The ISO 31000 standard in supply chain risk management

Ruptures and interruptions in supply chains (SC) can cause large financial losses and undermine the reputation of firms. In this respect, there is growing interest among researchers in the theme of supply chain risk management (SCRM). SCRM involves analysis carried out in various steps. However, researchers diverge over the number and content of these steps. In light of this problem, the aim of the present study was to analyze whether it is possible to apply the ISO 31000 standard as a systematic procedure for SCRM. And, if so, how the standard can be implemented in the SCRM context, as a framework in a specific company. Through a systematic literature review, we compared and harmonized the risk management steps proposed by researches about SCRM. Additionally we developed a pathway to identify and prioritize which ISO 31000:2009 risk assessment tools and techniques are supposed to integrate a procedure for SCRM, based on the Analytic Hierarchy Process (AHP), exemplified in an automotive supply chain. Based on the research findings, we infer that ISO 31000 can be used beneficially as a standardized method to perform SCRM, as long as tools and techniques are selected according to the company needs and business characteristics.

[1]  E. Hartmann,et al.  Supply risk management: model development and empirical analysis , 2012 .

[2]  Kirti Peniwati,et al.  Aggregating individual judgments and priorities with the analytic hierarchy process , 1998, Eur. J. Oper. Res..

[3]  Jack R. Meredith,et al.  Theory Building through Conceptual Methods , 1993 .

[4]  F. Strozzi,et al.  Supply chain risk management: a new methodology for a systematic literature review , 2012 .

[5]  R. Narasimhan,et al.  Perspectives on risk management in supply chains , 2009 .

[6]  Richard T. Watson,et al.  Analyzing the Past to Prepare for the Future: Writing a Literature Review , 2002, MIS Q..

[7]  Piyush Singhal,et al.  Supply chain risk management: review, classification and future research directions , 2011 .

[8]  Uta Jüttner Supply chain risk management: Understanding the business requirements from a practitioner perspective , 2005 .

[9]  Habib Chabchoub,et al.  A combined approach for supply chain risk management: description and application to a real hospital pharmaceutical case study , 2014 .

[10]  Charif Mabrouki,et al.  A decision support methodology for risk management within a port terminal , 2014 .

[11]  Carla Wilkin,et al.  Analysis of SCOR’s approach to supply chain risk management , 2014 .

[12]  Thomas L. Saaty,et al.  Structures in decision making: On the subjective geometry of hierarchies and networks , 2009, Eur. J. Oper. Res..

[13]  Andreas Norrman,et al.  Ericsson’s Proactive Supply Chain Risk Management-approach After a Serious Supplier Accident , 2004 .

[14]  Fernando Augusto Silva Marins,et al.  ANALYTIC NETWORK PROCESS AND BALANCED SCORECARD APPLIED TO THE PERFORMANCE EVALUATION OF PUBLIC HEALTH SYSTEMS , 2015 .

[15]  M. Christopher,et al.  Supply chain risk management: outlining an agenda for future research , 2003 .

[16]  P. Schönsleben,et al.  System-oriented supply chain risk management , 2009 .

[17]  Germaine H. Saad,et al.  Managing Disruption Risks in Supply Chains , 2005 .

[18]  V. Tummala,et al.  Assessing and Managing Risks Using the Supply Chain Risk Management Process (SCRMP) , 2011 .

[19]  Paulo Augusto Cauchick Miguel,et al.  Managing end of life products: a review of the literature on reverse logistics in Brazil , 2014 .

[20]  Carole Lalonde,et al.  Managing risks through ISO 31000: A critical analysis , 2012 .

[21]  David J. Ketchen,et al.  Risk Uncertainty and Supply Chain Decisions: A Real Options Perspective , 2010, Decis. Sci..

[22]  Hau L. Lee,et al.  Mitigating supply chain risk through improved confidence , 2004 .

[23]  S. Chopra,et al.  Managing Risk To Avoid Supply-Chain Breakdown , 2004 .

[24]  Cath Everett A risky business: ISO 31000 and 27005 unwrapped , 2011 .

[25]  Kevin McCormack,et al.  Supply Chain Risk in Turbulent Environments – A Conceptual Model for Managing Supply Chain Network Risk , 2009 .

[26]  Olivier Lavastre,et al.  Supply chain risk management in French companies , 2012, Decis. Support Syst..

[27]  F. Jia,et al.  Mitigation of supply chain relational risk caused by cultural differences between China and the West , 2010 .

[28]  Kostas S. Metaxiotis,et al.  Dynamic risk management system for the modeling, optimal adaptation and implementation of an ERP system , 2005, Inf. Manag. Comput. Security.

[29]  Jennifer Blackhurst,et al.  A model for inbound supply risk analysis , 2006, Comput. Ind..

[30]  Matotek Marija,et al.  Supply Chain Risk Management Using Software Tool , 2015 .

[31]  Anand Nair,et al.  ISO 9000 Internalization and Organizational Commitment—Implications for Process Improvement and Operational Performance , 2014, IEEE Transactions on Engineering Management.

[32]  Sabine Matook,et al.  Supplier development with benchmarking as part of a comprehensive supplier risk management framework , 2009 .

[33]  Hsiao-Fan Wang,et al.  An integrated operation module for individual risk management , 2009, Eur. J. Oper. Res..

[34]  Alessio Ishizaka,et al.  AHPSort: an AHP-based method for sorting problems , 2012 .

[35]  Samir Dani,et al.  Supply Chain Risk Management: Present and Future Scope , 2012 .

[36]  Nukala Viswanadham,et al.  Analytical Framework for the Management of Risk in Supply Chains , 2007, IEEE Transactions on Automation Science and Engineering.

[37]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[38]  Maria Silene Alexandre Leite,et al.  Supply chain risk classification: discussion and proposal , 2015 .

[39]  José Moyano-Fuentes,et al.  Lean Management, Supply Chain Management and Sustainability: A Literature Review , 2014 .

[40]  G. Zsidisin,et al.  An institutional theory perspective of business continuity planning for purchasing and supply management , 2005 .

[41]  D. Tranfield,et al.  Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .

[42]  D. Lambert,et al.  Issues in Supply Chain Management , 2000 .

[43]  Eduardo Gomes Salgado,et al.  Analytic hierarchy prioritisation of new product development activities for electronics manufacturing , 2012 .

[44]  M. Quaddus,et al.  Supply chain risk management (SCRM): a case study on the automotive and electronic industries in Brazil , 2009 .

[45]  David Thomas,et al.  State of the art in supply chain risk management research: empirical and conceptual findings and a roadmap for the implementation in practice , 2010, Logistics Research.

[46]  O. Khan,et al.  Risk and supply chain management: creating a research agenda , 2007 .

[47]  R Taylor,et al.  Simulation as an essential tool for advanced manufacturing technology problems , 2000 .

[48]  Luis G. Vargas,et al.  ADDRESSING WITH BREVITY CRITICISMS OF THE ANALYTIC HIERARCHY PROCESS , 2009 .

[49]  N. Pinardi,et al.  Towards a common oil spill risk assessment framework – Adapting ISO 31000 and addressing uncertainties. , 2015, Journal of environmental management.

[50]  Carl Marcus Wallenburg,et al.  Dealing with supply chain risks , 2012 .

[51]  Claudemir Leif Tramarico,et al.  Multi-criteria assessment of the benefits of a supply chain management training considering green issues , 2017 .

[52]  H. Kunreuther,et al.  Operations Risk Management: Overview of Paul Kleindorfer's Contributions , 2007 .

[53]  I. Nyoman Pujawan,et al.  House of risk: a model for proactive supply chain risk management , 2009, Bus. Process. Manag. J..

[54]  Ravi Shankar,et al.  Supply chain risk mitigation: modeling the enablers , 2006, Bus. Process. Manag. J..

[55]  K. B. Hendricks,et al.  The Effect of Operational Slack, Diversification, and Vertical Relatedness on the Stock Market Reaction to Supply Chain Disruptions , 2009 .

[56]  Stephan M. Wagner,et al.  AN EMPIRICAL EXAMINATION OF SUPPLY CHAIN PERFORMANCE ALONG SEVERAL DIMENSIONS OF RISK , 2008 .

[57]  B. Ritchie,et al.  Supply chain risk management and performance: A guiding framework for future development , 2007 .

[58]  Gonca Tuncel,et al.  Risk assessment and management for supply chain networks: A case study , 2010, Comput. Ind..

[59]  Diana White,et al.  APPLICATION OF SYSTEMS THINKING TO RISK MANAGEMENT:: A REVIEW OF THE LITERATURE , 1995 .

[60]  C. Blome,et al.  Supply Chain Risk Management in Financial Crises – A Multiple Case-Study Approach , 2011 .

[61]  J. Mentzer,et al.  GLOBAL SUPPLY CHAIN RISK MANAGEMENT , 2008 .

[62]  M. Giannakis,et al.  A multi-agent based framework for supply chain risk management , 2011 .

[63]  María José Chávez de Diego,et al.  Expert system for predicting buildings service life under ISO 31000 standard. Application in architectural heritage , 2016 .

[64]  Yingchun Guo Research on Knowledge-Oriented Supply Chain Risk Management System Model , 2011 .

[65]  Gerd J. Hahn,et al.  Value-Based Performance and Risk Management in Supply Chains: A Robust Optimization Approach , 2012 .

[66]  H. Walker,et al.  Risk in supply networks , 2003 .

[67]  Stefan Seuring,et al.  From a literature review to a conceptual framework for sustainable supply chain management , 2008 .

[68]  J. Hallikas,et al.  Risk management processes in supplier networks , 2004 .

[69]  Kalyanmoy Deb,et al.  Multiple Criteria Decision Making, Multiattribute Utility Theory: Recent Accomplishments and What Lies Ahead , 2008, Manag. Sci..

[70]  Bo Chen,et al.  A comprehensive decision-making model for risk management of supply chain , 2011, Expert Syst. Appl..

[71]  R. Thorpe,et al.  Using Knowledge within Small and Medium-Sized Firms: A Systematic Review of the Evidence , 2005 .

[72]  N. Pletneva COMMENTARY ON THE INTERNATIONAL STANDARD ISO 31000–2009 “RISK MANAGEMENT. PRINCIPLES AND GUIDELINES” , 2014 .

[73]  Christopher S. Tang,et al.  Researchers' Perspectives on Supply Chain Risk Management , 2011 .

[74]  Thomas J. Goldsby,et al.  Supply chain risks: a review and typology , 2009 .