et al.  Implications of Inbound Lead Time Variability for Just‐in‐Time Manufacturing , 1991 .

[33]  Alan Harrison,et al.  Issues in Setting up JIT Supply , 1990 .

[34]  Christer Karlsson,et al.  Total Effectiveness in a Just‐in‐Time System , 1994 .

[35]  G Frizelle Managing complexity as part of an operational strategy , 1994 .

[36]  Stephen Ackroyd,et al.  The Japanisation of British industry , 1988 .

[37]  R. Yin Case Study Research: Design and Methods , 1984 .

[38]  Eliyahu M. Goldratt,et al.  Computerized shop floor scheduling , 1988 .

[39]  J.A.A. Sillince,et al.  Integrating MRPII and JIT: A Management Rather Than a Technical Challenge , 1993 .

[40]  David M. McCutcheon,et al.  Conducting case study research in operations management , 1993 .

[41]  Glenn Bassett Job‐shop Operations Reform: Strategies for Achieving Queueless Work Flow , 1991 .