Site utility system optimization with operation adjustment under uncertainty

Utility systems must satisfy process energy and power demands under varying conditions. The system performance is decided by the system configuration and individual equipment operating load for boilers, gas turbines, steam turbines, condensers, and let down valves. Steam mains conditions in terms of steam pressures and steam superheating also play important roles on steam distribution in the system and power generation by steam expansion in steam turbines, and should be included in the system optimization. Uncertainties such as process steam power demand changes and electricity price fluctuations should be included in the system optimization to eliminate as much as possible the production loss caused by steam power deficits due to uncertainties. In this paper, uncertain factors are classified into time-based and probability-based uncertain factors, and operation scheduling containing multi-period equipment load sharing, redundant equipment start up, and electricity import to compensate for power deficits, have been presented to deal with the happens of uncertainties, and are formulated as a multi-period item and a recourse item in the optimization model. There are two case studies in this paper. One case illustrates the system design to determine system configuration, equipment selection, and system operation scheduling at the design stage to deal with uncertainties. The other case provides operational optimization scenarios for an existing system, especially when the steam superheating varies. The proposed method can provide practical guidance to system energy efficiency improvement.

[1]  Lidija Čuček,et al.  Multi-objective optimisation for generating sustainable solutions considering total effects on the environment , 2013 .

[2]  Enrico Carpaneto,et al.  Cogeneration Planning under Uncertainty. Part I: Multiple Time Frame Formulation , 2011 .

[3]  Thokozani Majozi,et al.  Steam system network synthesis with hot liquid reuse: II. Incorporating shaft work and optimum steam levels , 2016, Comput. Chem. Eng..

[4]  Masoud Soroush,et al.  Process systems opportunities in power generation, storage and distribution , 2013, Comput. Chem. Eng..

[5]  Neven Duić Sustainable Development of Energy, Water and Environmental Systems , 2010 .

[6]  Robin Smith,et al.  Heat recovery and power targeting in utility systems , 2015 .

[7]  Hui Zhang,et al.  Chance Constrained Programming for Optimal Power Flow Under Uncertainty , 2011, IEEE Transactions on Power Systems.

[8]  G. Wozny,et al.  Utility systems operation: Optimisation-based decision making , 2011 .

[9]  Bodo Linnhoff,et al.  Total site targets for fuel, co-generation, emissions, and cooling , 1993 .

[10]  I. Grossmann,et al.  Synthesis and Operational Planning of Utility Systems for Multiperiod Operation , 1998 .

[11]  André Bardow,et al.  The optimum is not enough: A near-optimal solution paradigm for energy systems synthesis , 2015 .

[12]  Enrico Carpaneto,et al.  Cogeneration planning under uncertainty. Part II: Decision theory-based assessment of planning alternatives , 2011 .

[13]  Mahmoud M. El-Halwagi,et al.  Targeting cogeneration and waste utilization through process integration , 2009 .

[14]  E. Beale ON MINIMIZING A CONVEX FUNCTION SUBJECT TO LINEAR INEQUALITIES , 1955 .

[15]  Nikolaos V. Sahinidis,et al.  Optimization under uncertainty: state-of-the-art and opportunities , 2004, Comput. Chem. Eng..

[16]  André Bardow,et al.  Automated superstructure-based synthesis and optimization of distributed energy supply systems , 2013 .

[17]  Ignacio E. Grossmann,et al.  Optimal scheduling of industrial combined heat and power plants under time-sensitive electricity prices , 2013 .

[18]  Antonis C. Kokossis,et al.  Conceptual optimisation of utility networks for operational variations—II. Network development and optimisation , 1998 .

[19]  Robin Smith,et al.  Performance Modeling of New and Existing Steam Turbines , 2015 .